Loading…
Loading…
31,983 results • Latest
Constrction of Burning Platform, Waiting hall and Washroom for the Existing burial ground located in Relli veedhi,SC Colony, Ward No.47 Under 15th Finance Grant (2024-25 2nd Installment) Est Cost Rs.20.00 Lakhs.
Constrction of Compound Wall and Pathways to Park, in Lakshmi Ganapathi Colony, Poolbagh Colony,Ward No.1 Under 15th Finance Grant (2025-26 1st Installment) Est Cost Rs.25.00 Lakhs.
Laying of CC Road from EP No.D1/228/A1to H.No.381, in Gajulregha Main road, Ward no.49 Under 15th Finance Grant (2024-25 2nd Installment) Est Cost Rs.38.00 Lakhs.
Construction of Toilets, CC Pathway and CC Platform in the existing Burial Ground,in Kothapeta, Ward No.14 Under 15th Finance Grant (2025-26 1st Installment) Est Cost Rs.33.50 Lakhs.
Construction of CC Drain from EP No.D2/311/A5 to Padma Nilayam, 1st Lane in Padmavathi Nagar, Ward No.31 Under 15th Finance Grant (2024-25 2nd Installment) Est Cost Rs.10.50 Lakhs.
Providing Toilet Block, Water Supply, Burning Platform and Waiting hall for the existing burial ground located in Dharmapuri, in Ward No.30 Under 15th Finance Grant (2025-26 1st Installment) Est Cost Rs.25.00 Lakhs.
Laying of CC Road from EP No.D5/81/C2 to 525/3A, in Mangala veedhi Main road, Ward no.4 Under 15th Finance Grant (2025-26 1st Installment) Est Cost Rs.39.50 Lakhs.
Laying of CC Road from Flat No.42 to 48 in Gayatri Nagar,Ayyannapeta in Ward No.44 Under 15th Finance Grant (2024-25 2nd Installment) Est Cost Rs.12.75 Lakhs.
Providing Toilets, Water Supply, Burning Platform& Waiting hall for the existing burial ground located in Vt Agraharam-1, Ward No.35 Under 15th Finance Grant (2024-25 2nd Installment) Est Cost Rs.25.00 Lakhs.
Constrction of pathway, Watersupply, Burning Platform and Waiting hall to burial ground, in Paulnagar, Ward No.43 Under 15th Finance Grant (2024-25 2nd Installment) Est Cost Rs.20.00 Lakhs.
Construction of Pathway, Burning Platform and Waiting hall to the Burial Ground, in KL Puram, Ward No.47 Under 15th Finance Grant (2024-25 2nd Installment) Est Cost Rs.38.00 Lakhs.
Constrction of Waiting hall, Burning Platform and Washroom for the existing burial ground, in Kothamajji peta, Vt Agaraharam, Ward No.36 Under 15th Finance Grant (2024-25 2nd Installment) Est Cost Rs.25.00 Lakhs.
Construction of Toilet block,Burning Platform, Waiting hall & Providing Water Supply to Venugopalapuram burial ground, Ward No.1 Under 15th Finance Grant (2025-26 1st Installment) Est Cost Rs.22.00 Lakhs.
Laying of CC Road from EP No.2/4A (Irani Tea shop) to Lakhsmi Ganapathi School (Plot No.26) in Dhana laxmi nagar in Ward no.45 Under 15th Finance Grant (2024-25 2nd Installment) Est Cost Rs.22.00 Lakhs.
Laying of Internal CC roads and Compound wall in 12.5 MLD WTP, in Pandaripuram, Ward no.35 Chilakaluripet Municipality under 15th FC 2020-21 (2nd Inst) Tied Grant
Supply,Delivery & Laying of 160mm Dia & 110mm Dia HDPE Pipe Line in Kotha Clony 3rd Line,East Malapalli,Jakeer Hussain Street,Bondili Palem,Sarada High School road and Other Areas In Chilakaluripet Municipality under 15th FC Grant
Laying of CC Road from Vedha School Back side to Door No: 35-375/2 29th ward in Chilakaluripet Municipality under APUFIDC Soft loan
Laying of 200mm dia HDPE pipe line and Interconnections to existing pipe line from TIDCO houses to YSR colony, in Ward no.38 Chilakaluripet Municipality under 15th FC 2020-21 (1st Inst) Tied Grant
Providing 350mm dia HDPE Pipeline from D.No 8-201 ( Radhika sweet shop) to D.No 10-136 ( sk. Mahabubi Subhani House) in ward no 8 in Chilakaluripet Municipality under 15th FC Grant
Supply delivery and erection of 12Mtrs MS Tubular ring poles at various locations in Ward no.70 of Zone-VI area of GVMC.
