Loading…
Loading…
31,670 results • Latest
Reconstruction of Mukhamandapam of Sri Malleswara Swamy Temple, Mangamuru(V), Santhanuthalapadu(M), Prakasam District
Renewal of existing damaged BT Surface with hot mix process to Tirumala Rao Street in 36th Division in works Division-II. (Rc.E11-121084/2025)
Providing Temporary illumination to Srivari Salakatla and Navaratri Brahmotsavams Road from M.R Palli Circle to Lakshmipuram Circle via Annamaiah Circle pertaining to ESD-WEST, Tirupati for the year 2026-2027
Service charges for the work of "AME for operation of DG sets, CAC units available in TTD Kalyanamandapams at Visakhapatnam & Vijayawada for the year 2026-27
Supply of Chicken and Eggs to Hostels of Yogi Vemana University, Kadapa
Providing CC Road & Drain in Salipeta Balaji nagar from Siddhu medical shop to Venkateswara Rao gari House in Poranki Circle of Tadigadapa Municipality
Procurement of handheld Nitrite tester, Ammonia tester, Digital Free chlorine testing machines for daily water supply Under EE-II division of GVMC.
CONSTRUCTION OF REVERSE OSMOSIS DRIKING WATER PLANT FOR APPA AT ARMS DEPOT AT 6TH BN MANGALAGIRI OF GUNTUR DISTRICT
2025-Eng04-34-105 Renewal of BT Road at Bowdara road from Railway underpass to Ramakrishna Rythubazar junction in Ward No.34 of Zone-IV.GVMC
Construction of Culvert for Storm water drain and Toilets renovation in Rajeev Gandhi park at Circle-1 area. Rc.E3.PD3(Parks)-112071/2026
Providing Yard Electrification in Market Yard, Singarayakonda of A.M.C, Kondepi in Prakasam District
Construction of CC road at durga vidyuth nagar d.no.70-7-67/1 to 70-7-67/2 in 2nd division kakinada municipal corporation.
Procurement of Desktops, Multifunction Printers, Keyboards, Mouses to Passport Cell Office, O/o Police Commissionerate Visakhapatnam City.
Construction of Additional Room at AWS Chinthareddypalem in Nellore Rural Mandal, SPS Nellore District, Est.Cost:- 10.00 Lakhs
RFP for Engagement of PMC for Construction Supervision and Project Management of Lump Sum Contract (%Tender) Works including DLP of 2 Years for works of : (1) Package XXXVII: Flood Protection and Strengthening of Inspection of Right Bank of River Krishna E1 Road (Karakatta) from Ch.0+300 to Ch.2+480; (2) Package XXXVIII: Flood Protection and Strengthening of Inspection of Right Bank of River Krishna E1 Road (Karakatta) from Ch.2+480 to Ch.4+990; (3) Package XXXIX: Flood Protection and Strengthening of Inspection of Right Bank of River Krishna E1 Road (Karakatta) from Ch.4+990 to Ch.7+200; (4) Package XXXXX: Flood Pumping Station-2 (8400 Cusec Capacity) at Undavalli Village; (5) Package XXXXXIII: 2lane Bridge including Shiplock & Regulator for Kondaveetivgu and Guntur Channel; and (6) Package XXXXXVIII: Construction of Roads, Drains, Water Supply, Sewerage, Utility Ducts for Power & ICT, Reuse Waterline, STP & Avenue Plantation compatible with Trunk Infrastructure Layout in Zone-11
Improvements to the Road from Nagalamma Temple to SWPC Shed at Settipeta (V) of Nidadvole (M),Est Cost Rs:-15.00 Lakhs
Construction of Building for promotion of handloom saree and SHG Products including Cafeteria at TTDC Premises, Gollapudi, Vijayawada, NTR District as a deposit contribution work
Request for Empanelment of "Firms for rendering Comprehensive Architectural Services" for AGICL in Amaravati
Drilling of borewell of dia 165mm at J.Venkataramana street in 30th in Madanapalli Municipality
Providing CC Roads to Connecting bits of 1 & 2 Roads (Opp. Vambay Colony ELSR) at Devineni Gandhi Puram Area in 61st Division
SUPPLY OF VARIOUS TYPES OF GLOBE VALVES WITH SOCKET WELD ENDS
Construction of dividers from Shiva circle to Annamaiah circle and providing avenue plantation (Beautification, greenery and street lighting) in Yemmiganur Municipality under 15th F.C Revised Annual development plan (RADP) for the year 2021-22 (1st & 2nd Instalment) untied grant.
