Loading…
Loading…
1,189 results • Recent activity
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Plasticized PVC Tapes with Non-Thermosetting Adhesive for electrical purpose (V2) ISI marked to IS 7809 (Part 3/Sec1) (Q2), Self Ballasted LED Lamps (LED Bulb) (V3) Conforming to IS 16102 (Part 2) (Under BIS Scheme - II) (Q2), LED Bulkhead Light (Q3), XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), Flat Cable, Copper Conductor with PVC Insulation and Sheathed ISI Marked To IS 694 (Q3), PVC Insulated Unsheathed Cable with Flexible Conductor ISI Marked To IS 694 (Q2), Aluminium Conductor with PVC Insulation and Sheathed ISI Marked To IS 694 (Q3), LED Luminaire (Recessed Luminaire) (V3) Conforming to IS 10322 (Part 5/Section 2) (Q3) (3 (3 ))
Providing , And Errecting DEEP STAMBHA As Per Detailed Drawing Made Up Using Black Newasa Stone Nanded Stone at Mata Mandir Premisses in Mata Mandir ward, At Hinganghat. Dist.Wardha
Downlead Clamp & GS Lugs
PROVN OF RAIN WATER HARVESTING WITH CONNECTED WORKS NEAR SHAKTI STHAL AND HANUMAN TEMPLE AT PICKET HILL IN RA AT PULGAON MIL STN
REPAIR TO BOUNDARY WALL , FENCING, DRAIN, FOOTPATH, HARDSTANDING IN ZONE A RA AT CAD PULGAON