Loading…
Loading…
921 results • Latest
Construction of Khutitoli Basti to Chetba High School Approach Road Length 2.00 Km. Distt. Jashpur (C.G.)
WMM Patch Repair in SH, MDR and Village Road under Division Manendragarh Distt MCB (C.G.)
Construction of Bagiya Main Road to Rout Toli Approach Road Length 1.20 (Actual 0.83) Km. Distt Jashpur (C.G.)
CONSTRUCTION OF BANDARCHUWAN TO GORIYA SARABKOMBO APPROACH ROAD LENGTH 11.425 K.M. DIST- JASHPUR
STRENGTHING WORK OF Kalyanpur-Latori-Datima-Salka road (MDR) in Dist. Surajpur (C.G.) from Km. 1 to 7, 10/2-4, 11 to 12/8, 13/4 to 13/10, 16/2-4, 17/6 to 20/4, 21/2-4-6, 23/8 to 30/4, 36 to 38, 40/10 to 41, 47 to 49 = 29.00 k.m. (Work code – W31654)
Strengthening of Chhal to Kharsia Road (SH 18) Km. 45/6 to 49/8 (100) Total Length 4.30 Km.