Tender issue / publication
Tender forwarding letter and IAFW-2159 cover are dated 27 Jul 2026.
Loading…
PROVISION OF DG SETS AND ELECTRICAL ACCESSORIES FOR DATA CENTRE FACILITY AT CABS BANGALORE
Military Engineer Services · Bangalore, Karnataka2026_MES_765544_2
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
27 Jul 2026
17 Aug 2026
₹4.4 Cr
₹5.2 L
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Tender forwarding letter and IAFW-2159 cover are dated 27 Jul 2026.
Appendix 'A' does not print absolute bid submission start/end or opening dates; it only says “Refer critical dates”. Bids are received online up to the NIT date/time; Cover-1 & Cover-2 upload on the e-portal; no physical bid is accepted.
Bidders may forward consolidated points on tender documents/drawings or depute a technical representative on or before Bid Submission Start Date (not after).
Offer remains open for acceptance for 90 (ninety) days from the Bid Submission End date (excluding the bid submission date).
Site handing over is on or about two weeks after acceptance. Completion period is stated as 300 days in Appendix 'A' but 270 days in Schedule 'A' notes (see contradictions).
Original DD/EMD instruments must reach Accepting Officer within 5 days of bid submission end date. Original signed Integrity Pact must reach by post with DD before Cover-1 opening date.
Performance Security within 28 days of LOA; CPM/time schedule within two weeks of site handover; defects liability 24 months from certified completion.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Estimated cost ₹443.24 Lakh (At Par Market).
₹2,000.00 as DD/Bankers cheque from any scheduled bank in favour of Garrison Engineer (I) R&D (East) Bangalore - 560093, payable at Bangalore. Scanned copy in Cover-1; physical original to Accepting Officer within 5 days of bid submission end date.
EMD ₹5,18,500.00 in favour of Garrison Engineer (I) R&D (East) Bangalore, payable at Bangalore. Required where Standing Security Bond is not executed. Acceptable forms: Deposit at Call Receipt from a Scheduled Bank, or receipted Treasury Challan credited to GE(I) R&D (East) Bangalore revenue deposit. Cheque/BG not accepted. Optional EMD exemption if bidder signs bid security declaration per Appendix 'B' (form referenced but not printed in pack—see risks/queries).
5% of contract amount within 28 days of LOA, in any one form: Bank Guarantee (prescribed form), Government Securities/FDR/other Government instruments stipulated by Accepting Officer, or Insurance surety bond. Mix of forms not allowed. Work Order No.1 only after adequate PS. BG from Nationalized/Scheduled Indian Bank; confirmation from Head Office. Failure: award cancellation and amount equal to EMD via MRO; tender issue suspension.
Quoted unit rates are deemed inclusive of GST, labour welfare cess and other levies prevailing on tender submission/last due date. Variation reimbursement/refund applies only to “taxes directly related to contract value” (e.g. GST, labour welfare cess) percentage-rate changes after last due date; Income Tax excluded.
Running Account Receipts (RARs) apply. For contracts above ₹50 lakh, advance on account to full value of specified materials brought to site is allowed on furnishing schedule-bank guarantee bond(s) for the retention money otherwise recoverable. Eligible materials include reinforcement/structural steel, sanitary fittings, UPVC windows, tiles, GI tubing, cables/MCBs/DBs/light fittings/panel boards/fans/LT UG cable, and other materials decided by GE/AGE(I).
Water from MES recoverable at ₹3.75 per ₹1,000 of work done if bought from MES. Schedule of Credit for salvaged materials is deducted via General Summary (e.g. old tiles, wiring, ceiling boards).
Security deposit for anti-termite treatment: 2.5% of ATT amount at contract rates, minimum ₹10,000, retained by Government (ATT defects liability 10 years).
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Must be MES enlisted in Class 'A' and category 'b(i) & b(ii)', with satisfactory performance remarks on works in hand per WLR/other competent-authority report.