Construction of Anganwadi center at Bangarubudi Solabam GP G.Madugula Mandal ASR District
Providing Road Marking, Molded Shanks, Signage Boards and Kerb Painting on Municipal Roads within the limits of Kadapa Municipal Corporation
15 TH FCG 2024-25 (1st Installment):-Laying of CC Road from D.No: 7-1-768/3 in Ilamma Colony, Ward No:22 in Badvel Municipality.
Improvements to Ayacut road towards Sunki reddy kunta near Durvesi (V), Gadivemula (M), Nandyal District
Construction of CC Drain to Pala Sharab vari street in 15th ward in Tanuku Municipality
DR.NTTPS/SUPPLY AND INSTALLATION OF ULTRASONIC FLOW TRANSMITTERS FOR CW FLOW MEASUREMENT
Annual Maintenance and Supply of LPG spare parts to TTD Institutions at Tirupati and TTD temples in and around Tirupati for the year 2026 27
Improvements and Special Repairs to Sri Venkateswara Swamy Temple, Siddantham(V), Penugonda (M), West Godavari District
Reconstruction of Sluice Kothalalankavari tank in Chebrolu village limits in Gollaprollu mandal."" (UNDER DMF GRANT) JALADHARA-JALAHARATHI Class-II Mechanical Registration Certificate and above (Fabrication and Erection of Structural Steel)
Selection of service provider for Provision of 5Gbps of ILL link from a Tier-1 ISP at APSDC, Mangalagiri, Amaravati for the period of 2Years for ITEC Dept
Restoration, Monitoring and management of Nellore Barrage of nellore city limits of SPSR Nellore.
Development to the burial ground at Old Madhurawada in Ward No. 08 of Zone-II.
Maintenance of 4 Nos. MDR Roads (Package No.1) of R&B Section, Vissannapeta for the year 2026-27
Construction of Anganwadi Centre at Monjaguda Village in Lakshmipuram GP of Munchingiputtu Mandal of ASR District Estimate Rs.12.00 Lakhs
Annual Maintenance Estimate for O & M of Musurumilli Main canal and its Distributories from Km 0.000 to Km 32.370 & Left branch canal from Km 0.000 to Km 9.115 and its Distributories for the water year 2026-27.
Improvements to the road Konkallu Cross to Itekepalli (via) Dinnekatti, Kurubarapalli, Muthukuru road from Km 0/0 to 6/370 in Sri Sathya Sai District.
Providing CC Drains both sides of roads in SC Colony layout from Plot 1 to 12 in Thimmapuram (V) of Prathipadu (M). Est. Cost Rs. 6.50 Lakhs
Rejuvanation and Strengthening of Bund by Conducting CC Drain from Rajula Complex road to RTO Office Back side along Padarupalli Lake in Division No.22 of NMC Under 15th FCG 2025-26 (1st Installment)
Replacing age old AC pipe line with HDPE pipeline and providing HSC Connections to from RTC workshop road to Sanjay Gandhi colony road as apart of Summer of Summer Action plan-2026 in 38th division in Circle 1. (4th CALL)
Repairs and paintings to the existing central median & footpath from telugu thalli statue to kalinga function hall in ward no 23 of East Zone, GVMC.
Cobble Stone Pavement Works for BR Stadium Junction in Guntur Municipal Corporation.
Procurement of Lot-1: 822 Nos 33 kV Polymer Lightning Arresters (31mm/kV Creepage), Lot-2: 543 Nos 132 kV Polymer Lightning Arresters (31mm/kV Creepage), Lot-3: 153 Nos 220 kV Polymer Lightning Arresters (31mm/kV Creepage) and 5 Nos 400 kV Polymer Lightning Arresters (31mm/kV Creepage)
Construction of Anganwadi center at Noothulu-Maliguda (GK Veedhi) of GK Veedhi Mandal ASR District
Providing CC Road from Shaik Khadar babu house to Venkateswarapuram arch entrance in 17th ward in Tiruvuru Municipality.
Construction of CC Roads from Door No.3-73-1 to Door No.3-78,Pula Rajesh house to Prakash house,State bank to Door.No.3-52, Door No.11-27 to Door No.11-232,Nataraj shop to D.No.11-232 in 20th ward New Sc Colony Secretariat of Kalyandurgam Municipality Under BPS Funds 2019 and 2020.
Annual maintenance of Sri Prasanna Venkateswara Swamy Temple in Kosuvaripalli, Chittoor District for the year 2026-27
Laying of CC Road from D.No.6-14-13 to D.No.6-11-49 in Ganta vari Street in Ward No.07 (Under 15th FC Grant)