Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
917 results • Latest
Construction of Auditorium for Radhakrishanan Govt. Medical College at Hamirpur (HP) (SH-Balance work of E.I. therein)
Repair and restoration work on link road Pandoga Ispur road to Kyarian Km 0/00 to 2/900 SH P/L CC Pavement in RD 2/753 to 2/900 under PDNA 2025
Repair and restoration work on link road village Khad mohalla Sonkiyan Km 0/00 to 3/00 SH C/o R/wall in RD 2/200 to 2/300 both sides under PDNA 2025
Balance work for Repair Maintenance of HSC Thanikpura SH Flooring, Plastering Painting work sanitary work Aluminium work boundary wall etc deposit work
Restoration of rain damage on link road from Jole to Khurwain Km. 0/0 to 8/400 (SH C.C. Pavement from RD 2/540 to 2/570)
Restoration of rain damage on link road to Sada Shiv Temple Km. 0/0 to 2/030 (SH C/o R/wall at RD 1/010 to 1/032)
Restoration of rain damages on Bhaira to Hamboli road Km. 0/0 to 4/0 (SH C/o R/wall at RD 0/510 to 1/520)
Restoration of rain damages on link road to Sada Shiv Temple km 0/0 to 2/100 (SHProviding and Laying 30mm thick Bituminous concrete km 1/700 to 2/000) under PDNA-2023
SDF/2026/170, R/O (Repair of) Restoration of Repoh Kudet Jandoh Suri Paloh road Km 0/0 to 15/500 (SH C/o U shape drain cud Edge wall at RD 8/200 to 8/240 RHS Providing, laying RCC slab over drain for approach path at various RDs), GP JABEHAR. Deposit
NDF2026143RO Repair of Restoration of rain damages on Amb Andora Gagret road Km 000 to 3720 SH Repair of damaged road between RD 0340 to 0473 RHS including grating portion NP Amb Deposit Work
Restoration of rain damage on link road to village Satothar Km 000 to 1400 SH PL CC Interlocking paver block at RD 1195 to 1225 and Construction of Ushape drain at RD 1145 to 1245
RRD on Bharwain Chintpurni Kandrori Damtal road KM 000 to 15310 SH Construction of Rwall at RD 13949 to 13963
SH- C/o R/wall in Km 16/060 to 16/084, B/wall in Km 15/750 to 15/850 and C.C. in Berms Km 15/750 to 15/850) Under PDNA-2025
SH- C/o Edge wall from Rd 0/200 to 0/600) Under Head PDNA-2025
SH- C/o R/wall from Rd 0/240 to 0/260, Drain from Rd 0/200 to 0/400 and Edge wall) Under Head PDNA-2025
SH- C/o Edge wall with V-shape Drain, R/wall and C.C. in berms in between Km 0/400 to 1/000) Under PDNA-2025
SH- C/o C.C. Pavement from Rd 0/300 to 0/450 and V-shape Drain) Under Head PDNA-2025
SH-C/o R/wall in wire crate from Rd 2/960 to 2/980 and U-shape drain from Rd 2/990 to 3/102 ) Under Head PDNA-2025
Supply, Installation, Repair, Testing and Commissioning of Fire Hydrant, Fire Alarm and Fire Protection System components at IIIT Una
Restoration and repair of Sanoli to Santoshgarh road km.0.0 to 2.200 (SH C O U shape drain along with MS grating cover at RD.0.0 both sides RD.0.290 RHS and RD.0.415 LHS (BPCL deposit)
Restoration and repair due to laying of MDPE Natural Gas pipe line on link road from Ajouli to Sanoli upto Punjab Boundary km.0.0 to 4.600 (SH CO CC pavement at RD.1.285 to 1.675 Both sides and RD.2.450 to 2.825 Both sides (BPCL deposit)
(Sub head Construction of Water Pedestals and Installation of Public Taps with Real-Time Water Quality Monitoring System in the Chintpurni Ji Area, Tehsil Bharwain, District Una HP
Sub head Providing laying of HDPE pipe in Distribution system and construction of out lets of LIS Behli 1st Job 7 NABARD
Sub head Providing laying of HDPE pipe in Distribution system and construction of out lets of LIS Behli 1st Job 6 NABARD
Shredding Machine/Paper Shredder (Q2)
Sub Head Providing skilled/unskilled manpower operation of Schemes for 2 Nos. pump Operator ,1 Nos. Chokidar/Beldar for 365 days)-RM
Tender for repair and maintenance of type-l Quarters (block), at 132kVkV Sub-Station, HPSEBL, Gurplah (Tahliwal) under Electrical System Division, HPSEBL, Rakkar, Una (H.P).
