Loading…
Loading…
Tender Value
₹7.9 L
EMD Value
₹19,800
Closing Date
15 Oct 2026, 5:30 pmClosed
Divisional Engineer-(Elec-II), Tirupati
elc2div
Hiring of Line Array PA System & DG set in connection with Conducting of Sri Mahalakshmi Deepa Pooja conducted by the SVBC at Kuppam, Chittoor Dist. (Part-A).
1002651
492/DE(Elec.)-II/TTD/Tpt/2026-27
OPEN - NCB
Electrical Works
CHITTOOR, ANDHRA PRADESH
5 documents required · 5 mandatory
₹281
₹19,800
12 Oct 2026
12 Oct 2026
12 Oct 2026
Hiring of JBL VRX 932 LA 800 Watts Line Array Speakers with Speaker Cable wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of Delay JBL SRX 725 Line Array Speakers with Speaker stands, Speaker Cable wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of 600 Watts Stage Speakers with Speaker stands, Speaker Cable wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution For One day and removal of equipment, labour charges etc., complete
Hiring of JBL SRX 828S Bass 2000 Watts Sub-Woofers with Speaker stands, Speaker Cable wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of 4/4 Box Truss for Speakers Line Array Speakers including Transportation for this equipment, with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of 1000 Watts Box type of Speakers with LF, HF & MF with Speaker stands, Speaker Cable wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of 500 Watts Box type of Speakers with LF, HF & MF with Speaker stands, Speaker Cable wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of 500 P.A. Power Amplifiers with wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of 4500 Watts P.A. Power Amplifiers with wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of 4000 Watts P.A. Power Amplifiers with wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of 3000 P.A. Power Amplifiers with wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of 1000 P.A. Power Amplifiers with wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of SM-58 Shure Microphone with cable necessary connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of 1000 XLR Ahuja Microphone with cable necessary connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of Table stand along with Mic clip, Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of Floor stand along with Mic clip, Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of Audio Mixer Console 32 Channel and Snake cable with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of Audio Mixer Console 24 Channel and Snake cable with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of 22 Channel Snake cable with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of 16 Channel Snake cable with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of Cross over with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of Power Rack 3 Phase, with wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of SHURE UHF WIRELESS MICS with cable necessary connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of 30Watt Unit type/ Horn Speakers (Including TT wire required from Amplifier to Speaker) wiring connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of Audio Unit Rack with wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of Delay Unit with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of Feedback destroyer Unit with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of DVD Player / MP3 Player with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of Graphic Equalizer with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of Effect Processor with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hiring of Output link Amplifier with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For One day and removal of equipment, labour charges etc., complete
Hire charges for supplying, fixing, wiring and 62.5 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions
Hire charges for supplying, fixing, wiring and 125 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Transportation charges for DG set of 62.5 KVA to 125 KVA for including loading and unloading charges. The distance for transportation is to be accounted from the place of hiring to the workspot.
Supply & Transportation of Diesel oil for 62.5/ 125 KVA DG Set Note:- Diesel consumption as per the actual hours operated during program
(Rupees Seven Lakh Ninety One Thousand Five Hundred Sixty Five and Paise Thirty One Only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT 492.docx
TENDER_DOCUMENT • 0.18 MB
Schedule 492.xls
TENDER_DOCUMENT • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .