Loading…
Loading…
2,843 results • Recent activity
ECHP-I- Checking and monitoring of mechanical equipments in Secondary Crusher House-I
SUPPLY, ERECTION, AND COMMISSIONING OF 200 NB M.S. SEAMLESS PIPES AND BENDS FOR UNIT I HEAVY OIL DISCHARGE LINE FOR A LENGTH OF 500 MTR REACH I, FUEL OIL PUMP HOUSE TO NEAR ESP III
ECHP-I- Attending breakdown work, maintenance of pull chord switches , magnetic separators and lighting works in all Conveyors at Primary Crusher House-I and Secondary Crusher House-I.
SUPPLY, ERECTION, AND COMMISSIONING OF 200 NB M.S. SEAMLESS PIPES AND BENDS FOR UNIT II HEAVY OIL DISCHARGE LINE FOR A LENGTH OF 500 MTR REACH I, FUEL OIL PUMP HOUSE TO NEAR ESP III
Regular Maintenance of the Tree Saplings planted on the West side of GLR 3 for the period from 01.04.2026 to 31.03.2027
Regular Maintenance to the existing lawns, flower beds, hedge plants and casuarinas trees, etc. around Occupational Health Center Building, along 302.5 W road on both sides and in front of Sewage Treatment Plant area in 275 N road et