Restoration of rain damages on link road from Saloi to Fanged km 000 to 300 SH CO Retaining wall and CC Pavement in km 2860 to 300 Under PDNA2023
Restoration of rain damages on Karluhi to Mandholi road km 000 to 5500 SH Const of Breast wall in km 2150 to 2170 Against DC Deposit
Restoration of rain damages on Karluhi to Mandholi road km 000 to 5500 SH Const of Retaining wall at RD 0550 to 0570 0600 to 0615 and Breast wall at RD 0800 to 0860
C/o ext. of 900mm dia Hume pipe culvert in Km 0/200 and both side wing wall) Under BPCL
C/o 900mm dia Hume pipe culvert at RD 1/000 a/w wing wall) Under Head O.F.C.
(SH Construction of Sewage treatment plant of capacity 1.00 MLD, Polishing Pond for reuse of treated effluent with allied Civil work ,C/O intermittent pumping station within the STP premises P/L/J and testing of Sewer network with allied civil etc
Haulage & Housekeeping Services - Haulage and Houskeeping; LPG Bottling Plant
Construction of Govt High School Bane Di Hatti Tehsil Ghanari Distt Una HP SH Co Concrete platform in front of School Building Under Deposit
Repair Restoration of Rain Darnages on NMT road from Mubarikpur to Marwari Punjab Boundary KM 54675 to Km 72555 SH Repair of Existing Wearing Coat of Bridge at RD 64645 to 64685 and 64755 to 64830 Under PDNA 2023
Repair Restoration of Rain Damages on link road Daulatpur to Behra Km 000 to 5075 SHRepair of road due to road crust damaged Pot Hole at Various RDs
Repair Restoration of Rain Damages on link road Sunkali to Gokul Nagar Km 000 to 2165 and link road Harijan Basti Bhanjal Km 000 to 3000 SH Repair of road due to road crust damaged Pot Hole at Various RDs
AED/126/2026-27
Repair Restoration of Rain Damages on link road Bhaderkali to Pirthipur via Dangoh Km 000 to 4/600 link road Bhaderkali to Bajigar Mohalla Km 000 to 1860 and link road Fathepur to Jawal via Jawal Behma Km 000 to 5000 SH Repair of road due to
Repair Restoration of Rain Damages Jadla Pratham to Nara Dukki Km 000 to 8300 SHRepair of road due to road crust damaged Pot Hole at Various RDs Under PDNA 2023
Repair Restoration of Rain Damages on link road Harijan Basti Karluhi Athmah road km 000 to 200 SH Co Retaining wall between RD 1000 to 1050 Under PDNA 2025
Construction of Govt Sr Sec School Mawa Kohlan Tehsil Ghanari Distt Una HP SH Site development and Co 2 No class room with verandah and stairs Under Deposit
CO Ambulance road from LR to Masanda Basti SC Basti OBC Basti GP Amlehar SHConstruction of Jeepable road Cement Concrete pavement between KM 000 to 0130Under MMSY-2026-27
Periodical maintenance on Tahliwala Garshankar HP Boundary road Km 0/0 to 7/700 MDR041 SH P/L 30mm thick Bituminous concrete with, side lines, cat eyes
Technically sanctioned vide this office letter No. 4346-49 dated 16- 10-2026.
Periodical maintenance on link road from Upper Karampur to Swan border Km 0/0 to 1/00 VR181 SH P/L 30mm thick Bituminous concrete, side line, zebra crossing, thermoplastic, cat eyes
Periodical maintenance on link road to mohalla Tipperian Km 3/480 to 4/080 VR168 and L/R Ispur to Pandoga via Kyrain Km 2/00 to 2/180 VR 150 SH P/L 30mm thick Bituminous concrete, side line, zebra crossing, thermoplastic, cat eyes
Repair Restoration of Rain Damages link road to village Oel from Gagret Oel Ispur road Km 000 to 3275 SH Construction of Retaining wall and UShape Drain at various RDs Under PDNA 2023
Repair Restoration of Rain Damages link road Gagret Oel Ispur to Bhawa siriyan Km 000 to 2200 SH Co PCC UDrain from RD 3200 to 3300 and Retaining on Downstream side existing culvert approaches at RD 1765 Under PDNA 2023