Must meet Class 'A' & category 'b(i) & b(ii)' enlistment criteria for similar works with Central/State Govt/PSUs/AWHO/AFNHB/CGEWHO/DGMAP, annual turnover, bank solvency, working capital and other requirements in Para 1.4 & 1.5 of Section 1 of MES Manual of Contracts-2020 (thresholds not restated in tender). No adverse WLR remarks if already working in MES. Not suspended/debarred/blacklisted as on bid submission end date. If already executing MES works totaling more than twice the tendering limit of the eligible class, ineligible. After securing two MES works must get registered in appropriate class or become ineligible for further participation.
If after Cover-1 opening eligible Class A MES + eligible unenlisted bidders are fewer than 7, one class below (two classes below in remote/difficult areas) may be considered, subject to residual work not exceeding five times tendering limit—unless they meet upgradation criteria. If 7+ eligible Class A MES contractors, one-class-below only if they meet upgradation criteria and tendered work value is less than twice their tendering limit.
Foreign firms not eligible. Indian firms with foreign national / Indian nationals staying abroad / Indian nationals with foreign citizenship as Director(s) considered only subject to security clearance. Contractor shall employ Indian Nationals after verifying antecedents and loyalty.
Not more than one tender by one contractor/firm. Father and son(s) or other close relations with business dealings cannot bid as separate competitors. Related firms (common proprietor/partner/director) cannot participate simultaneously.
MES contractors whose enlistment not renewed for cyclic period ending 31 Dec 2025 with appeal pending at E-in-C may bid as unenlisted (meeting unenlisted criteria) but without EMD, with affidavit that appeal is pending.
For electrical works requiring licence under CEA regulations, contractor must hold valid State/UT electrical licence in firm name or execute via MOU/agency with valid licence; supervisor competency certificate and workmen permits required. For 33 kV works, valid electrical licence or approved agency with licence before commencement.
Work cannot be executed by subletting or POA to a third party/another firm; limited POA only to sons/daughters/spouse of proprietor/partner/director or firm's own employees/director/project manager, provided they do not have a separate MES-enlisted firm.
Appendix 'A' states Technical PQC criteria as NA (not applicable) beyond the enlistment/class criteria above.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Lump-sum MES works contract: Provision of DG sets and electrical accessories for Data Centre facility at CABS Bangalore (CA No. CERD/BAN/TOKEN/05 OF 2026-2027). Buildings/services as shown on site plan; executing agency GE(I) R&D (East) Bangalore.
Based on IAFW-2159 (lump sum) and IAFW-2249 GCC, drawings and specifications. Schedule 'A' Parts I–X: buildings/structures; B/R for data centre; 2 cover sheds; excavation/earthwork; internal electrification; internal water supply; road/path/culvert/hardstanding; sewage disposal; external electrification; and market-rate BoQ Part X. Parts II–IX largely percentage-above/below prepriced MES amounts; Parts I & X contractor-quoted rates.
MES-inserted prepriced lump sums carried to BoQ: Part II ₹16,19,282.95; Part III ₹20,87,349.10; Part IV ₹42,173.13; Part V ₹10,65,969.00; Part VI ₹33,783.45; Part VII ₹5,00,073.51; Part VIII ₹1,18,847.22; Part IX ₹9,47,499.00. Bidder quotes % above/below each.
Market-rate Part X (items ~10–71) includes among others: 4 Nos 160 kVA/128 kW silent DG sets (CPCB IV+ or better, 415 V, 1500 RPM, 0.8 pf, 0.85 LF) with foundation, testing/commissioning and first-fill oils/diesel; 4 Nos 80 kVA modular online UPS (N+1, 30 min VRLA battery backup); 1 No 400 kVA 11/0.433 kV outdoor KNAN copper-wound transformer; 1 No 200 kVAR APFC panel; 2 Nos ATS-cum-UPS LT panels; 2 Nos multi-source TTA LT panels (grid + DG-1/2 + standby) with PLC auto changeover; associated cables, earthing, panels and accessories.
