Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
11,539 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
11,539 results • Latest
EIC-CIVIL
RDD-CEO-JALGAON
RDD-CEO-RAIGAD
RDD-CEO-RAIGAD
RDD-CEO-WASHIM
RDD-CEO-WASHIM
RDD-CEO-RAIGAD
RDD-CEO-RAIGAD
RDD-CEO-SOLAPUR
RDD-CEO-RAIGAD
MUNICIPAL AFFAIRS DEPARTMENT
Permanent Road restoration Including Bitumen and Concrete Road of Distribution Network (HDPE, DI K-7) for Length 9077 metre at ZONE-9 in Ward-8, Ward-19 and for Length 3409 metre at ZONE-10 in Ward-13, Ward-14
WBSIDCL
Supply of Hospital Furniture and Equipment
Zilla Parishad
CONSTRUCTIO N OF NIKASHI COVER DRAIN FROM SIKERPUT MILAN KR MAJHI POND TO GAMARTALIYA NIRMALENDU PATRA UNDER GAMARTALIYA SANSAD JL NO 297 PLOT 5 673.Activity Code-90342421 of 15th FC
Zilla Parishad
CONSTRUCTIO N OF NIKASHI COVER DRAIN NEAR SAMESWAR MAITY POND UNDER KK BAR. Activity Code-90337891 of 15th FC
Rural Development and Panchayat Raj Department
Rural Development and Panchayat Raj Department
Haryana Government
Haryana Board Corporation
Supply of Gratings
Haryana Board Corporation
Haryana Board Corporation
Providing balance 200 KVA Transformer in Shopping Centre in Sector 20 P-II at Sirsa. Including 6 years defect liability period for transformers and 3 years mtc. and defect liability period for all other items free of cost.
Haryana Board Corporation
OVERHAULING OF PA, FD AND ID FANS AND FLUE GAS DUCTING OF BOILER OF 250MW, UNIT-8, PTPS, PANIPAT
Haryana Board Corporation
Overhauling of ESP of Boiler of 250 MW, Unit-8, PTPS, Panipat
Haryana Board Corporation
Haryana Board Corporation
SERVICES REQUIRED FOR CONDUCTING DIRTY AIR FLOW TEST BEFORE OVERHAULING AND CLEAN AIR FLOW TEST AFTER OVERHAULING OF 250 MW, UNIT-8, PTPS, PANIPAT
Zilla Parishad
Zilla Parishad
Construction of Leatch pit 1.2 mt inner dia and 1.40 mt inner depth (1000 lt) with gully pit (silt chamber) inner dimention 0.6 mt x 0.6mt x 0.75 mt in bandipur g.p under Barrackpore II Block, North 24 PGS.
Zilla Parishad
Haryana Government
Haryana Government
Estimate for Internal Clearance of Mahendergarh Disty from km. 20.520 (MD4) to 24.920 (tail) for the year 2024-2025 (Rabi).
Haryana Government
Haryana Government
Haryana Government
Haryana Government
KOLKATA MUNICIPAL CORPORATION
RESTORATION OF FILTER WATER SUPPLY IN 100 MM. DIA. SERVICE MAIN AGAINST CONTAMINATION FROM 42/H TO 70/C, DR. G. S. BOSE RD, IN WD. NO 67.
PANCHAYAT AND RURAL DEVELOPMENT
WB13MTN019
PANCHAYAT AND RURAL DEVELOPMENT
WB13MTN024
PANCHAYAT AND RURAL DEVELOPMENT
WB13MTN020
PANCHAYAT AND RURAL DEVELOPMENT
WB13MTN017
PANCHAYAT AND RURAL DEVELOPMENT
WB13MTN021
PANCHAYAT AND RURAL DEVELOPMENT
WB13 MTN012
PANCHAYAT AND RURAL DEVELOPMENT
WB13MTN035
WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD
Haryana Board Corporation
Thermal insulation works pertaining to Boiler area of 250 MW, Unit-8, PTPS, Panipat during its overhauling
Haryana Board Corporation
Rough Cost Estimate for balance work of reconstruction of roads which is dismantled due to laying of sewerage lines in Urban Estate Jind
Haryana Board Corporation
ANNUAL MAINTENANCE OF SEWERAGE SCHEME IN SECTOR-27and28 HISAR 2024-25
Haryana Board Corporation
Augmentation of 22o kv substation Deroli Ahir from (1x160 plus 1x100MVA), 220/ 132kV plus 1x100MVA 220/33kv T/F to (1x160MVA plus l x l00MVA) ,220/132kv plus 2 x 100MVA 220/33kv T/F in FY 2022-23. No
Haryana Board Corporation
Overhauling of ESP of 250 MW, Unit-7, PTPS, Panipat during overhauling
Haryana Board Corporation
Providing and fixing of RCC Drain Cover at Storm Water Drain Sector-3,4 and 5 at IMT Manesar.
Haryana Board Corporation
Overhauling of RAH of 250 MW, Unit-7 during its overhauling
Across all 11,539 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.