e-Tender notice dated 07-08-2026; NIT uploaded on 07/08/2026 at 18:54.
- Open e Tender No. DYCE-C-SUR-HG-01-2026.
- Bidding Start Date on NIT: 24/08/2026.
Loading…
Construction of Earthwork, Major Bridges, Minor Bridges, Track work and associated works, Retaining Wall, Side Drains, Station Building, Platform, Fencing and Road Work in connection with Additional Hotgi Bye Pass Line (5.85 km) in Solapur Division of Central Railway.
Central Railway · Solapur, MaharashtraDYCE-C-SUR-HG-01-2026~CR
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
7 Aug 2026
7 Sept 2026
₹32.3 Cr
₹64.6 L
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
e-Tender notice dated 07-08-2026; NIT uploaded on 07/08/2026 at 18:54.
Pre-Bid Conference is not required and Pre-Bid Conference Date/Time is Not Applicable.
Tender closes on 07/09/2026 at 15:00 Hrs on IREPS; only e-bids accepted up to that time.
Technical bid opens online after tender closing; financial bid follows two-packet process.
Offer validity is 90 days from the date fixed for closing of the tender.
Completion period is 24 Months; maintenance period is 48 Months.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Advertised tender value is Rs. 32,29,44,452.88.
Earnest Money / Bid Security is Rs. 64,58,900.00; payable online via e-payment gateway or as Bank Guarantee.
Successful bidder must submit Performance Guarantee of 5% of original contract value within 21 days of LOA (extendable to 60 days with 12% p.a. penal interest).
Security Deposit is 5% of contract value; Bid Security is retained/encashed as part SD and balance recovered at 6% of bill amount (or deposited by cash/TDR/BG).
Payments are electronic (NEFT/ECS/EFT); rates are all-inclusive subject to GST provisions; PVC applies as advertised value exceeds Rs.2 crore.
Bonus of 1% per 30 days early completion, capped at 5% of original contract value, is available because advertised value exceeds Rs.50 crore and original completion is 12 months or more (subject to conditions).
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
In last 7 years ending last day of month previous to tender invitation month: 3 similar works ≥30%, or 2 ≥40%, or 1 ≥60% of advertised value; similar work defined as any Civil Engineering work involving building construction work.
Minimum average annual contractual turnover of V/N or V, whichever is less (V = advertised value in crore; N = years for completion).
Because advertised value exceeds Rs.10 crore, bid capacity must be evaluated; available bid capacity must be ≥ estimated cost or offer is rejected.
JV is allowed with maximum 3 members; consortium is not allowed.
Bidder must not be blacklisted/debarred by Railways or any other Ministry/Department of GoI on bid submission date; land-border country restrictions apply.
Bidders must be GST compliant and quote tax structure/rates as per GST law.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Construction works for Additional Hotgi Bye Pass Line (5.85 km) in Solapur Division of Central Railway.
Tentative scope covers station building/roads/fencing, major & minor bridges, drains, retaining walls, earthwork for new line, and track laying/linking in Tilati yard, plus miscellaneous related items.
Complete the work within 24 months from LOA; maintain for 48 months; execute to Railway GCC, special conditions, drawings and technical specifications.
Limited working space and no motorable approach to most sites; contractor bears approach roads, permissions, traffic diversions and idle-time risk.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Bids only through e-tendering on www.ireps.gov.in; two-packet system; no manual offers.
If Bid Security is by Bank Guarantee, original BG must be delivered in person before the closing date excluding the last bid-submission date.
Tender must be signed by legally competent persons; POA for agents must be stamped and notarised/authenticated by Magistrate, else summary rejection.
Documents (a)–(h) in Special Instructions must accompany the online bid; missing documents cause summary rejection with no post-tender communication.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
No corrigendum/addendum files are present; original NIT and tender document values apply as published.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
GCC Para 5(2) requires BG valid 90 days beyond bid validity, while Para 5(3)(I)(iv) requires 120 days beyond tender validity.
NIT name includes Track work and associated works; cover/scope headings often omit that phrase, yet scope item 04 and BOQ include track linking.
Eligibility similar work is defined only as Civil Engineering work involving building construction, while the tender is primarily earthwork, bridges, track and associated works.
Special Conditions require at least two graduate Civil engineers with 3+ years bridge construction experience, while Additional Special Conditions require at least one graduate Civil engineer with 3+ years building/sheds experience.
Acceptance of Tender page prints Open e Tender No. DyCE-C-SUR-01-2026 instead of DYCE-C-SUR-HG-01-2026.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask Railway to confirm if credentials must be building-construction works only, or whether earthwork/bridge/track civil works also qualify given the actual scope.
Seek written confirmation whether BG must be valid for 90 or 120 days beyond the 90-day offer validity.
Confirm the nominated official and whether 'before closing date excluding last date' means latest by 06/09/2026 working hours.
Clarify whether two bridge-experienced graduate engineers, one building-experienced engineer, or both requirements apply simultaneously, and the applicable monthly penalty.
Seek clarity on extent of contractor design liability, proof-checking turnaround, and whether Railway delays in design approval entitle time extension without LD given the no-claim clauses.
Request status of land availability and any Railway facilitation for temporary approach roads through private/government/forest land, since cost and delay risk are fully on contractor.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Contractor-delay extensions under Clause 17B attract LD up to a maximum of 5% of contract value, on a stepped weekly scale.
Railway disclaims liability for drawing delays, late Railway materials, permissions delays, idle labour/machinery and business loss.
No motorable approaches to most sites, limited stacking space, work near railway operations/track linking, and need to coordinate with other agencies.
Combined Bid Security, 5% PG, 5% SD (with 6% bill recovery) and possible additional PG for below-rate bids create significant cash/BG exposure.
Failure to deploy prescribed engineers attracts Rs.40,000 per month; exaggerated/false measurements ≥5% of claimed gross bill trigger LD/actions.
For this >Rs.50 lakh contract, variation making present contractor more than 5% costlier than a new L-1 on revised quantities can vitiate the contract and lead to fresh tendering or renegotiation of extra quantities.
Mandatory document set is extensive; missing constitution/POA/Annexure-V/bid capacity/BG original etc. leads to summary rejection with no post-tender cure.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Dy. Chief Engineer (Construction), Solapur, Central Railway acts for the President of India.
Dy Chief Engineer (C) Solapur office at DRM Office Compound, Railway lines, Modi Khana, Solapur-413001; Field Unit mobile 7219613266.
Tender notice, documents and any corrigenda are on www.ireps.gov.in; submission only on that portal.