Publication / invitation
RFP/NIT invited on 30.07.2026; tender uploaded on IREPS on 30/07/2026 19:09.
- Bid documents available on https://ireps.gov.in from 30.07.2026.
- NIT Run Date/Time stamp: 30/07/2026 19:10:12.
Loading…
Construction of New BG Double Line from Balodabazar (Km 110.500) to Parmalkasa (Km 280.840) and Y-connectivities from Lakholi station and Marauda Y Cabin including earthwork, Bridges, Rail over Rail (ROR) Bridge , Road over Bridge (ROB), Road under Bridge (RUB), station buildings, track works, Electrification, Signaling &Telecommunication works, and allied miscellaneous works in connection with Kharsia- Naya Raipur-Parmalkasa 5th & 6th Line Project under South East Central Railway in the State of Chhattisgarh.
South East Central Railway · ChhattisgarhCAO-C-BSP-26-27-13
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
30 Jul 2026
30 Oct 2026
₹3966.2 Cr
₹79.3 Cr
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
RFP/NIT invited on 30.07.2026; tender uploaded on IREPS on 30/07/2026 19:09.
Last date for queries 25.08.2026 upto 10:30 Hrs; 1st Pre-Bid 25.08.2026; Authority response by 10.09.2026; 2nd Pre-Bid 23.09.2026; further response by 15.10.2026.
RFP Bid Due Date is 29.10.2026 up to 15:00 Hrs IST on https://ireps.gov.in; NIT Closing Date/Time is 30/10/2026 15:00 (conflict — see contradictions).
Physical submission of documents listed in RFP Clause 2.11.2 due on or before 05.11.2026 up to 18:00 Hrs IST at CPM/South/Con/BSP, Nirman Bhawan, Bilaspur.
Technical Bids open online on 06.11.2026 after 15:30 Hrs IST at the address in Clause 2.11.4(i); Financial Bid opening intimated later to technically responsive bidders.
Bid validity 180 days from Bid Due Date; LOA duplicate return within 7 days of LOA; Performance Security within 30 days of LOA; Agreement signing stated as within 30 days of receipt of Performance Security in RFP schedule (see also EPC 60-day LOA timeline under contradictions).
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Estimated Project Cost / Advertised Value is Rs. 39,66,20,39,906.07 (Rs. 3966.20 crore).
Bid Security Rs. 79,32,40,800/-; refundable not later than 200 days from Bid Due Date (except Selected Bidder).
Performance Security 5% of Bid/Contract Price within 30 days of LOA; Additional PS if bid is more than 5% below advertised cost; separate Retention Money 5% of Contract Price also within 30 days of LOA.
Contract Price = accepted lumpsum under Schedule G plus actual execution under Schedule G-1; interim stage payments per Schedule-G; optional mobilisation/equipment Advance up to 10% with interest.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Single entity or Consortium/JV up to 4 members; Lead Member minimum 51% shareholding; joint and several liability till DLP; Lead Member must self-execute ≥30% of project value.
Over last 5 previous FYs + current FY up to Base Month: (i) payments/PPP self-execution > 2.5× Estimated Project Cost (Threshold Technical Capacity), with ≥1/4 from Category 1 and/or 3; and (ii) one Completed/Substantially completed Railway Sector Eligible Project ≥50% of Estimated Project Cost.
Either one similar work ≥20% of Estimated Project Cost, or two similar works each ≥10% (Amendment No. 2; 13.03.26).
Minimum Net Worth Rs. 198.31 crore at close of preceding Financial Year; pending litigation dispute amount must not exceed 50% of Net Worth.
Bidder must not be blacklisted/debarred by Railways or any GoI Ministry/Department on bid submission date; land-border country restrictions apply; false credentials lead to rejection/forfeiture/banning up to two years.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
EPC construction of new BG double line (5th & 6th line) from Balodabazar (Km 110.500) to Parmalkasa (Km 280.840) with Y-connectivities, in Chhattisgarh under SECR; stated length 170.34 km.
Full EPC survey, design, engineering, procurement, construction, testing and commissioning of civil, permanent way, 2×25 kV OHE/general electrical, and S&T works with project facilities, to Specifications in Schedule-D.
