Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.4 Cr
EMD Value
₹1.8 L
Closing Date
9 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Area Engineer Civil SBA Area
Office of the General Manager,Sonepur Bazari Area,P.O. Bahula
Renovation of road at entrance gate, attendance room and dozer section of Base Workshop under Sonepur Bazari Project.
2026_ECL_369335_1
GM/SBA/CE/e-Tender/26-27/32 Dated 21-11-2026
Open Tender
Civil Works - Roads
Percentage
120 days
Sonepur bazari Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.8 L
23 Nov 2026
23 Nov 2026
11 Dec 2026
23 Nov 2026
9 Dec 2026
24 Nov 2026
23 Nov 2026 - 2 Dec 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Compacting Original Ground: Compacting original ground supporting subgrade: Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction as per specifications of MORTH 2013. | 657 | cum | 45.3 | ₹29,762.1 |
| 1.02 | Granular Sub-Base with Graded Material (Table:- 400-1): Plant Mix Method: Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 - Grading IV as per specifications of MORTH 2013. | 328.5 | cum | 2,321.05 | ₹7,62,464.93 |
| 1.03 | Dry Lean Cement Concrete: Subbase Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per specifications of MORTH 2013 & IRC 58 2015. | 328.5 | cum | 3,721.6 | ₹12,22,545.6 |
| 1.04 | Cement Concrete Pavement: Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approved grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowelbar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per specifications of MORTH 2013 & IRC 58 2015. | 657 | cum | 6,472.8 | ₹42,52,629.6 |
| 1.05 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 547.5 | cum | 2,180.9 | ₹11,94,042.75 |
| 1.06 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 657 | cum | 128.35 | ₹84,325.95 |
| 1.07 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 45,345.47 | KG | 95.75 | ₹43,41,828.37 |
| 3 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.77 MB
BOQ_382387.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .