Loading…
Loading…
392 results • Latest
for Restoration and re-alignment of the Ghareri Main Choe channel bed for regulation of flow of water and mitigation of bank erosion in Lower Ghareri Beat, Ghareri Block, Nepli Range during 2026-27
Clearance of Sukhna Choe bed and its banks to make it free from polythene waste unwanted weeds in Hallomajra Beat, Hallomajra Block, Nepli Range during 2026-27
restoration and re-alignment of the Nepli Main Choe channel bed for regulation of flow of water and mitigation of bank erosion in Upper Nepli Beat, Nepli Block, Nepli Range during 2026-27
Cleaning of existing road gullies and manhole/ inspection chamber for SWD from Junction No. 2 to Regulatory End, Rock Garden and Sukhna Lake Drain, U.T., Chandigarh under SDE W/S 2 Chandigarh (for the period of 03 months) (Ch. to 2215 (N.P) Urban Wa
Re-carpeting of Roads and Parkings of Alumni House to Boys Hostel No. 8 road, UIAMS road/parking, BMS Block I and II in Panjab University South Campus, Sector 25, Chandigarh.
Cleaning of existing road gullies and manhole inspection chamber for SWD from Junction No. 3 to Junction No. 33 UT Chandigarh under SDE Sew 1 Chandigarh for the period of 03 months Ch to 2215 (NP) Urban Water Supply