Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
11,267 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
11,267 results • Latest
KOLKATA POLICE
Supply of 100 pieces double decker Iron Cot for the use of Recruit Constables (lady) for the financial Year 2023-24.
PHE
Additional Laying of HDPE pipeline and interconnection work in distibution system of Digsui Heora Zone-I and Zone-II Water Supply Scheme for providing left over FHTC under Chinsurah Sub- Division, Under Hooghly Division, PHE Dte.
GORKHALAND TERRITORIAL ADMINISTRATION
Reservoir Tank at 8TH mile community hall
GORKHALAND TERRITORIAL ADMINISTRATION
Zilla Parishad
Zilla Parishad
DISTRICT MAGISTRATE KALIMPONG
DRINKING WATER SCHEME AT CHANGSING ICDS UNDER PARAYE SAMADHAN WITHIN LINGSEKHA GP
Zilla Parishad
WATER ATM VENDING MACHINE NEAR GP SWAM PROJECT AT NIMTALA BHOLSARA AT SANSAD 05
PHE
Providing Functional Household Tap Connection (FHTC) within left out habitation of various Mouzas in Borhal (Zone-II) W/S Scheme under Serampore Sub-Division of Hooghly Division, P.H.E. Dte.
KOLKATA MUNICIPAL CORPORATION
COLLECTION OF SPILAGE BITUMEN INCLUDING CLEANING AND RE-FEEDING WITH ALLIED WORK AT ASPHALTUM PALMER BAZAR DEPTT., UNDER ROADS(M)DEPARTMENT.
PHE
Balance LDS and other allied works within left out habitation of various Mouzas in Borhal (Zone-II) W/S Scheme under Serampore Sub-Division of Hooghly Division, P.H.E. Dte.
PHE
Engagement of Lab Personnel_1 Chemist, 1 Bacteriologist, 1 Lab Assistant and One Sampling Assistant for regular analysis, testing and monitoring of water samples and others allied minor mtc. works of 10 Nos. WTL under Midnapore Division, PHE Dte.
PANCHAYAT AND RURAL DEVELOPMENT
Construction of road from Malaypur Hatider Pukur ke to Chandpara More under Arambagh block
KOLKATA MUNICIPAL CORPORATION
CONSTRUCTION OF SHED FOR B.O.H.D AT 99 NO WARD OFFICE BUILDING PREMISES, BESIDE VIVEKANANDA PARK, UNDER BOROUGH- X.
WB HIDCO LTD
Comprehensive Annual maintenance AMC of Wilo Auto Sensor Pressure Pump in Eco-Island in New Town Kolkata. 12 months
PUBLIC WORKS DEPARTMENT
Part A Installation of 8 mtr. Solar Semi High Mast light with DC LED Flood Light system having integrated 30w 4 having outeput lumen ......................
PUBLIC WORKS DEPARTMENT
Part A Instalation of 9 mtr. Solar Octagonal Mini Mast with DC LED Flood Light system having non intregrated, 45w 4 having output lumen 140-150 lumen watt, 6300-6800lumen minimum LM 79 report from NABL, and Design reports, brands TDS an OEM S to b
PUBLIC WORKS DEPARTMENT
Installation of 9 mtr. Solar Octagonal Mini Mast with DC LED Flood Light system having non intregrated, 45w 4 having output lumen 140 150 lumen watt, 6300-6800lumen minimum LM 79 report from NABL, Design reports, brands TDS OEM to be provide
PUBLIC WORKS DEPARTMENT
Installation of 8 mtr Solar Semi High Mast light with DC LED Flood Light system having integrated 30w 4 having output lumen 4500 LM 4 18000LM brands TDS OEMS to be provided with lifepo4 battery 12.8v 30 Ah 4 nos,400 wp panel at different
PUBLIC WORKS DEPARTMENT
Installation of 8 mtr. Solar Semi High Mast light with DC LED Flood Light system having integrated 30w x4 having output lumen 4500 LMx 4 18000LM ( brand TDS OEM to be provided) with lifepo4 battery 12.8v 30 Ah 4 nos,400 wp panel at different
KOLKATA MUNICIPAL CORPORATION
Replacement of brackets of thermodrum roller and repairing of hoppers with allied works of DM-50 plant at Asphaltum Deptt., Palmer Bazar.
THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD.
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
GORKHALAND TERRITORIAL ADMINISTRATION
R.G. KAR MEDICAL COLLEGE AND HOSPITAL
GORKHALAND TERRITORIAL ADMINISTRATION
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
PUBLIC WORKS DEPARTMENT
Kolkata Medical College and Hospital --- Kolkata Medical College and Hospital --- Fixing of Fire Sprinkler Heads with Flexible Pipes along with necessary Minor Modification of Fire Sprinkler Lines at Different floors of SSB
Zilla Parishad
Zilla Parishad
PHE
Renovation of Iron Elimination Plant at Shankarpur W/S Scheme at Basirhat- I Block under Basirhat Sub division, PHE Dte.. Capacity- 93.0625 m3/hr
PHE
Renovation of Arsenic cum Iron Removal Plant at Bithari zone - I W/S Scheme including increasing the height of back wash water tank at Swarupnagar Block under Basirhat Sub Division, PHE Dte. Capacity- 153.00 Cum/hr.
PHE
Renovation of Arsenic cum Iron Removal Plant at Nalkora W/S Scheme including increasing the height of back wash tank at Basirhat - I Block under Basirhat Sub Division, PHE Dte. Capacity - 10.81 Cum/hr
PHE
Renovation of Arsenic cum Iron Removal Plant at Parui W/S Scheme including increasing the height of back wash tank at Swarupnagar Block under Basirhat Sub Division, PHE Dte. capacity - 160.00 cum/hr
PHE
Renovation of Arsenic cum Iron Removal Plant at Sonepur W/S Scheme including increasing the height of back wash water tank at Swarupnagara Block under Basirhat Sub Division, PHE Dte. Capacity-10.00Cum/hr.
PHE
Renovation of Arsenic cum Iron Removal Plant at Bazitpur zone - I W/S Scheme including increasing the height of back wash water tank at Baduria Block under Basirhat Sub Division, PHE Dte. Capacity- 91.50 Cum/hr.
PHE
Renovation of Arsenic cum Iron Removal Plant at Goknasree Gobindapur W/S Scheme including increasing the height of back wash tank at Basirhat - I Block under Basirhat Sub Division, PHE Dte. Capacity- 60.00 Cum/hr
PHE
Renovation of Arsenic cum Iron Removal Plant at Sadiknagar zone - II W/S Scheme at Basirhat - II Block under Basirhat Sub Division, PHE Dte. Capacity - 56.25 Cum/hr
Across all 11,267 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.