Part I: Construction of 2 Nos Operator cum storage room with attached toilet, complete with fittings/fixtures as drawings. Also B/R works for data centre facility, 2 cover sheds, roads/paths/hardstanding, sewage, water supply, excavation, internal electrification and finishes per drawings/particular specifications (including ATT and waterproofing deemed in Part I LS as applicable).
Entire work within 270 days from site handover per Schedule 'A' (Appendix 'A' states 300 days—conflict). Defects liability period 24 months from certified completion. Site handover about two weeks after acceptance.
Works to MES Schedule of Rates, drawings (architectural/structural/services sheets supplied), Particular Specifications, Special Conditions and IS/CPWD references cited in BoQ (e.g. CPCB IV+ for DG, CPWD specs, IS for electrical tests). GCC IAFW-2249 and DSR/SSR available for perusal at GE(I)/CE office (not enclosed).
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Single-stage two-cover e-tender on defproc/eprocuremes. Cover-1 (Technical/'T' bid) and Cover-2 (Financial/'Q' bid via BoQ Excel only). No physical tender bid accepted. Quote only in BoQ file; no format alteration.
Bid uploaded using DSC of authorised person. Cover-1 must include scanned POA in favour of DSC holder (or sole-proprietor affidavit / partnership/company constitutional authority docs). Fresh POA specifically covering arbitration clause required even if routine POA exists. Every page of tender to be initialled; drawings signed after acceptance.
Original DD (tender cost) and EMD instruments (as applicable) to office of Accepting Officer (Chief Engineer R&D, Opp. Jubilee Bus Station, Picket, Secunderabad-500 003) within 5 days of bid submission end date. Original Integrity Pact (each page signed) by post with DD before Cover-1 opening. Hard copies of POA/authority documents well in advance of fixed date/time.
After Cover-1 opening, deficiencies may be notified by e-mail/SMS/Speed Post; 7 days to rectify or Cover-2 not opened.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
No corrigendum/addendum files are present among the downloaded tender documents, and no amendment history is printed in the NIT/tender PDFs. Values in the base documents therefore apply as written (subject to internal contradictions noted separately).
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
Appendix 'A' item 3 states period of completion 300 days, while Schedule 'A' Note 1 states entire work within 270 days from site handover. Both are in the same tender PDF without corrigendum. Bidder should seek written clarification; Schedule 'A'/contract notes are the execution clause while App 'A' is NIT summary—do not assume either silently.
Instructions para 5.5: PS Bank Guarantee validity up to and including scheduled expiry of Defects Liability Period. Special Conditions para 15.1: validity of Bond/FDR up to and including scheduled DLP expiry plus minimum 60 days.
Forwarding letter header shows Tele: 040-27890087; Appendix 'A' item 9 shows Phone No. 040 29557665. Same office/email otherwise ([email protected]).
NIT appeal clause lists NHEA fax 044-25360028 & 25360029, while Appendix 'A' Note 10 lists fax 044-29814385 for the same NHEA email [email protected].
Instructions allow EMD exemption by signing bid security declaration in Appendix 'B', but the Notice-of-Tender Appendix 'B' declaration form is not printed in the supplied pages (pages after App 'A' jump to Integrity Pact). Bidders cannot safely rely on exemption without the form/clarification.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask Accepting Officer to confirm whether contractual completion is 270 days (Schedule 'A') or 300 days (Appendix 'A'), and whether any phase-wise intermediate milestones apply.
Clarify whether PS BG/FDR must run to DLP expiry only or DLP + 60 days, and the claim period required by Accepting Officer/PCDA.
Request the missing Appendix 'B' bid-security declaration proforma, or written confirmation that EMD ₹5,18,500 physical instrument is mandatory for non-SSD bidders with no declaration option.
