Loading…
Loading…
223 live123 closing this weekmost from Eastern Coalfields Limited and Coal India Limited
223 results • Latest
Extension/Diversion and Dismantling of Bhatmura Feeder- 1 near Sudama Shovel in the mines under Sonepur Bazari Project.
Tree Trimming around 11kV Area Feeder, R. N. Colony feeder, V. N. Colony and solar panels under S. B. Area.
Repairing and replacement of de-funct street light fittings of V. N. Colony, R. N. Colony, Area Office, RRRT Kenda and rehabs under S. B. Area.
Replacement of Damaged Tandem Cage at 5 No. Pit, Ningah Colliery under Satgram-Sripur Area
Repairing of Steam Winch Installed at Surface of Ningah Colliery for Restoration of Guide Rope Tensioning and Safe Shaft Operations Under Satgram-Sripur area
Lifting Survey off Eimco Elecon Make UDM machine Bearing No-611-104 from 12D/31WL to Surface at Chapuikhas Colliery at Satgram-Sripur Area
Withdrawal and Re-installation of VT Pump after Replacement of shaft n Necessary Repairing of Damaged Delivery Pipe at New Satgram Colliery (01 No. Pit) under Satgram Sripur Area
Requirement for execution of miscellaneous electrical safety and infrastructure improvement works at Benali Workshop under Satgram-Sripur Area
Repairing of cast iron pulley, fitting shaft and fabrication of tension screw for endless haulage of Jambad Colliery
Repairing of electric winding engine A pit coupling of drum shaft and pinion, making of new coupling key of Porascole East Colliery
Complete repairing of 120hp, 550V Pullen make submersible pump and motor set of Madhabpur Colliery
Procurement of Spares for CG Make HT Switches
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal mining area diesel Bowser and HeMMs, Service provider; Coal mining area diesel Bowser and HeMMs, Service provider; Service Provider
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service
Complete Repairing/rewinding of 02(Two) Nos. 100KVA, 6.6KV/440V oil cooled, 50Hz, 3phase lighting transformer running at Dahar Tola and Bhirinda under Rajmahal Project.
Renovation and Repair of workshop, stores and goods shed of Pit No 02 of Kunustoria Colliery under KNT Area.
Repairing/replacement of vaccum bottle, closing and tripping coil etc in 6.6KV HT breaker panel at 33KV/6.6KV DG sub-station of Rajmahal OCP.
Replacement/repair of damaged load cells and other equipments of 60 T Road Weighbridge at Narayankuri Highwall Project
Providing and fixing of 08 Nos. 800 Amp. MCCB, 440V, 4 Pole in LT Distribution Panel of NHS Type Single (Sidhu-Kanhu, Saand Mandir) and B Type Double (Harinchara) at Urjanagar Colony, Rajmahal Area.
Repairing/ replacement and overhauling of 02(Two) Nos. 1000Amp ACB (Air circuit breaker) panel for 630KVA and 315KVA transformer running at Daha Tola and Lalmatia Sub-station of Rajmahal Project.
Complete repairing of existing 01 No. 1000 Amp Outdoor Type LT / 440 V ACB Panel for Safety of NHS Type Double at Urjanagar Colony of Rajmahal Area.