Scheduled Completion Date is the 1275th day from the Appointed Date (~3.5 years); financial Project Milestones at Days 365/730/913/1095/1275 with 10%/30%/50%/80%/100% stage-payment thresholds, plus extensive physical milestones with daily damages.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Single-stage two-packet e-tender on https://ireps.gov.in only; Technical Bid documents uploaded online and Financial Bid (Appendix-IB) quoted online; no fax/telex/telegram/e-mail bids.
Physical envelope of originals under Cl.2.11.2 must be sealed, marked “Bid for the ***** Project”, show bidder name/address and Bid Due Date on top-right, and be addressed to CPM/South/Con/BSP.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The workspace contains no issued corrigendum/addendum files amending this tender’s dates, amounts or conditions; tender-metadata also lists an empty corrigenda array.
As issued: Bid Due Date per RFP 29.10.2026 15:00 (NIT shows 30/10/2026 15:00 — unresolved conflict); physical docs 05.11.2026 18:00; technical opening 06.11.2026 after 15:30; Bid Security Rs. 79,32,40,800; EPC Rs. 3966.20 Cr; completion 1275 days; bid validity 180 days.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
RFP Cl.1.3/2.12 set Bid Due Date 29.10.2026 15:00 IST, while NIT header/closing fields state 30/10/2026 15:00. No corrigendum reconciles them.
Cl.2.20.6 requires original Bid Security instrument before the bid closing date excluding the last submission day, while Cl.1.3/2.11.2/2.12 allow physical submission of Bid Security BG and other originals by 05.11.2026 18:00.
RFP Schedule Cl.1.3 says sign Agreement within 30 days of receipt of Performance Security; draft EPC Recital and RFP Bid-Security forfeiture clause refer to executing/signing Agreement within 60 days of LOA.
NIT header lists Pre-Bid times as 11:00, while NIT General Instructions state both meetings start at 11:30 A.M.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask Authority to confirm whether IREPS closing is 29.10.2026 or 30/10/2026 15:00, and whether original Bid Security must arrive before online closing (Cl.2.20.6) or by 05.11.2026 with other physicals.
Seek confirmation that separate completed works may be combined component-wise at the 20%/10% thresholds using the Rs 2189.01/531.78/338.72/563.69 Cr component values, and how Lead vs other members must cover civil/track vs S&T/OHE.
Confirm that both 5% PS (to 6 months beyond DLP, with +2 year DLP extensions for bridges/PSC/new tech) and separate 5% Retention Money are simultaneously required, and whether Bid Security can be adjusted into PS.
Request filled Annex-II land handover tables (95%/5% core and non-core lengths, chainages) and status of land acquisition/encumbrances, since current text largely points to a generic ‘Annexure Land’ and D+60 full RoW promise.
Ask for quantities, sections, delivery locations/schedule of free-issue Panel/SH rails and confirmation that all joint welding (MFBW) and phased-array USFD remain fully contractor risk/cost.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Bid Security alone is Rs. 79.32 crore; post-award 5% PS + 5% Retention Money (~10% of Contract Price) plus possible Additional PS if bid <95% of advertised value, with long PS tenor through extended DLP.
Milestone/SCD delay damages @ 0.05% of Contract Price per day after 30-day grace, capped at 10% Contract Price; many physical/planning milestones carry separate fixed Rs/day damages from D+20/D+30 onward.
Need simultaneous Threshold Technical Capacity >2.5×EPC, 50% railway project, and multi-component similar work; Lead must cover formation/bridges/track similar work and self-perform ≥30%.
Contractor bears access-road/local-liaison risk; works beside/over running lines and NI periods; Authority free-issue rails can gate track progress; CRS sanctions required for specified works near running track.
Base DLP 2 years/18 months plus mandatory +2 years for bridges, PSC sleepers and new-tech interlocking/telecom; failure to arrange OEM AMCs allows Authority rectification at contractor cost +20% damages or DLP extension.
Optional 10% advance costs Bank Rate+4% interest and is recovered aggressively from 50% progress at 30% of each IPC; no release above 90% Contract Price until fully repaid.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
CPM/South/Con/BSP, South East Central Railway — Mr. Ashish Mishra; Nirman Bhawan, Office of CAO (Construction), S.E.C. Railway, Bilaspur, Chhattisgarh-495004; Phone 9752440211; e-mail [email protected].
Both Pre-Bid meetings at Chamber of CPM/South/Con/BSP, Nirman Bhavan, SECR, Bilaspur; hybrid Google Meet link provided in NIT (https://meet.google.com/ocy-thcn-ue).