Request the exact MES Manual 2020 Para 1.4/1.5 numerical criteria (similar-work values, average annual turnover, solvency, working capital) that will be applied for this Class A / b(i)&b(ii) tender, and what counts as 'similar nature' for DG/electrical data-centre works.
Seek approved makes/OEMs for 160 kVA CPCB IV+ silent DG sets, factory inspection/witness requirements, fuel for testing responsibility beyond first fill, and whether all 4 sets run in parallel/N+1 with the specified multi-source LT/PLC scheme.
Confirm CABS/DRDO site access lead times for men/materials/cranes, normal working hours, Sunday/holiday work permissions, police verification requirements for workmen, and any ban on photography/digital records constraints affecting commissioning documentation.
If not already taken from the live defproc critical-date table, confirm bid submission start, bid submission end (and whether 18:00 hrs applies), and Cover-1/Cover-2 opening dates/times in writing.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
270 vs 300 day conflict can shift LD/compensation-for-delay exposure. Detailed LD formula sits in IAFW-2249 (not enclosed). Conciliation expressly covers disputes on levy of compensation for delay.
Entire work in restricted area; Official Secrets Act binds contractor; fire precautions; identity of workmen; likely access delays for heavy DG/transformer installation can compress an already tight programme.
5% PS for full contract, BG validity at least through 24-month DLP (possibly +60 days), forfeitable on cancellation under Conditions 52–54. Separate ATT retention 2.5% for 10 years on ATT component.
Missing scanned/physical tender fee or EMD can kill Cover-2 or trigger 6-month ban. L1 revocation/upward revision after Cover-2 attracts EMD-equivalent penalty and retender; related firms barred from subsequent calls. IP non-upload = automatic rejection.
Cannot sublet or POA the work to another firm—critical for multi-discipline DG, HT/LT, UPS, civil package at a restricted DRDO site.
Rates inclusive of GST/cess on bid-due-date basis; only percentage-linked contract-value taxes get reimbursement/refund with strict documentary proof—mis-estimation of tax is bidder risk. Unquoted BoQ items become Nil.
Even enlisted Class A bidders have no guarantee of T-bid validation/finance-bid opening; appeal to NHEA only before finance-bid opening, no compensation for rejection.
Joint CPM required; GE reviews can revise schedule without automatic EOT; multi-shift/incentive methods to meet schedule attract no extra payment.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Chief Engineer R&D Secunderabad (Accepting Officer). Address: Opp. Jubilee Bus Station, Picket, Secunderabad-500 003. Email: [email protected]. Phones printed: 040-27890087 (forwarding letter) and 040 29557665 (Appendix 'A'). Physical DD/EMD/IP/authority hard copies go to this office.
Garrison Engineer (I) R&D (East) Bangalore — executing agency; prior appointment for site visit; EMD instruments drawn in this GE's favour; drawings/samples also inspectable at GE office.
HQ Addl Director General (Projects), C/o Chief Engineer Chennai Zone, Island Grounds, Chennai-600 009 (TN). Email: [email protected]. Fax numbers printed inconsistently: 044-25360028 & 25360029 vs 044-29814385. Appeal before scheduled finance-bid opening, copy to Accepting Officer.
IEMs: (a) Shri Narayan Murthy Ganapathy, IFoS (Retd) — [email protected]; (b) Shri Lalatendu Mohanti, IPS (Retd) — [email protected]. Nodal Officer: Shri Ashish Kumar Garg, Director (Contracts), Room No 158, Dte of Contract Management, E-in-C’s Branch, Kashmir House, Rajaji Marg, New Delhi-110011; email [email protected]; Mob 9131948501; Tele 011-23019154.
Quote reference 2026_MES_ _2 and mark CA No. CERD/BAN/TOKEN/05 OF 2026-2027 when corresponding with Chief Engineer R&D Secunderabad.