Loading…
Loading…
3,959 results • Latest
Strengthening of Moinamiri Bund (from Gozaigaon to Rongagorah) for 2025-26.
Protection of river bank at Garal area from the erosion of river Brahmaputra.
Anti-erosion measures to protect Dharapur area from the erosion of river Brahmaputra.
Construction of Bridge in Golaghat District i) Br. No. 3/1 on road from 2 no Bokuli Chapori to Kancha-chapori Via Devithan
Construction of Bridge in GolaghatDistrict i) Br. No. 1/1 on Julungabheti to Bortika via Missimiati Saguri
Switchyard Gravelling and PCC at 132KV side of 132KV Sipajhar GSS, AEGCL
Supply and Installation of Transmission Line Surge Arresters for 132kV BTPS Dhaligaon D/C TL and 132kV Dhaligaon-Gossaigaon S/C TL
Construction of CC Block road from Rowta Veterinary Hospital to Balisiha Habi under SOPD-BTC for the year 2025-26.
Construction of Bridge in Charaideo District i) Br.No. 1/1 on Ghurajan and Garakhiapam connecting Road
Construction of Bridge in Dibrugarh District i) Br. No. 1/1 on Bordoloni Kathalbari Road
Construction of Bridge in Dibrugarh District i) Br No. 1/2 on Tiohjolia Road
Construction of Bridge in Jorhat District i) Br No 1/1 of Greenview TE Road
Construction of Bridge in Golaghat District i) Br No. 1/1 on E and Dyke to Kameri Gaon Ali
Const. of ICBP road at Jaobari village at Bijni in Chirang District for the year 2025-26 (Part-I) (From Ch.0.00m to Ch.950.00m). TN-394-7.
MMPPNA_RIDF_XXXI_25_26_72 Construction of Road from (1) Bordandi to Sikerselek Road from Ch 0.00m to Ch 1000.00m, (2) Laimekuri Higher Secondary School to Nari Road from Ch 0.00m to Ch 1000.00m, (3) Bilaimara to Naharani via Namkir chuk fom Ch 0.00m
CE/EAP/ARRBP/OCB/Bridges-2/Udalguri/11 Construction of Bridges in Udalguri district i) Br. No. 3/1 on Ambagaon Kubirali Road ii) Br. No. 6/1 on Ambagaon Kubirali Road
Supplying and installation of antique design Street Light through both sides of the road with underground cabling ( Considering 25m pole to pole distance for 1000m at Gar ali to K. B Road upto Gitarthi point(1150.00 M)
Construction of Road from Mohoricamp to Majgaon Shiv Mandir (From Ch. 0.00m to Ch. 1200.00m, L 1.20Km) under SOPD-G for the year 2025-26, 78 No. Dhemaji ST LAC
Construction of 1 No. RCC Box Cell Culvert with 2 Cell near 978 Turibari LP School Patabari PWD under Patabari VCDC under Sidli Chirang Dev. Block under Chirang District. TN-388-1.
Construction of ICBP Road from Binu Ray House to No.1 Sishubari LP.School at Bijni in Chirang District of BTC for the year 2025-26. TN-394-11.
Package No. CE/EAP/ARRBP/OCB/Bridge-1/Udalguri/15 Construction of Bridge in Udalguri district i) Br. No. 2/1 on Ambagaon Kubirali Road to South Hagramari
Construction of 07 nos of Drains at Doomdooma MB under the scheme of Infrastructure Development in ULBs for FY 2023-24 (GR-III)
Construction of Bridge in Sonitpur district i) Br. No. 1/1 on Harchura Bagan to Factory connecting Road Package No CE/EAP/ARRBP/OCB/Bridge-1/Sonitpur/03
Supply of Turbine Gas Flow Meter with EVC, G- 160 and G -250
Construction of 2 Nos. of RCC Check Dam at village Ulupara (Dhopguri) and 2 No. Sakhati under SOPD for the year 2025-26
Recovery and Reconstruction of Jaokatagaon to Nimurtari under NDRF (PDNA-2022) for the year 2025-26.
Recovery and Reconstruction of Natun Gunjung Bagetar Road under NDRF(PDNA-2022) for the year 2025-26.
