Loading…
Loading…
2,544 results • Latest
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 Lada to Bameng 0.000 to 43.65 43.65 km on EPC mode
Authority Engineer for supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 from km 55.725 to 113.25 57.525 km on EPC mode
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 Khenewa to Koloriang 85.60 to 168.00 km 82.400 km on EPC mode
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 Bameng Khenewa 43.65 to 85.60 41.950 km on EPC mode
Authority Engineer for supervision of Construction of road from Taliha to Tato section of Frontier Highway NH 913 km 87.13 to 121.541 34.411km on EPC mode
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 koloriang to Sarli km 168.0 to 183.40 15.40 km and Sarli to Huri km 0.00 to 78.38 78.38km on EPC mode
Rehabilitation Upgradation of Four Lane road with Paved Shoulders in Hingoli Town section of NH 461B from Narsi Phata to Junction with NH 161 at Sawarkheda with Major Bridge across Kayadhu river and additional 2 lane ROB at LC No.144(B) (From KM. 94.
Design, Manufacture, Supply, Testing, and Commissioning of 90 No. of Standard Gauge Cars for Inderlok-Indraprastha Corridor (Line-8 Extension) of DMRC including Training of Employers Manpower and 35 years CAMC for these 90 No. Standard Gauge Cars.
Widening and strengthening of Garra (near Balaghat)- Waraseoni- MP/MH border section of NH-543K Km 0/000 to Km 51/000 to 2L/2LPS/4L with paved shoulder in the State of Madhya Pradesh on EPC mode
Dredging and Reclamation work for establishment of an Industrial Estate at Paradip, Odisha, India
Upgradation to Two lane with paved shoulder of Porbandar Bhanvad Jamjodhpur Kalavad section of NH-151K from Design km 0.000 to Design km 119.500 in the State of Gujarat on HAM.
Recontruction of Minor Bridges in km 97/540 and Ch 106/600 at Abdimandi and Kagzipura respectively near Samruddhi Mahamarg on Daulatabad T point to Khultabad Road NH 752H Taluka Khultabad Dist.Chh.Sambhajinagar.
Construction of Bypass Road to Phulbani town from km. 29.800 (Design ch. 0.0) to km 38.500 (Design ch. 6.750) of NH-157 in the state of Odisha on EPC Mode
Development,Maintenance,Management and Operation of Greenfield HSC from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam by 4-Laning with Paved Shoulders on HAM. (Pkg-4 From Km 133.32 to Km 164.35,Design Length -31.035km
Consultancy Services for Carrying out a Detailed Project Report (DPR) study for the Development of the International Convention Centre and supporting Commercial area on the lands of MbPA, Mumbai.
Design, Manufacture, Supply, Testing, and Commissioning of 68 No. of Broad Gauge Cars for Rithala- Narela-Nathupur Corridor (Line-1 Extension) of DMRC including Training of Employers Manpower and CAMC for these 68 No. Broad Gauge Cars.
Consultancy Services for Preparation of feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulder on NH 169A from Km. 30.75 to Km. 51.60 Agumbe Ghat in the State of Karnataka
Diversion Tunnel Construction Adit including DT and Coffer Dams, Mandiyal Nalla DT, Coffer Dykes and Platform, LCAT, Roads and Associated Works, Right Bank Spiral Tunnel, Access Tunnels, Dam works with associated HM works for Sawalkot HEP, UT of JK
Request for Proposal (RFP) for Concessioning of Berth No. 13 for Handling Liquid Bulk/LPG/Chemicals/POL Products on Captive Basis at New Mangalore Port
Widening and upgradation of Sirmour (Keoti) to Kalwari section of NH-135BD from Ch 10/070 to 35/920 (length 25.85 km) to 2-Lane with paved shoulder configuration in the State of Madhya Pradesh
Widening Re-Construction to Four Lane from Km 0.000 to Km 15.870 Near Miriyan Telangana Karnataka Border Chincholi Section of NH 167N in Kalaburagi District in the State of Karnataka on HAM under Annual Plan 2023 24
Construction of Bypass to the Holenarasipura Town from Km 87.280 near Chikknahalli to Km 97.580 Near Hullahalli on NH 373 in the State of Karnataka on EPC mode under NH O Annual Plan 2023 24
Engagement of Department of Economic Affairs empanelled Transaction Advisor for Feasibility Assessment and Opportunity Identification for Public Private Partnership (PPP) in Navodaya Vidyalaya Infrastructure
Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across Krishna River on NH -167K (Design Chainage km 87.360 to km 88.437) in the States of Telangana and Andhra Pradesh on Engineering, Procurement and Construction (EPC) Basis
RFP for the work of Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.
