Loading…
Loading…
11,743 results • Latest
Repair and renovation work in outer area and rooms of Govt. Building at C 2/5, Safdarjung Development Area, New Delhi
Improvement of streets and side drain at E-Block Part-I Qutub vihar Phase- II in Matiala Assembly constituency AC-34(Regd No. 601)
RMO of EPABX and telephone wiring system installed in the Main Court Building at District Court Complex, Saket, New Delhi 110017 (SH Annual Comprehensive Maintenance of EPABX system ALCATEL Omni PCX Enterprises).
Improvement of streets and side drain at Improvement of streets and side drain at D Block Part-II Qutub vihar Phase-II in Matiala Assembly constituency AC-34
Maintenance to various roads under PWD Division East Roads during 2026-27. (SH- Desilting of drain at Disused canal road under Sub-Division East Road-I).
RMO of E and M Service installed at 100 bedded LBS Hospital Khichripur Delhi SH SITC of various ceiling duct mounted Air Decontamination system at LBSH
Improvement of streets and side drain at E-Block Part-II Qutub vihar phase- II in Matiala Assembly Constituency, AC-34 (Regd No. 601)
RMO of various E and M Services at Lal Bahadur Shastri Hospital Khichripur Delhi 91 SH Energy Audit of LBS Hospital Khichripur Delhi
RMO Specialized Electrical and Mechanical Service of Tis Hazari Court, Complex, Delhi. (SH Annual Comprehensive Maintenance of Bosch Make CCTV System Installed at Extension Block Tis Hazari Court Complex.)
Improvement of streets and side drain at D Block Part-I Qutub vihar Phase-II in Matiala Assembly constitu ency AC-34
EOR to GGSSS, Panama Building Jama Masjid School ID 2127023 SH Renovation repair of toilet on all floors repairs of Beams and columns and finishing other miscellaneous Civil Works
MOEI and fans i c compound lighting for Kalyanvas Delhi. (SHReplacement of rusted damage G.I. Pipe and Electrical work.)
MOEI and fans ic compound lighting for DA Staff Quarters at Mayur Vihar Ph-2, under M-253, Delhi. Installation of survilence system in DA Staff Quarters
Construction of C.C Roads and RCC side Drain at Harsh Vihar Part-2 (C-2 Block) (Regn. No. 1117) (Part-B) Unauthorized Colony in Gokalpur Constituency (AC-68), including maintenance for the 5 Years for the year 2026-27.
Repair of Red Stones fixed on the outer facade of the school building or removal of red stones from the outer facade with texture paint in G Co Ed SSS School Id 1821237 Sector 3 Site-II Dwark, New Delhi
Construction of C.C Roads and RCC side Drain at Harsh Vihar Part-3 (C-1 Block) (Regn. No. 1117) Unauthorized Colony in Gokalpur Constituency (AC-68), including maintenance for the 5 Years for the year 2026-27.
ENGAGEMENT OF 10 Nos S.G. BELDARS FOR SEWER MAINTENANCE IN JANAK PURI CONSTITUENCY (AC-30) UNDER EE(C)-24.
Hiring of additional 2 nos Sewer Manhole Desilting machine mounted on Three Wheeler ( Desiltor) for maintenance of sewerage system for Janakpuri constituency AC 30 Janak Puri under EE(C)-24.
Repair work on the roof of ward block and OT at GNEC Hospital Revised.
Repair and Maintenance of Infrastructure Assets in R-IV Division during 2026-27. Sub Head - Hiring of two water jet spray machines for deep cleaning of footpath and roads under Dara shikoh road S/c, Sub Division-II (R-IV).
Restoration of deep settled sewer line of 450mm dia at Santo ka gurudwara and 300 mm dia Sewer line at VB 157 gali no 6-7 Virender Nagar in ward no 104, Janakpuri south AC-30 Janakpuri under EE(C )-24.
Improvement of water supply by P/L/J 110 mm HDPE waterline from B block Sitapuri service road to 40 foota road in Mahavir Enclave ward (105) under EE (C)-24.
Replacement of old/damaged water line by P/L/J HDPE water Pipe 110 mm Dia and 160 mm dia in C Block Mahindra Park and Gali no 32 E Block Chanakya place part 1 in Ward No. 105 Mahavir Enclave in Janakpuri Constituency AC-30 under EE (C)-24.
Construction of C.C Roads and Side Drains at Harsh Vihar (Regd. No. 1117) Part-3, D-1 Block Unauthorised Colony in Gokalpur Constituency (AC-68) including Maintenance for the 5 Years for the year 2026-27.
Construction of C.C Roads and Side Drains at Harsh Vihar (Regd. No. 1117) Part-2, D-1 Block (Part-B) Unauthorized Colony in Gokalpur Constituency (AC-68) including Maintenance for the 5 Years for the year 2026-27.
Construction of RCC Drain and Road of Ram Mohalla (Regn. No. 19 LOP) Unauthorized Colony in Gokalpur Constituency (AC-68) including Maintenance for the 5 Years for the year 2026-27.
