Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City Pkg 1 from Km 0.000-Km7.926 (TL 20.00Km MCW Loop Ramp Link Road) in UP on HAM
Linkage with1912 complaint management system, Deployment of Fault Rectification Team (FRT)
Linkage with 1912 complaint management system, Deployment of Fault Rectification Team (FRT) IN EDC 1 JAUNPUR
Linkage with 1912 complaint management system, Deployment of Fault Rectification Team (FRT) IN EDC 1 PRAYAGRAJ
Linkage with 1912 complaint management system, Deployment of Fault Rectification Team (FRT) IN EDC 2 PRAYAGRAJ
Linkage with 1912 complaint management system, Deployment of Fault Rectification Team (FRT) IN EDC 2 JAUNPUR
Working of Track Geometry by Pretamping/Post tamping measurement using Timble Gedo Voryss trolley system or similar equipment system under Jurisdiction of Sr. DEN/II/Varanasi.
Supply and AMC of Drones for Transmission Line Patrolling
Construction of LVUP on NH927 as long term rectification of MoRTH identified blackspot in Bahraich bypass to Rupaidha NH927 in the state of Uttar Pradesh on EPC Mode
Provision of Metal barrier fencing on both sides parallel to the track at Tress passing location under jurisdiction of Sr. DEN/II/Varanasi. (Total = 3800 x 2 = 7600 Meter)