Loading…
Loading…
1,172 results • Latest
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2) (3 (3 ))
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2) (3 (3 ))
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2) (3 (3 ))
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) (3 (3 ))
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) (3 (3 ))
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
BEND PIPE ASSEMBLY FOR OIL PIPE LINE OF [BEND PIPE ASSEMBLY FOR OIL PIPE LINE OF HETT -5400 Transformer MPH to RH as per Drg no. BHEL-34661950036 Rev.- 04]
Lightening arrestor
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) (3 (3 ))
Entry and Mid Level Desktop Computer (Q2), Computer Printer (V2) (Q2), High End Laptop - Notebook (Q2), Line Interactive UPS with AVR (V2) (Q2) (3 (3 ))
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Admin
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Hiring of Consultants - Milestone/Deliverable Based - CONSULTANT; Institutional Development, Organizational Restructuring/Design; Yes; Hybrid(As specified in scope of work)
Coconut Shell Powder (ONGC) (Q3)
Tree Guard (V3) (Q3) (3 (3 ))
ICU Bed (Q3)
Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 320 hours; Outstation 24*7
Set of Repair kit of Pressure Regulato
Light weight spanner
SS PIPE FITTINGS FOR WAG-9H 3PHASE LOCOS
Karl Fischer Reagent for couloumetric determination of water
DIGITAL DIAL INDICATOR RANGE
Procurement of plasser make spare for Track machine.
Strip light with hand sensor lamp 5W- Battery
Set of MS Plain Washers for Conventional bogie brake rigging in 3-Phase Locos
Procurement of 50 Ton capacity Hydraulic Jack with Traversing base.
Entry and Mid Level Laptop - Notebook (Q2), High End Desktop Computer (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Supply of Adjustable Spanner
Supply, Installation and commissioning of CCTV
PABX System - EPABX (V2) (Q2), Add on Phones/Consols Endpoint for PABX System (Q2) (3 (3 ))
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2), Ethernet Cables (Q2) (3 (3 ))
Facility Management Services - LumpSum Based - Installation Commissioning of Smart Class room Set Up; Installation Commissioning of Smart Class room Set Up; Consumables to be provided by service provider (inclusive in contract cost)
Self-Fusing / Self amalgamating tape
Camera for CCTV System (V3) (Q2), Optical Fibre Cable for Networking (Q3) (3 (3 ))
Supply, installation and commissioning of Motorised winch machine capacity 07 Ton
Lamp 3w flood spot light and 3w s LED spot light with 500 lumen
Set of Extraction tools consisting of 2 items