Loading…
Loading…
392 results • Latest
RESTORATION AND REALIGNMENT OF CHOE BED TO STREAMLINE FLOW OF RAINWATER AND TO STRENGTHEN THE CHOE BANKS IN KHUDA ALI SHER BEAT, KANSAL BLOCK IN CHANDIGARH RANGE
restoration and re-alignment of Sukhna Choe Channel for regulation of flow of water and mitigation of bank erosion in Manimajra Beat, Manimajra Block, Nepli Range during 2026-27
Repair and maintenance of water coolers, water purifiers and other allied works in various Non Residential Buildings under mtc. booth Sector 23 Chandigarh Ch. to 2215 (NP) NRB
COMPREHENSIVE ANNUAL MAINTENANCE OF 2 NOS. 6 PASSENGER LIFTS AIRCON ELEVATOR STAFF LIFTS IN PUNJAB AND HARYANA VIDHAN SABHA BUILDING, SECTOR-1 AT CHANDIGARH (FOR THE YEAR 2026-27) (R/F FROM PUNJAB AND HARYANA VIDHAN SABHA).
ANNUAL MAINTENANCE OF 2 NOS. 8 PASSENGER LIFTS (AIRCON ELEVATOR) AT GATE NO.1 IN PUNJAB AND HARYANA HIGH COURT BUILDING, SECTOR-1 AT CHANDIGARH
Construction of New Govt. Building in Govt. Model Senior Secondary School, Village Maloya, Chandigarh (Composite Work)