Loading…
Loading…
482 results • Latest
Removal of jungle and Silt From km 0.00 to 3.500 Km of Lateral 20 of Dy-6 of SBC And Removal of jungle and Silt From km 30.00 to 36.00 Km of Dy-6 of SBC ,
Removal of Jungle & silt at km 6.00 to 9.00km of BD-7 of SBC , Removal of Jungle & silt at km 9.00 to 12.00km of BD-7 of SBC
AME of canal for DY-6 (12.00 to 36.00 km) and its laterals of SBC for the year 2026-27
AME of canal for Distry No. 4A, 5, 5A,6,8,8A with laterals of SBC for the year 2026-27
AME of canal for Distry No.1,2,3,3A & 4 with laterals of sbc for the year 2026-27
AME of canal for Distry No.7 & BD-7 of SBC for the year 2026-27
Removal of jungle and silt,from Ch 0.00 to 5.00 km (In selected reaches) of lateral 03 of Dy-6, from Ch 0.0 to 2.00 km (In selected reaches) sub lateral 1 of lateral 03 of Dy-6 and from Ch 0.00 to 8.00 km (In selected reaches) of lateral 09 of Dy-6 of SBC
Removal of jungle and scarifying of SR From km 0.00 to 11.00 km (in selected reaches) of Dy -05 Removal of jungle and silt from Ch 11.00 to 17.00 km (In selected reaches) of Dy-5, from Ch 0.00 to 0.8 km (In selected reaches) of lateral 01 of Dy-5 from Ch 0.00 to 1.50 km (In selected reaches) of lateral 04 of Dy-5 and from Ch 0.00 to 1.00 km (In selected reaches) of lateral 09 of Dy-5 of SBC
drug rack, Bag For Field Visit, Chairs Waiting Area, Suction Tube, BMW Bins Three Bins, Peak Flow Meter, Stethoscope, Blood Pressure Machine Digital, Thermometer Digital, Torch, Pulse oximeter, Feeding tubes orRyles tubes, Cotton, Striped Scissors, Curved Scissors, Toother Forceps, Untoothed Forceps, Curverd Artery foreceps, Light weight foldable stool, Surgical tray, Kidney tray, Sterile syringe10ml, Disposable Gloves, Sterile gloves, Povodine ointment, Hypo allergenic tape micropore NA 7.5cmx9.l mts 1x4rolls, Dressing trays, Adhesive tapesl0cmx10mtr1x3rolls, Snellen chart, Urine bags, Gauze bandages, Foleys catheter, SterileWatert0ml, Dressing pad, Lignocane, savlon or antiseptic, Hand Sanitizer, Disposable mask, Wheel Chair, Wall Clock
Design, Print, Supply and Errection of set of 04 types of display boards
Sinking of Borewell Behind of SBI Bank in Ward No. 07 & Laying of GI Pipeline from Borewell near Sadananda Maharaj Math via Kembhavi Parasanalli road to Conneting OHT at W. No 21 of Kembhavi Town
Monthly Basis Cab & Taxi Hiring Services - SUV; 1500kmX176 Hrs; Local
Repair and Reconstruction of the protection wall at Ch 6.9 km of Dy-7 JBC
Jungle clearance, removal of silt and improvements to SR of Dy-3A Dy-3B Dy-4 and Lat-1 and 2 of Dy-4 of JBC
Package estimate of Removal of Jungle , Improvements to SR from Ch 20.00 to 30.00 km of JBC
Package estimate of Jungle clearance, Removal of silt, and Improvements to SR from Ch 0.00 km to 4.00 km and Ch6.00 km to 9.00 km of DY7 of JBC
Reconstruction of Slab CTC at ch.4.50km of lat-13 of dy-14
Package estimate of Jungle clearance, Removal of silt, from Ch 4.00 km to 6.00 km and Lat -1 from 0.00 km to 1.5 km and Lat -2 from m Ch 0.00 km to 1.00 km of DY-7 of JBC
Removal of silt and jungle clearance from CH 0.00 TO 5.0KM OF DY-13 AND LAT-1,2 and 3 OF DY-13 OF JBC
REMOVAL OF SILT AND JUNGLE CLEARANCE OF Lat-8,9 of dy-14 and Lat-11,12 and 13 of DY14 of JBC
Construction of head regulator at Ch 65km of JBC Main canal.
Reconstrution of damaged CTC at 3.00 km of Dy-7 of JBC.
Improvement to side Drain at ch.3.4km of MLIS-3
Package estimate of Restoration of damaged embankment (SR side) at Ch 31.52 km AND Pitching and RCC on SR side at Ch .21.535 & 27.020 km of DY-7 of JBC
Restoration damaged CC lining at Ch 0.15km,2.20km,8.70km and 9.30km of JBC Main canal.
Reconstruction of Chute wall from at ch1.80 km to 1.950km of Lat-2 of Dy-13 of JBC.
Reconstruction of Damaged cc lining at ch 3.00 to 3.40km of lat-8 of dy-14 & CD work ch 3.45km of lat-8 of dy-14.
