Loading…
Loading…
11,716 results • Latest
Providing and fixing of EOT crane at 976 SFS flats Mayur Vihar Phase-III BPS.
Repair of electrical system by replacement of oil immersed starter and other allied work at Jagatram park SPS.
Repairing of Advance make Starters installed at 23Block Trilokpuri BPS.
SITC of Chemical Dosing Pump at 8A Block BPS under AC-55.
Repairing of Milton Roy Make Chemical dosing pump Installed at Vishwakarma Park BPS.
RMO of Electrical and Mechanical Works Services at GPO Building Vikas Bhawan-II, Delhi.
Replacement of old/damaged water line in D-1/1 to D-1/21 and D-1/1 to D-13 in ward no. 96 of Rajouri Garden AC-27 under EE(C )-19.
Replacement of old damaged/outlived and Undersize sewer lines by SN8 sewer line in various locations of B-Block, DDA Colony Chaukhandi Nagar ward no. 97 in Rajouri Garden Constituency under EE(C )-19.
Comprehensive maintenance of various roads under the jurisdiction PWD Division SER-2/25 during 2026-27 (SH-Repair of dumping yard boundary wall and store near Sub Division Office and improvement of central verge from Fortview Apartment to Crown......
Replacement of old damaged/outlived and Undersize sewer lines by SN8 sewer line in different locations of A-Block Shyam Nagar in Chaukhandi Nagar ward no. 97 in Rajouri Garden Constituency under EE(C)-19.
Repairing / Renovation of Rotork Make Actuators with allied works installed at Filter House (North and South) at HPWW-II (Re-invite)
A/R and M/O various road under PWD Division South East Road-2 during 2026-27 (SH-C.C. Pavement from Toll Booth to Dharam Kanta on Suraj Kund Road under jurisdiction of Sub Division SER-24)
Replacement of old damaged/outlived and Undersize sewer lines by SN8 sewer line in 80 Gaz Tilak Nagar in Chaukhandi Nagar ward no. 97 in Rajouri Garden Constituency under EE(C)-19.
Replacement of old damaged/outlived and Undersize sewer lines by SN8 sewer line in various lanes of Choukhandi Village ward no. 97 Chaukhandi nagar in Rajouri Garden Constituency under EE(C )-19.
A/R and M/O Roads under PWD North Roads Division, Delhi during 2026-27 (SH- Providing services of Computer Operators, MTS, LMV Drivers etc. in various offices of PWD, GNCT of Delhi)
ITC of 2 nos. sewage submersible pump along with allied works in the wet sump of Punjabi Bagh SPS
Replacement of old damaged/corroded CI/AC main water line by DI water line in Chaukhandi village DDA colony Ward No.97, Chaukhandi Nagar Rajouri Garden AC-27 under EE (C)-19.
Comprehensive maintenance of various roads under SER-2/21 during 2026-27 (SH-Repair and maintenance of Foot Over Bridges (FOB) situated on Outer Ring Road from Modi Mill flyover to Bhairav Mandir under jurisdiction of PWD Sub Division South East ....
A/R and M/O Roads under North Roads Division, PWD, Delhi during 2026-27 (SH- Conducting Survey with DGPS / Total Station to mark unauthorised encroachment on Badli - Bawana road from (DTU main gate to Auchandi Border) under Sub Division NR-15)
MOEI and fans including compound light CCTV system and Fire Alarm
1 MOEI and Fans including RMO Pump Set, DG Set and other maintenance work in DM Office, Rampura and attached VREC Centers Rani Bagh, Shalimar Bagh, Wazirpur and Tri Nagar, DDE Offices Shalimar Bagh, Pitampura, Mangolpuri
Comprehensive maintenance and repair to various roads under PWD Division SER-2/21 during 2026-27 (SH- Repair and maintenance of central verge on Outer Ring Road under jurisdiction of Sub Division SER-2/21)
Improvement of water supply system by replacement of existing HDPE water line of dia 355/280/225 mm by DI water line of dia 300/250/200mm for Shiv Vihar on Karala Kanjhawala road in Mundka Constituency AC-08 under EE(C)-035.
Construction of Boundary Wall at Khatu Shyam Park Badarpur Assembly Constituency-53 (MLA LAD FUNDS)
Supply Installation of FRP Jaal on wet sump at Rohini Sector 23 SPS
Supply installation of FRP jaal on wet sump of Rohini Sector 25 SPS
Beautification of 02 Nos. Parks at Jaitpur Park No. 5 and 6 in Badarpur Constituency AC-53
Repair and Maintenance of water supply by of old/deep/damaged water line in G block Hno-642 to 702 Wali gali in sakurpur , Ward No. 62 Tri nagar constituency AC-16 under EE(C)-17/SE(C)-7
AR and MO Building in BM III Division During 2026 27 SH Repair and maintenance of motor pumps allied electrical items supply of new pump etc under Golf Link Service Centre
Shifting and laying sewer line at D-II 233 to 244 back lane towards Madhu Limaye Marg Chanakyapuri
As per NIT
As per NIT
E-tender for Pacemakers, Implantable Defibrillators, and other Cardiac Implantable Electronic Devices for Cardiology Department, GIPMER-2025-2027
Comprehensive maintenance of various roads under Division South East Road-2 during 2026-27 (SH-Providing Additional Dewatering pumping Arrangements for miscellaneous locations under Sub Division SER-2/24).
Construction of Minor Bridge/Culvert on Hospital Road under Division South East Road-1, Sub-Division SER-14
Providing and laying pipeline from Gali No. 5 Ismilpur road to transformer Tanki road in Badarpur AC-53. (MLA LAD Funds).
Deployment of staff for day-to-day operation and minor maintenance at command Tank-6 in Dwarka Sub-city under AC-36
Maintaining Water supply by deployment of staff for operation of Navjeevan Appts., Pragati Kunj Appts., Samarpan Kunj Appts., Capital Appts. and Pink Appts. BPS in Nasirpur area in Dwarka AC-33.
AR and MO various roads under PWD South West Road-I, during- 2026-27. (SH Improvement of T- Junction at Church Red Light on Mehrauli Mahipalpur Road under Sub Division-V, SWR-1, New Delhi).
Supply of submersible pump sets of different capacity for Bijwasan Store under AC-36.
S/I/T/C of 30 HP Split casing pump set No.1 and 2 with allied works at sector 12 pkt 1 under CT-3 in Dwarka subcity under AC-34
Running operation and comprehensive maintenance of online UPS, TVSS, CVCF, APFF, PAC and Isolation transformer of different capacity installed at RGSS Hospital, Tahirpur, Delhi for the year 2026-28.
SITC of newly bore at Dwarka Sector 11 SPS-II Under AC-34
SITC of newly Re-bore of tubewell at Raghopur Village under AC-34
A/R and M/O to various roads under Sub Division - IV of Division South Road-II, PWD during 2026-27. (SH_ Providing and Fixing Missing Railing, IRC Jali and Polycarbonate Sheet under jurisdiction of Sub Division-IV).
SITC of newly Re-bore of tubewell at Sarangpur Village under AC-34
SITC of newly bore of tubewell at Chawla Village under AC-34
Filling up of potholes and repairing of damaged patches by laying RMC on inspection road at left bank of Najafgarh drain from RD 11960m (Jhatikra Bridge) to RD 17905 (Chhawla Bridge) and both banks from RD 17905m (Chhawla Bridge) to RD 20180
SITC of newly bore of tubewell at Jhatikra Village Under AC-34
Repair and Restoration of boundary wall on left side of Escape Drain No. I from RD980m to RD 1900m in District North-East.