Drivage of 03 (Three) nos. drift from S.P. Combine Seam to B.P. Seam (Virgin) under Kumardhubi Colliery. (3 nos drifts (Haulage 110 m, Travelling 94 m, ventilation purpose 80 m) from SP seam to BP Seam, Dimensions 4.5m x 3.0m)
Miscellaneous mechanical/electrical jobs to facilitate coal production and safety of Porascole East Colliery
HT cable jointing 08 nos in favour of Central Kajora Colliery
Supply Installation and Commissioning of Neutral Grounding Resistance NGR Monitoring System along with Winding Temperature and Oil Temperature Indicator Assembly for 01 No 1.2 MVA 6.6kV/3.3kV Transformer at PSLW Workshop Jhanjra Project Colliery
586.5 mtr i.e. 17 pillars (as pillar length center to center is 34.5 mtr.) shortening of 6.6KV/95Sq.mm cable, 550V/70sq.mm cable with salvaging these total cables to surface for depillaring of panel in R-VII seam in LHCM2 section at 3 and 4 Incline J
NEW INSTALLATION OF TWO-WAY SIGNALLING SYSTEM WITH DISPLAY OF MAN and MATERIAL WINDING FOR PIT NO 5 and PIT NO 6 OF MANDARBONI COLLIERY and PIT NO 2 OF SOUTH SAMLA COLLIERY UNDER PANDABESWAR AREA
Repairing/overhauling of 100HP/75kW,550V Prabhu make Star-Delta starter,12.5HP Kirloskar make 550V motor, 400A,550V and 100A,550V ABC make ACB, K.E. make 40HP 550V,3Ph,960RPM and CG make 12.5HP,550V,3 Ph,720RPM Mono Pump motor at Pandaveswar Colliery
Fabrication and erection of new tippler with chute and accessories at no. 2 pit of Khottadih Colliery
New Installation of 03Nos. of Electrical Substation in R-IV seam at Pit No-06 and at R-III/II Seam for Pit No- 02 of MSAM Colliery
Repairing of 140 nos. heavy duty 1200 mm pressure rollers of 1200 mm 2nd belt conveyor, MIC, JPC
Construction of EnM department office and store room in NSOCP under Kunustoria Area
Providing and fixing paver block in front of Community centre and marriage hall of Kunustoria Community centre and marriage hall of Kunustoria Colliery under Kunustoria Area
Construction of northern side of boundary wall with barbed wire fencing of Area Store of Kunustoria Area.
Repairing of 03-units NHS type, quarter No.-51/435, 51/438 and 45/376 at Hariajam Colony under KOCP Group of Mines.
Roof grading of 5 no. NHS Blocks (19,20,21,22,23), 4 no. A-Type Blocks (15,16,17,18), 1 no. B-Type Block no. 01, 1 no. C-Type Block no. 01, and repairing of 2 units C Eq. qtr. (25/01 and 25/02) at Adarsh Colony, Chapapur-II OCP under CB Group of mine
Construction of Peripherical Fencing around new coal depot using departmental recovered profile sheets at Chapapur-II Open Cast Project under CB Group, Mugma Area.
Color washing, painting and spreading stone dust and other miscellaneous work at Khoodia 03 NO. colony under LMG.
REPAIRING OF MISC DAMAGED STRUCTURES LIKE PLATFORM LADDER RAILING FINAL DRIVE COVER GUARD RADIATOR GUARD FRONT AND LOWER PARTS ENGINE BONNET AND BENT AND TWISTED FRAME OF REAR SIDE COUNTERWEIGHT CHASSIS AND BODY
Dismantling, loading, lowering, transporting, fitting and commissioning of Eimco make UDM 264 of Porascole East Colliery
Repairing of eccentric sheaves of steam winding engine of dimension of 22x44 of Jambad Colliery
Repairing of 02 nos of 36 drum pontoon and 08 nos 08 drum wing pontoon under Jambad OCP
REPAIRING OF CABIN DOORS REPLACEMENT OF BOTH THE CABIN DOOR GLASS FITTED WITH NEW ORIGINAL GLASSES BOTH GATE LOCKS IN BEML DOZER D155 SL NO 13494 AND 13572 DEPLOYED AT BARMURI OCP
Repairing of 04 nos. driving wheels, 04 nos. driving Shafts of EQC-5A Shovel.
Repairing of ROP cabin of Dozers Sl. No. 13571,13578 and 13726 working at Khottadih OCP of Pandaveswar Area.
Repairing of one Bucket as a float and repairing of swivel joint (float) for BE1000 Hydraulic Shovel G-10214.