Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
7,946 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
7,946 results • Latest
DISTRICT MAGISTRATE DARJEELING
Instalation and Pumping System with Solar PV of Ground water lifting theoogy Tubewell for drinking water near Dinuwa Malpaharia House at Dipa Line Naxalbari TE Division Sansad under Naxalbari Gram Panchayat. AAP No-01/SFC-PBG/2020-21,
Northern Coalfields Limited
Mahanadi Coalfields Limited
Bharat Coking Coal Limited
Eastern Coalfields Limited
UP Power Transmission Corp.Ltd (Operation)
UP Power Transmission Corp.Ltd (Operation)
UP Power Transmission Corp.Ltd (Operation)
Uttar Pradesh Rajya Nirman Sahkari Sangh Limited
EXAM HALL WORK AC,ALUMINIUM PARTITIONS, WINDOW JALI ETC. AT CSJMU KANPUR U.P
Thane Municipal Corporation Thane
Thane Municipal Corporation Thane
Thane Municipal Corporation Thane
The Kisan Sahkari Chini Mills Ltd. Anoopshahar Bulandshahar
Thane Municipal Corporation Thane
RDD-CEO-DHULE
RDD-CEO-DHULE
RDD-CEO-YAVATMAL
RDD-CEO-YAVATMAL
RDD-CEO-YAVATMAL
RDD-CEO-NASHIK
Providing And Erecting Trolley Mounted suction machine. For Grampanchayat Dabhadi Tal.Malegaon Dist.Nashik
MUNICIPAL AFFAIRS DEPARTMENT
MUNICIPAL AFFAIRS DEPARTMENT
Madhyanchal Vidyut Vitran Nigam Ltd
Madhyanchal Vidyut Vitran Nigam Ltd
PUBLIC WORKS DEPARTMENT
SantipurGuptiparaGhatRoadfrom0kmto2_29kmrepairingworkinstretchesofRanaghatHighwaySubDivisionunderNadiaHighwayDivisionNoIIofPWRoadsDirectorateintheDistrictofNadiaduringtheyear2021_22
PUBLIC WORKS DEPARTMENT
ConstructionofNewHumePipeCulvertbyreplacingdamagedculvertat4thKmofBadkullaAranghataRoadofRanaghatHighwaySubDivisionunderNadiaHighwayDivisionNoIIPWRoadsDirectorateintheDistrictofNadiaduringtheyear2021_22
PHE
Installation of 08 (Eight) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 190 mt.) along with stand post at different Sourceless AWC under Patashpur-I Block of Tamluk Division, PHE Dte.
PHE
Installation of 08 (Eight) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 240 mt.) along with stand post at different Sourceless AWC under Patashpur-II Block of Tamluk Division, PHE Dte.
PHE
Installation of 07 (Seven) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 230 mt.) along with stand post at different Sourceless AWC under Contai-II Block of Tamluk Division, PHE Dte.
PHE
Installation of 02 (Two) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 225 mt.) along with stand post at different Sourceless AWC under Bhagwanpur-I Block of Tamluk Division, PHE Dte.
PHE
Installation of 08 (Eight) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 230 mt.) along with stand post at different Sourceless AWC under Contai-II Block of Tamluk Division, PHE Dte.
PHE
Installation of 08 (Eight) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 225 mt.) along with stand post at different Sourceless AWC under Bhagwanpur-I Block of Tamluk Division, PHE Dte.
PHE
Installation of 08 (Eight) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 235 mt.) along with stand post at different Sourceless AWC under Ramnagar-I Block of Tamluk Division, PHE Dte.
PHE
Installation of 04 (Four) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 240 mt.) along with stand post at different Sourceless AWC under Patashpur-II Block of Tamluk Division, PHE Dte.
PHE
Installation of 02 (Two) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 190 mt.) along with stand post at different Sourceless AWC under Egra-I Block of Tamluk Division, PHE Dte.
PHE
Installation of 04 (Four) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 210 mt.) along with stand post at different Sourceless AWC under Egra-II Block of Tamluk Division, PHE Dte.
PHE
Installation of 08 (Eight) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 190 mt.) along with stand post at different Sourceless AWC under Egra-I Block of Tamluk Division, PHE Dte.
PHE
Installation of 08 (Eight) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 220 mt.) along with stand post at different Sourceless AWC under Ramnagar-II Block of Tamluk Division, PHE Dte.
PHE
Installation of 08 (Eight) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 210 mt.) along with stand post at different Sourceless AWC under Egra-II Block of Tamluk Division, PHE Dte.
PHE
Construction of temporary special latrine at different places of Lot-8 Point in connection with GS Mela-2022 under Diamond Harbour Sub-Division, of Alipore Division PHE Dte. (Part-II)
PHE
Installation of 03 (Three) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 235 mt.) along with stand post at different Sourceless AWC under Ramnagar-I Block of Tamluk Division, PHE Dte.
The Kisan Sahkari Chini Mills Ltd. Anoopshahar Bulandshahar
The Kisan Sahkari Chini Mills Ltd. Anoopshahar Bulandshahar
PHE
Construction of temporary special latrine at different places of Namkhana Point including maintenance of latrine in connection with GS Mela-2022 under Diamond Harbour Sub-Division, of Alipore Division PHE Dte. (Part-I)
Zilla Parishad
Installation of 100X40 mm dia 200 mtr. deep tube well with PVC pipes and strainer with Indian Mark II pump including high rise platform and soak well
PHE
Construction of temporary water supply arrangement and allied works at different places of Lot-8 Point in connection with Ganga Sagar Mela-2022 under Diamond Harbour Sub-Division of Alipore Division P.H.E. Dte.
PHE
Construction of temporary special latrine at different places of Lot-8 Point including maintenance of latrine in connection with GS Mela-2022 under Diamond Harbour Sub-Division, of Alipore Division PHE Dte. (Part-X)
PHE
Construction of temporary special latrine at different places of Lot-8 Point including maintenance of latrine in connection with GS Mela-2022 under Diamond Harbour Sub-Division, of Alipore Division PHE Dte. (Part-IX)
PHE
Construction of temporary special latrine at different places of Namkhana Point including maintenance of latrine in connection with GS Mela-2022 under Diamond Harbour Sub-Division, of Alipore Division PHE Dte. (Part-IV)
PHE
Sinking of 03 (three) no.100mm x 50mm dia. having 5 nos. Strainer upto 300 mtr (Average) depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different places of Lot-8 Point i.c.w. Ganga Sagar Mela 2022.
Across all 7,946 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.