Loading…
Loading…
11,741 results • Latest
Restoration/ Repairing of 300 mm dia sewer line in khajoor ped wali gali no. 2 west Rohtash nagar in welcome ward no. 224 in AC-64 Rohtash nagar under EE ( C)-05
Repair and maintenance of sewer system in Ram Nagar, Mansarover Park and East Rohtash Nagar in ward No-223 in AC-64 under EE(C )-05
Replacement of old damaged water line in J Block, Rajouri Garden in Ward no. 96 of Rajouri Garden Constituency AC-27 under EE(C)-19.
Trapping of Subdrains at Jafrabad Metro station and Lakdi Market welcome by interconnecting flow in DJB sewerage system in Seelampur Constituency AC-65 under EE(Civil) -06.
AR and MO various roads under PWD Division South West Road-I during 2026-27. (SH Providing and laying DI pipeline at Prade Road Underpass and Dhaula Kuan Loop under Sub Division-II, New Delhi.
Supply of Flood Fighting Material in the Jurisdiction of Civil Division-XX
Development works in unauthorized colonies. C/o Approach Road and S.W drains at Harijan Basti, School Block, Shakurpur, Laxmi Nagar, AC-58 (Regn. No. 191).
Maintenance and Repair of District Court Complex, Saket, New Delhi during 2026-27 to 2028-29. (SH Cleaning of sewer line rain water line by super sucker, replacement of filter media, redevelopment of bore of RWH pit and construction MS covers ...
Hiring of sewage pump trolley of 50 HP capacity in AC 04
Repair rewinding of 20 HP 25 HP and 60 HP various make Induction motors at Adarsh Nagar AC04
NIT NO. 07/EE(R-III)/ 2026-27
De watering of sewage water by Installation of sewage pump trolley of 40 HP capacity in in AC 07 Bawanan
Installation of sewage pump trolley of 30 HP capacity in AC 05 Badli
Additional / Alteration of Air Conditioning System installed at Nav Kiran Building at Nav Kiran, Halfway/Longstay Home, Sector-03, Rohini, Delhi.
Renovation of lightening arrangement by Internal and External Electrification at ZRO office Narela in AC 01
De watering of sewage water by Installation of sewage pump trolley of 40 HP capacity in in AC 05 Badli
Construction of outfall drain from Ranhola Bus Stand Nangloi Najafgarh road to KSN Drain Near Nilothi STP
Hiring of sewage pump trolley of 40 HP capacity in AC 07
A/R and M/O to non residential building under West Electrical Division, PWD, Delhi. (SH- Electrical works for MLA office at Capt. Balbir Singh Marg, Paschim Vihar) (SHORT NOTICE)
Hiring of sewage pump trolley of 40 HP capacity in AC 04
Hiring of sewage pump trolley of 30 HP capacity for de-watering of sewage water in AC 05 Badli
A and A to GGSIP University, Dwarka Campus, New Delhi. Sub Head Construction of centralize monitoring room in GGSIPU Dwarka Campus
Hiring of Tractor with trolley for 20 and 40 MGD SPS Keshopur.(Re-Invited)
Raising and repairing by tracing by tracing out of buried manholes and cleaning of sewer line in F, E Block JJ Colony, Raghuvir Nagar and D, E Block, Tagore Garden Extension in Ward no. 96 Rajouri Garden AC-27 under EE(C)-19.
Providing and Fixing of LED Strip Lights for various Locations of PWD Roads under Shalimar Bagh Constituency.
Development of Multi Level Manufacturing Hub at Rani Khera Mundka. Rejuvenation of Water Body at Rani Khera, Mundka
Renovation and Upgradation works of damaged flats in type II and III quarters at DA Flats Timarpur, Delhi.
Disposal of silt from RD 6150m to RD 5300m R/B, RD 3505m to RD 2135 L/B, RD 2135m to RD 400m L/B of Ghazipur Drain for the year 2026
Supply and Filling of new EC Bags with earth at various location of River Yamuna.
Improvement of external surface including chajja repair and finishing work and essential upgradation work of DA Flats Timarpur complex Delhi
SH Replacement of Flooring, Wall tiles, Door Change Window Change in uPVC CP Sanitary GI CI Pipe lines and misc civil work.
Deployment of staff for Sadar Bazar Area under AC-19.
K-II HEAD DEPOSIT WORK. Sub Head- Restoration of footpaths and lanes under Dara Shikoh Road S/C cut made by electrical department NDMC for day to day maintenance activity
Repair and Maintenance of the Sewerage System in Ward No. 96 in Rajouri Garden under EE(C)-19.
Deployment of Unskilled Staff for EnM installation in Anand Parwat Area under AC-19.
Demolishing and Reconstruction of Community Centre at village Pooth Kalan in Bawana AC-07
Restoration of road cut by various civic agency on Timarpur Road, Munshi Ram Road, Outram Line, Bhamashah Road, Inderchand Shastri Marg, Tripolia Gate GT Road, Satyawati Nagar and Mall Road to Timarpur Road under PWD Division (C and ND)-R
Construction of tubewell in NDMC area during 2025-26.SH. Construction of 14 Nos. tubewells at various location of NDMC area for horticulture Purpose.
Providing and Laying of RCC Pipe along Sub Minor in Village Bakkarwala for Supplying of Irrigation water
Removal of contamination in E1 block Nand Nagri near house no. 375 in ward no. 220 Nand Nagri in Seemapuri Constituency under EE(C)-08.
Restoration of road cut by Delhi Jal Board at Rajpur Road from 31 No. Rajpur Road to 19 No. Rajpur Road under Sub Division-4 dg. 2026-27. (Balance Portion).
Repair and Renovation of Crech at First Floor of GST Building IP Estate New Delhi Balance Work
Repair and Maintenance of existing Water Supply System of Sadh Nagar Ward in Palam Consituency AC-37 Under EE(C)-26.
Deployment of staff for operation and maintenance of EnM equipments at SPS Sector-25 Rohini.
Deficiency charges for replacement of old, damaged and outlived sewer network in KP Block Community Centre, Pitampura Ward No. 57, Shalimar Bagh AC-14 under EE(C )-17/SE(C )-07.
Repairing and Raising of damaged sewer manholes in Pocket F GTB Enclave from house no. 1 to 320 in ward no. 219 Seemapuri Constituency AC-63 under EE(C )-08
Deployment of labour for EnM installation at BPS and OLB in AC-03.
Running maintenance operation and day to day miscellaneous electrical work at DDE Office 1411008 Pitampura, Block FU SV.
As per Tender document
Deployment of labour for various sites under AE-II.