Loading…
Loading…
Found 2,512 active tenders
2,512 results • Latest
Providing and placing PP rope gabions and Tetrapod from RD 400.0 M to RD 530.0 M (EL1155.0 to EL1164.00) at CPS-II Dam site
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Hiring of sewerman for day to day maintenance of sewerlines at CSWT BSF Indore
Engaging sewerman daily along with tools for 8 hrs/day for de-chowking of existing sewerline and cleaning / desilting of manholes & gully trap chamber of any size in the campus to ensure proper flow of sewage to the sewerage sump in the campus as per direction of Engineer-In-Charge. (Payment will be made on daily attendance basis)
Catering food to approx 1000 persons in round the clock and general shifts for 7 days a week in HWPM Departmental Canteen I and II.
Cooking activities like preparation of Tea/Coffee, Breakfast, Lunch & Dinner including snacks items etc. during Round-the-clock shift.
Improvement of FIDAR control room in ADM block at BOP Chhawani of 120 Bn BSF under SHQ Jammu SH Providing electrical installation Fans Air conditioners and service connection
Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable etc. as required. (Group A)
Upgradation of Gas Agency office room for installation of X-Ray machine at SHQ BSF BHP.
Civil work componenet (Schedule as per NIT Page no 96 to 97)
Repair and renovation of Portable cabins at IIT Goa
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m i) Hard rock (blasting prohibited)