Loading…
Loading…
2,802 results • Latest
Overhaul of Overhead travelling hoists in Boiler Auxalaries area, Pre Treatment Plant area and Chlorination plant in Stage-IV Dr.NTTPS as and when required for the year 2026 27
Supply of IGV assemblies,Supporting bush and bush coupling for IGV blade shaft of PA Fan
SDSTPS -3X800MW- Strengthening of beams for capacity enhancement of hoist from 5 Ton to 12 Ton at Air Compressor House of Stage -I.
Providing 70 Nos of 1x90W LED Street Lights on 7.5 Mtrs long octagonal poles and 8 Nos of 90WLED street lights on PSCC poles at Apparel Export Park and Block-A and fixing of 170Nos of 90W LED Street lights on existing Street light poles in all blocks of Autonagar, Visakhapatnam District under APIIC-IALA Funds.
SDSTPS -3X800MW- Filling low lying area for strengthening the ECCS pillars and safe guard the lands of APPDCL for approximate length of 175m from pillar No.3 towards head end.
Overhaul works on Boiler pressure parts for replacement of eroded tubes of LTSH, Back-pass and Economizer tubes and metal filling on eroded tubes where ever required after D-meter survey, Inspection, fixing and Adjustment of Erosion protection shields at Unit-6/Stage-IV/Dr.MVR RTPP during annual overhaul period 2026-27.