Loading…
Loading…
1,662 results • Latest
Extension of Balcony on the First Floor (Over Porch) at Police Headquarter, Sri Vijaya Puram.
Repair and Renovation of First Floor of the Quarter Master Store (QMS) Building located at Police Line Campus under PL-I, SD-II, SVPSD, APWD, Sri Vijaya Puram (To accommodate GYM).
RE ETENDER NOTICE FOR STREETLIGHT ANNUAL MAINTENANCE CONTRACT UNDER GRAM PANCHAYAT, WIMBERLYGUNJ, SOUTH ANDAMAN
Annual Running and Maintenance of Raj NIwas (Lok Niwas) Complex other Building and structure etc.
Construction of CC Road and Box Type Culvert with Hollow Blocks Wall Works and Covering Slabs starting from Shri Sathaiah s House to Shri Srinuwas Rao s Gandi House at Japan Road Dairy Farm Ward No 15
Providing Chain link fencing at Govt. Primary School, Mithakhari.
Providing Chain link fencing at Govt. Primary School, Hathitapu.
Supply of batteries for departmental two wheelers as per ANNEXURE I on as and when required basis for one year rate contract
Providing inverter wiring for connecting Solar Hybrid Inverter output to desired load in Police Station Kalighat and Police Out Post, Kishorinagar, Diglipur under the 3.45 MW RTS project
A/R M/O State Highway No.4 under SD-VI, CD-I,A.P.W.D., Sri Vijaya Puram During the Year 2026-2027 SW Construction of CC Drain from Sea Lion Group Office towards Shive Temple leftside at Camp No.4
Supply of welding items for PMT as per ANNEXURE I. on as and when required basis
Providing sub main wiring for connection of Solar Inverter output power to Desired Load of 01 No. Building at GPS Tushnabad 3KW under SDII, Wimberlygunj, EandM Division, APWD, Prothrapur
Rewiring of Vegetable Market at V.K. Pur 01 under Gram Panchayat Vivekananda Pur.
Ceiling cum Electrification of Panchayat Vegetable Market at Neil Kendra.
Construction of Black Top Road from main road to Shri. Jayanto Dhali land at V.K.Pur-01 under Panchayat Samiti Little Andaman. (Revised Estimate)
Re-Electrical wiring of Panchayat Samiti Guest house at Hut Bay along with Repair and Maintenance of Air Condition (AC) unit under Panchayat Samiti Little Andaman.
Providing electrical wiring for connection of solar hybrid inverter output power to the desired load at Passenger Hall, Rangat Helipad, Middle Andaman.
Providing electrical wiring for connection of solar hybrid inverter output power to the desired load at Office cum Godown MP Farm, Agriculture Deptt. Panchawati, Middle Andaman.
Providing Chain link fencing at Govt. Primary School, Tushnabad.
A R and MO rural road under CD-III, APWD,Prothrapur for the year 2026-27. Sub Work Repair and maintenance of rural road under Manjeri Section, SD-II, CD-III, APWD
AR and MO rural road under CD-III, APWD,Prothrapur for the year 2026 27. Sub Work Repair and maintenance of rural road under Humfrygunj Section, SD-II, CD-III, APWD.
Providing Chain link fencing at Govt. Primary School, Lamba Pahad
Construction of Inspection Bungalow (Doubled Storeyed 04 Nos Rooms) for APWD, Campbell Bay.
Construction of Office-cum-residence for JE (E and M) under CD, APWD, Campbell Bay.
Supply of Spring Leaves
Providing Chain link fencing at Govt. Primary School, Hope Town.
Augmentation of Water Supply by increasing the dia of pipe at Yatri Niwas, Gurjan Nallah and Karmatang X Spring source under SD-I, NACD, APWD, Mayabunder.SW-Balance work
Providing Chain link fencing at Govt. Primary School, Kadakachang.
Supply of Supplementary Nutrition Programme Articles Wheat Daliya and Onion for all 119 Anganwadi Centers under ICDS Project Diglipur
Providing Chain link fencing at Govt. Primary School, Ranchi Basti, Namunaghar.
Annual maintenance of streetlight under Gram Panchayat Mannarghat 2026-27
Providing Chain link fencing at Govt. Primary School, Tirur.
Providing and replacement of 80 mm from 65 mm GI pipe line from the existing of 80 and 150 mm GI and DI pipe line from opposite TTI Collage to Shri.Harbin Singh (opp. Nehru Kendra ), Uma house to Krishna house and Shri Prashant House and 100 mm dia
Construction of Ring well inside Kali Mandir at Ward No.07
Providing and laying 80mm to 50mm dia GI pipe line from Shri.Shah House to Shri. Tapan Kumar Halder House Jawahar Colony Road in Ward No.15
Providing and laying 50mm, 65mm and 80mm dia GI branch pipe line from Hudco Colony to Manoj House via Ajith House for Sky line Colony at School line in Ward No.15
Repair and renovation of Goat shed at Cattle holding farm, Dollygunj under CD-I , APWD , Sri Vijayapuram
AMC of Streetlights in all wards under G P Ferrargunj
SITC of Air Conditioners at DGP Chamber, SP (HQ) Chamber, SP (Traffic) Chamber, DIGP (CID) Chamber, Account section, DHQ/SAD and Gazetted officer/s mess, Sri Vijaya Puram
Construction of 05 KLD Faecal Sludge treatment plant ( FSTP) at Netaji Nagar Cluster under MID, APWD, Hut bay (6th Call)
AR and MO rural road under SD-II, CD-I, APWD, Rangat. SW-Improvement of village road from Mithila Chowk to Shri. Binod Mazumder house at Mithila-I.
Providing IEI and EEI and SITC of 4 Ton Tower Air Conditioners, 2 Ton Split Air Conditioner and Air Curtains in Passenger Waiting Hall at Shaheed Dweep Jetty under Sub Division IV EandM Division, APWD Prothrapur
Furnishing of Furniture and inventories for Inspection Bungalow at Car Nicobar. 2nd Call
Rewiring of Panchakarma Therapy Room Ayurveda Unit Car Nicobar.
Construction of CC Road from main road to Nirmal Biswas house at Pokhadera ward No. 01 under Gram Panchayat, Pokhadera.
Construction of 01 No. Culvert near the house of Bholenath Baroi at Janakpur-II under Gram Panchayat, Dasarathpur.
Dismantlement Old Dilapidated SP Office at IRBn Campus, HQ Car Nicobar. Without Land
Providing IEI and EEI and SITC of 4 Ton Tower Air Conditioners 2 Ton Split Air Conditioner and Air Curtains in Passenger Waiting Hall at Shaheed Dweep Jetty under Sub Division IV EandM Division, APWD, Prothrapur SW Providing IEI and EEI
AR and MO rural road under SD-IV, Nimbutala of CD-I, APWD, Rangat. SW-Providing the services of unskilled labour for upkeep and maintenance of various works under SD-V, CD-I, APWD, Rangat.
AR and MO water supply under SD-III, CD-I, APWD, Rangat. SW-Improvement of piped water supply at Lucas Dam at ward No. 2 Adazig Baratang by Construction of CC wall protection of existing weir to stop leakage and construction of RCC surface tank.