Loading…
Loading…
158 results • Latest
ARC for PreventiveRoutine and Breakdown Maintenance of Electrical System Equipments HT LT Switchgear, HT LT Motors, Illumination System, Generator Protection system and Power and Control cables etc. Installed at DCRTPP, Yamuna Nagar for
Part A
Providing and fixing of Polycarbonate Sheets and M.S. Angles for filling of gaps in NDCT of Unit-II at DCRTPP, HPGCL, Yamuna Nagar
Providing and fixing of 1.5mm polycarbonate sheet on MS angle (50x50x6mm) frame fixed with stainless steel self screws including labour, TandP, scaffolding, electricity extension arrangement etc. complete in all respect. (Excluding cost of MS angle, including labour charges for fabrication of MS angle iron frames over all the gaps around periphery of cooling tower).
Providing and Laying of NP-3 Pipe From Ambedkar Bhawan Sobhagya resort road to Gadhouli Road via sports complex tejli stadium in Ward No.09, RECALL
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
Construction of street and P/Laying of RCC NP-2 Pipe from JSP Advisor to HO Parveen Rani in Amar vihar colony ward no 03 for l/c society ltd
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
RCONSTRUCTION OF DAMAGED DRY BRICK ON EDGE INTERNAL ROADS
RECONSTRUCTION OF INTERNAL ROADS OF HSDC COMPLEX AT YAMUNANAGAR
PROVIDING 1000 FT STONE STEINING L S FOR THE PROTECTION OF ABADI and AGRICULTURAL LAND OF VILLAGE NAGLI ON RIVER PATHRALA
Select, Excess (+), Less (-) Less (-)