Construction of 2 Lane Bridge at Km 21.206 and Km 26.983 at Bargarh District on NH-26 in the State of Odisha under EPC Mode
DESIGN MANUFACTURE SUPPLY TESTING COMMISSIONING OF STANDARD GAUGE METRO ROLLING STOCK (ELECTRICAL MULTIPLE UNITS) AND DEPOT MACHINERY and PLANT AND TRAINING OF PERSONNEL
Widening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (Koksara) to km 294.280 (Nabarangpur) on NH-26 in Kalahandi and Nabarangpur districts in the state of Odisha under the EPC mode
up gradation to Two/four lane with paved shoulder configuration of Tuljapur Naldurge Akkalkot road from Naldurge to Akkalkot of bvalance work from Ch 30.884 and ch. 70.800 of Nh 652 on EPC mode in the state of MAharashtra
Rehabilitation and upgradation of NH 548B from km 289.300 to km 342.890 Maharashtra Karnataka Border to two lane with paved shoulder configuration in the state of Maharashtra on EPC mode Total length 52.556 km
Repairs and Construction of PQC Road Damaged portion 14.1 Km from the work of Karnataka Maharashtra Border Km 70.682 to Akkalkot Km 106.526 and Strengthening of Dudhani Km 74.240 to 77.420 Maindargi Km 89.084 to 92.045 and Akkalkote Km 99.580 to
Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka
Upgradation to 2 Lane with Paved Shoulders from Design km 0.000 to km 48.742 and km 61.732 to km 102.284 of Bagasara-Una Section of NH-351K in the State of Gujarat on Hybrid Annuity Mode
Supply of Arthroscopy Systems with or without instruments/Accessories
Balance work under Risk and Cost for Up gradation of Paithan Pategaon Mungi Hatgaon Bodhegaon Ladjalgaon Ghogaspargaon Phulsangvi Ukhandachakla Dahiwandi Shirur to 2 lane with paved Shoulder 4 lane Configuration Package 55 937 Km for
REQUEST FOR PROPOSAL for Engagement of DEA Empaneled Transaction Advisor for providing Transaction Advisory Services for Repurposing of Rajghat Power Plant as a one-stop entertainment destination in Delhi on PPP mode
Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to 2-LPS in the State of Madhya Pradesh on EPC Mode
abilitation Upgradation and Widening of Akola to Mahan section from km 35.265 to km 64.574 (Length 29.309 km) including construction of 4 lane with paved shoulder configuration of Barshi Takli Bypass (Length 3.160 km) on NH161A the State of Maharas
Upgradation of Existing Intermediate Lane Flexible Pavement to 2 Lane with Paved Shoulders Flexible Pavement from Km 0.000 (Orchha) To Km 75.000 (Length 75.000 Km) on Orchha Tikamgarh Shahgarh NH-539 in the State of Madhya Pradesh on EPC Mode
Expression of Interest (EOI) for Enlistment of Architects for Infrastructure Projects
Widening and strengthening of Daringbadi ghat portion from km 231.000 to 256.000 (Design chainage from km 229.500 to 256.468) of NH-59 under NH(O) in Hybrid Annuity Mode Plan 2023-24 in the State of Odisha (Design length 26.968 Kms).
Rehabilitation and Upgradation of Nehru Nagar to Kothagudem Section to Two Lane Four Lane with Paved Shoulders from Km 178.500 to Km 230.580 of NH 930P in the State of Telangana on EPC Basis
Rehabilitation and Upgradation to 2 4 lane with paved shoulders from Km 79.300 to Km 87.360 and Km 88.437 to Km 93.819 of NH 167K Bridge Approaches of Iconic Bridge across river Krishna in the State of Telangana and Andhra Pradesh on EPC Basis.
Construction of Four Lane with paved shoulder of Bhagalpur Kharhara Village (Dhaka More) from Km 0.000 to KM 36.600 (Total length 36.600 Km) of NH-133E in the State of Bihar on EPC mode