Loading…
Loading…
1,535 results • Latest
Removal and cleaning of loose and jammed coal lumps, fines etc spilled F/B and belt conveyor accumulated and around conveyor structure of F/B at Kessurgarh under ABOCP Mine of Block-II Area
Removal and cleaning of loose and jammed coal lums fines etc. 1.) Feeder Breaker No 1 (18mtr X 1.9 X 0.85mtr) + (18 X 1.85 X 0.84Mtr)= 57.04 M3 2.) Feeder Breaker No 2 (18mtr X 1.9 X 0.83mtr) + (18 X 1.85 X 0.70Mtr)= 51.69 M3
Repairing of 11KV Andrew Yule Make VCB Breaker Sr. No. 3848 along with cable work at Madhuban DG Substation under Block-II Area
Dismantling of 11Kv VCB from panel
Repairing of house wiring of Qtr no- B-179 and B-191 at Harina Township of Block-II Area
Wiring for light point/fan point/exhaust fan point/call bell point with 1.5sqmm FRLS PVC insulated copper conductor single core cable in surface/recessed medium class PVC conduit with piano type switch, phenol laminated sheet, suitable size M.S. box and earthing the point with 1.5 sqmm FRLS PVC insulated copper conductor single core cable as required. (Group A)
Complete repairing and Rewinding of 500KVA 11KV/440V Transformer installed at Sector-2, Dugdha Township under Block II Area
New electrolytic copper strip for primary side 03 limb X 70Kg = 210Kg
Electrical wiring of EDP including fitting of LED Tube light at Matigarh Dispensary under Block-Il Area
Wiring for light point/fan point/exhaust fan point/call bell point with 1.5sqmm FRLS PVC insulated copper conductor single core cable in surface/recessed medium class PVC conduit with piano type switch, phenolic laminated sheet, suitable size MS box and earthing the point win 15 sqmm FALS PVC insulated copper conductor single core cable as required (Group A)
Work at Diversion of 10in MS pipe two range at cast side face of BOCP patch under ABOCP Mine Block-II Area
Cutting of 10" dia MS pipe for fabrication of tapper (12 Nos × 31.42")