Construction of C.C Roads and Side Drains at Harsh Vihar (Regd. No. 1117) Part-1, D-1 Block (Part-B) Unauthorized Colony in Gokalpur Constituency (AC-68) including Maintenance for the 5 Years for the year 2026-27.
Construction of C.C Roads and Side Drains at Bank Colony (Regd. No. 581) Unauthorized Colony in Gokalpur Constituency (AC-68) including Maintenance for the 5 Years for the year 2026-27.
Construction of C.C Roads and Side Drain at D-Block Harsh Vihar (Regn. No. 248) Unauthorized Colony in Gokalpur Constituency (AC-68), including maintenance for the 5 Years for the year 2026-27.
Construction of C.C Roads and Side Drains at Harsh Vihar (Regd. No. 1117) Part-1, D-1 Block (Part-A) Unauthorised Colony in Gokalpur Constituency (AC-68) including Maintenance for the 5 Years for the year 2026-27.
Construction of C.C Roads and RCC side Drain at Harsh Vihar Part-3 (B-2 Block) (Regn. No. 1117) Unauthorized Colony in Gokalpur Constituency (AC-68), including maintenance for the 5 Years for the year 2026-27.
Construction of Approach Road and RCC Drain from Bank Colony (Regn. No. 581) to Harsh Vihar (Regn. No. 1117) Unauthorized Colony in Gokalpur Constituency (AC-68) including Maintenance for the 5 Years for the year 2026-27.
Construction of C.C Roads and RCC side Drain at Harsh Vihar Part-2 C-2 Block (Regn. No. 1117) (Part-A) Unauthorized Colony in Gokalpur Constituency (AC-68), including maintenance for the 5 Years for the year 2026-27.
Construction of C.C Roads and Side Drains at Harsh Vihar (Regd. No. 1117) Part-2 D-1 Block (Part-A) Unauthorised Colony in Gokalpur Constituency (AC-68) including Maintenance for the 5 Years for the year 2026-27.
(SH- Comprehensive Maintenance of Microprocessor Based Control Panel, Online Monitoring, Wireless Connectivity with SCADA LED Display installed at Badarpur and Sarai Kale Khan Pump House.)
Replacement of old water line for improvement of water supply in Jaitpur village under Badarpur constituency AC-53 under EE (C )-31
RMO of various E and M Services at 100 bedded LBS Hospital Khichripur Delhi SH Supplying and replacement of faulty Fire Fighting Fire Alarm and PA System item at LBSH
Hiring of Jetting Cum Suction Machine of 4000 Ltr. Capacity hydraulic opereated with 02 Nos. helpers for maintenance of sewerage system for Matiala ward in Matiala constituency AC-34, under EE(C)-26
Hiring of vehicle mounted jetting cum suction Machine(8000ltr) along with 02 nos labours for operation and maintenance of sewerage system in Matiala constituency under EE(C)-26.
Engaging additional 10 Nos of unskilled beldars on contract basis for maintenance of sewerage system in Matiala constituency under EE(C )-26.(Re-invite)-I
RMO of 100 bedded LBS Hospital Khichripur Delhi SH SITC of Automatic strontium nitrate bases fire protection System for AC Plant Room and Electrical Sub Station at LBS Hospital
Engagement of labour for sluice valve operation and maintenance of water supply network in Deoli Constituency (AC-47) under EE(C )-30.
Supplying, Installation, Testing and Commissioning of Audio Video System for Training Center at DPMU, South situated on the 3rd Floor of AyAM Building, PVR Saket Complex, New Delhi
A R and M O to N R Building GTB Hospital Delhi dg 2026 27 SH Laying new Water Pipeline from Ward Block terrace to connect water supply to UCMS and Library Block GTB Hospital Shahdara Delhi
Hiring of 2 nos sewer manhole desilting machine mounted on Three-wheeler with operator and 01 no helper for operation including the cost of CNG for maintenance of sewerage system in Chandni Mahal and Delhi Gate (Part) ward in Matia Mahal Consti......
Addition / Alteration to Indira Gandhi Hospital during financial year 2026-27 at Dwarka, Sector 9, New Delhi (SH SITC of Electric Vehicle Charging Stations at Indira Gandhi Hospital, Sector 9, Dwarka, New Delhi)
Hiring of 2 nos sewer manhole desilting machine mounted on Three-wheeler with operator and 01 no helper for operation including the cost of CNG for maintenance of sewerage system in Bazaar Sita Ram and Delhi Gate (Part) ward in Matia Mahal ..........
AR and MO Delhi Secretariat at IG Stadium Complex New Delhi during 2026 27 SH Repair and Renovation of Horticulture DD s Office Complex Extension of Washroom Construction of Additional Washroom and other Miscellaneous Works
Hiring of 01 Auto desilter machine mounted on Three-wheeler for maintenance of sewerage system in ward no. 94 Raghubir Nagar in AC 26 Madipur under EE(C)-19.
Hiring of 01 Auto desilter machine mounted on Three-wheeler for maintenance of sewerage system in ward no. 93 Madipur in AC 26 Madipur under EE(C)-19.