Construction of Rubble Masonry Boundary Wall and Development of Land by earth filling for setting up a New Industrial Estate Chapor, Dhubri under ASIDC Ltd.
Repair and Maintenance of Bridge in Dibrugarh District i) Br No. 10/1 on Khowang Bhamum Road
Construction of Koronga road by providing ICBP under SOPD-G under Sivasagar Demow Territorial Road Division, for the year 2025-26
Construction of Bridge in Lakhimpur District i) Br No. 1/1 on Gamchuk to Adisuti Miri Road
Constn. /Imp.of road Surjya Path, Aarohan path, Gorokhia path, Lilabotibylanes, Salpha patty, Hatimura sub-centre road, Development C-lane, Tekela Chiring Gaon Namghar Path under MukhyaMantrir Paki Path Nirman Achani (MMPPNA) under SOPD-G
Constn. /Imp.of (i) DhekeriGaon road, (i) Ramdhenu path (iRamdhenu by lane 1 under MukhyaMantrir Paki Path Nirman Achani (MMPPNA) under SOPD-G for the year 2025-26.
MMPPNA_RIDF_XXXI_25_26_174 Construction of Road from (1) Paschim Jingia to Deendayal College Road (2) 02 No. Pulisumoni village Road via Bihapukhuri Kachari under Mukhya Mantrir Paki Path Nirman Achani (MMPPNA) under RIDF-XXXI of NABARD for the year
Construction of Bridge in Lakhimpur District i) Br No. 1/1 on Solichuk to Borkhamukh
PROCUREMENT OF IT SOFTWARE
MAINT/SOPD-G/2025-26/154_1_Reconstruction of Road from Tumni to Simlakandi High School and 2_Reconstruction of Road from HM Road to Kharuabanda via PHE Office 3_ Reconstruction of Road from Kutirghat Pathuria Road to Namargaon under SOPD_G for the ye
Constn/Impof (i)Daraka path (ii)Rodali Path (ii)Boruah Path (iv)Kanaklota Path (v)Milijuli Path (vi)New Bye Lane (vii)Santoshi maa (vili)Q bye Lane under MukhyaMantrirPakiPath Nirman Achani(MMPPNA) under SOPD-G for 2025-26
Recovery and Reconstruction of Natun Gunjung North Bagetar New Hospital Road under NDRF(PDNA-2022) for the year 2025-26.
Recovery and Reconstruction of Uttarpara to Gerua via Lebrapara Road under NDRF (PDNA -2022) for the year 2025-26. TN-386-16.
Recovery and Reconstruction of Nayabasti to Uttarkuchi Road Bridge at Ch 4830.00 m and 5230.00 m under NDRF (PDNA-2022) for the year 2025-26 TN_386_13
Engagement of NGO/ Firm for Implementation support of resettlement plan in four subproject areas (Lot 4- Barpeta, Dhubri and Goalpara Districts)
Engagement of NGO/ Firm for Implementation support of resettlement plan in four subproject areas (Lot 3- Nagaon, Morigaon and Kamrup Districts)
Recovery and Reconstruction of Nayabasti to Dakhinkuchi road under NDRF (PDNA-2022) for the year 2025-26. TN_386_12
Engagement of NGO/ Firm for Implementation support of resettlement plan in four subproject areas (Lot 2- Sivasagar, Jorhat and Golaghat Districts)
Const of Temp Pandal BarricadeShedsTemporary OffCamps at locationKamakhya RailwayStatMaligaonPandu PortNaharbari FieldSonaram FiledTemporary structure different locat from Foothill totheMainEntranceof MaaKamakhya via Bongshiroad in connectwithAmbubac
Recovery and Reconstruction of Baganpara Nayabasti Road (culvert at Ch 3100.00) under NDRF (PDNA-2022) for the year 2025-26TN_386_5
Engagement of NGO/ Firm for Implementation support of resettlement plan in four subproject areas (Lot 1- Dhemaji, Lakhimpur, Sonitpur and Biswanath Districts)
Construction of CC Block road with 1 Box type culvert from Kalpani Bazar to Edrish Ali house at Kalpani under Sunbari VCDC in Baksa District for the year 2025-26. TN-395-2.
Construction of ICBP road from Motonga to Narshigbari road under Dhekiajani VCDC in Baksa District for the year 2025-26. TN-395-1.