Loading…
Loading…
880 results • Latest
PROVN OF SINGLE MEN BARRACKS FOR AGNIVEER INCLUDING COOK HOUSE AT 39 GORKHA TRAINING CENTRE VARANASI
Design, Supply, Installation, testing & commissioning of 3.0 MW/ 6.0 MWh Battery Energy Storage System at BLW Premises.
TTR and TRR of Main line of different yard in Manjhagarh - Thawe section and KathKuiyan - Lakshmiganj Section. (Total = 32 Set TTR and 8 Km TRR)
PVC Insulated (Heavy Duty) Electric Cables Marked To IS 1554 (Part 1) (V2) (Q2), XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Development of a Link Connector Corridor connecting the NH-31 and Varanasi Ring Road along the River Varuna for Decongestion of Varanasi City PKG2 from Km11.744-km19.420 (TL 14.720Km including Loop Ramp) in the State of Uttar Pradesh on HAM
Development of a Link/Connector Corridor connecting the NH 31 and Varanasi Ring Road along the River Varuna for Decongestion of Varanasi City PKG 1 from Km 0.000 to Km 11.744 (TL 28.498 Km including MCW/Flyover/Loop/Ramp/Link Road) in UP on HAM.
Patient Gown (Q2), Surgical Gowns Conforming to IS 17334 (Q2), Surgical Drapes Conforming to IS 17334 (Q2) (3 (3 ))
Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City PKG2 from Km7.926-Km18.560 (TL 26.039Km MCW FOB Loop Ramp) in UP on HAM
Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City Pkg 1 from Km 0.000-Km7.926 (TL 20.00Km MCW Loop Ramp Link Road) in UP on HAM
Linkage with1912 complaint management system, Deployment of Fault Rectification Team (FRT)