Jungle clearance, removal of silt and improvements to SR of Dy-1, Lat-1,2, 3 of Dy-1 and 18.00km to 20.00km of JBC
Package estimate of Jungle clearence ,removal of silt and improvement to SR from Ch 0.00 to 2.10 km of Dy-7A of JBC ,From Ch 0.00 to 3.00km of DY-8 of JBC and lateral-1 and Lateral-2 of DY-8 of JBC
Removal of silt and jungle clearance of Lat-4,5 and 6 of DY-14 and Lat-5A,7 & 10 OF DY-14 OF JBC
Removal of silt and jungle clearance from Ch 0.00 to 6.0km and 6.0 to 10km of Dy-14 & Lat-1,2 and 3 of Dy-14 of JBC.
Removal of Jungle, clearing of side drains , Improvements to SR from Ch 30.00 to 40.00 km of JBC.
jungle clearance,Removal of silt and improvement to SR of main canal from 10.00 to 15.00km of MLIS-3
REMOVAL OF SILT AND JUNGLE CLEARANCE FROM CH 0.00 TO 3.0KM OF BD 1 and Lat-2, 3 and 7 of BD1 of DY-14 of JBC
REMOVAL OF SILT AND JUNGLE CLEARANCE OF Main canal from ch 0.00km to 10.00km and escape of MILS Lift-3
Reconstruction of CTC at ch 1.25 km of Lat-1 of Dy-13& Chute wall from at ch 1.0 km to 1.050km of Lat-1 of Dy-13 of JBC
Improvements to Embankment from Ch12.26km to 12.56km of main canal of MLIS-3.
Construction of CC Road and Drain at Maddaraki Village in Shahapur Taluka, Dist, Yadgir. Under, KKRDB Macro General for the year 2025-26.
Construction of Stone Pitching at the Bhima crossing on the Kandhalli-Saidapur Road in Wadagera Taluka, Dist, Yadgir. Under, KKRDB Macro for the year 2025-26.
Handling and Transport on Lumpsum Basis - Transportation of Railway material from anywhere to anywhere within country by road for a distance more than 60 KMs on distance and weight basis
Installation of LED street lights in the Scheduled Caste Colony of the following villages under Yadgir Assembly Constituency, 1) Kadamgera-32 2) Kyathanal-22, 3) Kurukundi-22, 4) Horatur-27, 5) Mallalli-17, 6) Tekral-17, 7) Agnihal-21, 8) Bilhar-27, 9) Kandalli-27, 10) Machanur-17, 11) Channur-22, 12) Konkal-25, 13) Gondenur-17, 14) Kodal-29, 15) Gonal-17, 16) Shivpur-23, 17) Joladadgi-21, 18) Sugur-22, 19) Ibrahimpur-20, 20) Hurasgundagi-27, 21) Chatnalli-27, 22) Tangadagi -30, 23) Bidarani -19, 24) Balakal-17, 25) Maramakal-27, 26) Gurusunagi-27, 27) Kumanur-22, 28) Godihal-32, 29) Halagera-27, 30) Arjunagi-27 31) Konahalli-27, 32) Vadagera-27, 33) Birnakal Tanda-17, 34) Kamalanayak Tanda-17, 35) Tumkur -27, 36) Itagi-22, 37) Abhisihal -23, 38) Bendebemballi -27, 39) Rotnadagi-17, 40) Kadarapur-14, 41) Gurusunagi-15, 42) Biranala-15, 43) Ashokanagar-15, 44) Varkanahalli-15, 45) R.Hosalli-15
Construction of New Grama Panchayat Building at Belagundi Village in Yadgir Taluk (SC Bidders Only)
CONSTRUCTION OF TOILET TO GOVERNMENT HIGHER PRIMARY SCHOOL AT HARANAGERA TANDA IN SHAHAPUR TALUKA OF YADAGIR DIST.
Construction of One Class Room to Govt. Heigher Primary School Building at Shivapur Village in Gurmitkal Constituency Yadgir Taluka & Dist Dise Code 29331015201
Construction of Jagajyothi Basaveshwara Puthali and Nijasharana Ambigara Chowdayya Puthali in Gurmitakal Constitution at Gurmitakal City Yadgir District
IMPROVEMENTS OF BRIDGE AT SAWOOR VILLAGE IN GURMITAKAL CONSTITUENCY IN YADGIR DISTRICT.(UNDER 5054-80-190-0-01-132 KRDCL CAPITAL EXPENDITURE FOR THE YEAR 2025-26)
PROCUREMENT OF ESSENTIAL ENT MEDICATIONS
Construction of 2 Classrooms at Govt HPS Parasanalli in Shorapur Taluka District Yadgir Under 4202-01-201-1-04-(139) (Education) for the Year 2025-26 (DICE CODE 29330817002)(RESERVED FOR SC)
Construction of 1 Classrooms at Govt HPS Rattal in Shorapur Taluka District Yadgir (Under 4202-01-201-1-04-(139) (Education) for the Year 2025-26) (DICE CODE 29330818402)