Hire charges for arranging Serial sets for the roads of KKC and Asthana mandapam surroundings, RBRH road to Vaibhavotsava mandapam during Srivari Navarathri Brahmotsavams in ESD-North,Tirumala for the year 2026-27
PROVIDING OF 1NO. 3TON VAN FOR CONVEYANCE OF CBD GANG TADIKONDA ON WORKS CONTRACT BASIS FOR CARRYING OUT OPERATION AND MAINTENANCE, EMERGENCY AND BREAKDOWN WORKS OF EHT LINES, TADIKONDA IN O&M DIVISION, GUNTUR
PROVIDING OF 1NO. 3TON VAN FOR CONVEYANCE OF CBD GANG SATTENAPALLI ON WORKS CONTRACT BASIS FOR CARRYING OUT OPERATION AND MAINTENANCE, EMERGENCY AND BREAKDOWN WORKS OF 400 KV EHT LINES, SATTENAPALLI IN 400KV/O&M DIVISION, SATTENAPALLI
PROVIDING OF 1NO. 3TON VAN FOR CONVEYANCE OF CBD GANG TADEPALLI ON WORKS CONTRACT BASIS FOR CARRYING OUT OPERATION AND MAINTENANCE, EMERGENCY AND BREAKDOWN WORKS OF EHT LINES, TADEPALLI IN O&M DIVISION, GUNTUR
FOR PROVIDING OF 1NO. 3TON VAN FOR CONVEYANCE OF CBD GANG TALLAPALLI ON WORKS CONTRACT BASIS FOR CARRYING OUT OPERATION AND MAINTENANCE, EMERGENCY AND BREAKDOWN WORKS OF EHT LINES, TALLAPALLI IN O&M DIVISION, NARASARAOPET
Supply of Tracksuit sets (Track jacket & Track Pant), High Performance Running Shoes and Sports Polo T- Shirts for AP Police Sports
Supply and delivery of Water tanker with 4000 liters capacity in Chilakaluripet Municipality under 15th FC Grant
Hire charges for arranging serial sets for the roads of KKC and Asthana manpam surroundings, RBRH road to Vaibhavotsava mandapam during Srivari Annual Brahmotsavams in ESD-North,Tirumala for the year 2026-27
SUPPLY OF PLAIN ALUMINIUM SHEET FOR ALL DUCTS OF UNIT-IANDII BOILERS
Providing cleaning, Sweeping services on activity basis for the TTD Kalyanamandapams at Malakonda, Giddaluru and Yerragondapalem in Prakasam District for the year 2026-27
Providing cleaning, Sweeping services on activity basis for the TTD Kalyanamandapams at Kothagudem in Khammam District for the year 2026-27
Providing cleaning, Sweeping services on activity basis for the TTD Kalyanamandapams at Veldurthy, Piduguralla & Ananthavaram in Palnadu & Guntur Districts for the year 2026-27
Laying of Thermoplastic Paint & Junction Boards to existing CC Pavement under Kotaveedhi Sachivalayam in Rayadurg Municipality
Laying of Thermoplastic paint & Junction Boards to existing CC Pavement under Obulachari Road sachivalayam in Rayadurgam Municipality.
Laying of Thermoplastic paint & Junction Boards to existing CC Pavement under Shanti Nagar-01 sachivalayam in Rayadurgam Municipality
Laying of Thermoplastic paint & Junction Boards to existing CC Pavement under Drivers Colony sachivalayam in Rayadurgam Municipality.
Laying of Thermoplastic paint & Junction Boards to existing CC Pavement under Chowdeswari Colony sachivalayam in Rayadurgam Municipality
Laying of Thermoplastic paint & Junction Boards to existing CC Pavement under Bellary Road-01 sachivalayam in Rayadurgam Municipality.
Laying of Thermoplastic paint to existing CC Pavement under Parvathi Nagar sachivalayam in Rayadurgam Municipality.
Laying of CC Road from D.No:- 16-4-540/2 to 16-4-524/2 beside major drain in 10th ward near of Rayadurg Municipality under Soft Loan
Laying of Curbs in CBN park at Shanthi nagar bellary road 31st ward of Rayadurg Municipality
Laying of CC Road from D.No.8-1-67 to D.No 8-1-114 in 18th ward Medhar Street of Rayadurg Municipality under Soft Loan
Laying of CC Road from D.No. 9-4-517 to 9-4-530/3-1 in 15th ward Mutrasi Colony of Rayadurg Municipality under Soft Loan
Laying of CC Road from D.No. 9-4-427 to 9-4-380 in 16th ward Rajiv Gandhi Colony of Rayadurg Municipality under Soft Loan
Laying of CC Road from D.No.9-5-639/9 to JR 1B in 14th ward JRS Colony of Rayadurg Municipality under Soft Loan
2026-HOR01-CB-137- Maintenance of Existing central median Road East zone MVP Double road from Isukothota jn to beach road end point (1.1km) and Rama laxmana apartments jn to A.S. Raja circle jn (800mts) and Sai baba temple to Indian oversees bank,(600rmts) including vertical gardens(52 sqmts) at sector -VIII for further Period of 09 months 01-06-2026 to 28-02-2027.
Improvements to the road (a) Narayanapuram Rajala road from Km 0/0 to 5/660 (b) Improvements to the road Vijayawada-Visakhapatnam Road (Old NH-5) Km 325/690 to 333/015. (Yellamanchili Town Limits) in anakapalli District
2026-HOR01-CB-196 Maintenance of Existing Road central median (0.8km) and service road medians both sides from Polamaba temple jn to East point colony (0.8km) and service road medians (0.6km) , including green belts 4 no.s (300smt)for further period of 09 months from 01.06.2026 to 28-02-2027.
2026-HOR01-CB-200 Proposals for Maintenance work from beach road Park hotel jn to Kurupam circle central median (1 Km),including both side pockets from GCC (800 sqmts) and Both side verticale Garden at Gayatri school (70 Sqmts) for further period of 09 months from 01.06.2026 to 28-02-2027.
2026-HOR01-CB-201 Proposals for Maintenance work from beach road Kurupam circle to Rope way Bus stop central median (1.3 Km),including side pockets both side from kurupalm circle to tenneti park (1400 sqmts), Both sides verticle garden at Gadiraju palace(97 Sqmts) and kurupam circle island & Tenneti park jn isalnd (30 Sqmts) for further period of 09 months from 01.06.2026 to 28-02-2027