Loading…
Loading…
2,544 results • Latest
Re Processing and Interpretation of Legacy 2D and 3D Seismic Data and 3D Broadband Seismic API for Cauvery Basin
SP/B957-302-PA-MR-5370/171 PUMP-CENT.HOR(SPP), PUMP-CENT.VERT.(SPP) FOR BPREP OF BINA REFINERY OF M/S BPCL
Construction of Uni-Directional twin tunnels including approach roads across Fotu La Pass on NH-01 (Leh-Kargil Highway) in the Union Territory of Ladakh
Re Processing and Interpretation of Legacy 2D and 3D Seismic Data and 3D Broadband Seismic API for KG Basin
Viscoelastic Global Coagulation Testing Device (1-Unit) for JPNATC, AIIMS
CONSTRUCTION OF PRESS MUD BASED CBG PLANT ON LSTK AT KOLAPUR
SUPPLY OF CONTRACT LABOURS FOR PERFORMING MISCELLANEOUS WORKS AT DIFFERENT LOCATIONS UNDER MARINE OPERATIONS DEPARTMENT, HALDIA DOCK COMPLEX, SMP-KOLKATA.
Consultancy Services for Carrying out a Detailed Project Report DPR study for the Development of the International Convention Centre and supporting Commercial area on the lands of MbPA, Mumbai
MOUNDED STORAGE BULLTES (SITE FABRICATED) FOR POLYPROPYLENE PROJECT OF M/S NUMALIGARH REFINERY LIMITED
Lot-III Electro-mechanical works package of 240 MW (2X120MW) Uri-I Stage-II H.E Project, Baramulla District of UT of J and K
Construction of Civil works of Barrage and Stilling basin, U/s Plastic cutoff trench, Power Intake Structures, Tunnel, outfall Structure, associated HM works including adit plug, etc and associated works of Link-3 Project in Himachal Pradesh
Lot-2a Electro-mechanical works (Except GSU Transformer, GIS, XLPE Cable and Switchyard Equipment) of 260 MW (2X130MW) Dulhasti Stage-II H.E Project, Kishtwar District of UT of J and K, India
SUPPLY OF CONTRACT LABOURS FOR PERFORMING MISCELLANEOUS WORKS AT DIFFERENT LOCATIONS UNDER FINANCE DEPARTMENT, HALDIA DOCK COMPLEX, SMP-KOLKATA.
LOT-1- Construction of Diversion Tunnels, Cofferdams, Main Dam including HM Works of Diversion Tunnels, approach roads and Bridges of Kamala H.E. Project (1720MW), Kamle district, Arunachal Pradesh
RR work on NH 208 from km 36 to km 72 at various locations of existing road of Rangamati to Patichhari road section Pkg III at risk and cost of EPC Contractor in Tripura in FY 2026 27 on item rate and work order basis
Balance work under Risk and Cost for Construction and upgradation of Existing Road to 2- Lane with Paved Shoulders including geometric improvement of section from start of Bagrakot to Kafer km 13.00 to km 25.600 (Package- IVB) of NH-717A in W.B
Balance work under Risk and Cost for Construction and Upgradation of Existing Road to 2- Lane with Paved shoulders including geometric improvement of section from Kafer to Lava more km 40.00 to km 61.100 of NH-717A in the state of West Bengal
Construction of a New Diversion-cum- Sediment Bypass Tunnel for Restoration of Concrete Dam Construction Sluices and Sediment Management of Salal Reservoir
Special repair work for sinking zone of NH 102 Imphal Moreh section from Km 420.858 to Km 421.430 Chikim Village Total Length 572m in the State of Manipur on Percentage Rate and work Order Basis under STMC
2D Broadband Seismic and Gravity Magnetic Data Acquisition Processing and Interpretation in Andaman (East) Basin
2D Broadband Seismic and Gravity Magnetic Data Acquisition, Processing and Interpretation in Cauvery Basin of East Coast of India
2D Broadband Seismic and Gravity Magnetic Data Acquisition, Processing and Interpretation in Krishna Godavari Basin of East Coast of India
2D Broadband Seismic and Gravity Magnetic data API in Bengal Purnea and Mahanadi Basin of East Coast of India
Upgradation to 2 Lane with Paved Shoulders of Naliya Narayan Sarovar section from design km 220.773 to km 288.987 of NH 41 in the state of Gujarat on EPC mode.
Upgradation to 4 Lane with Paved Shoulders with Divided Carriageway from Design km 0.000 to km 37.087 of Pardi NH 48 Junction Sukesh Nanapondha Kaprada section of NH 848 in the state of Gujarat on Hybrid Annuity Mode.
Upgradation of Chitrod-Rapar-Balasar section of NH-927C to two-lane with paved shoulders from design km 0.00 to km 57.848 in the State of Gujarat on EPC mode.
EXPRESSION OF INTEREST FOR ENLISTMENT OF CONTRACTORS FOR LGSF TYPE BUILDINGS
Construction of new Major H.L. bridge utei at km. 87.900 on NH 59 in the state of Odisha on EPC mode
GRANT OF LICENSE FOR OPERATION AND MAINTENANCE OF BERTH NO. 1 FOR INTEGRATED HANDLING OF DRY BULK CARGO AT HALDIA DOCK COMPLEX, SMPK AT O and M ROYALTY BASED MODEL (NON-PPP)
Construction of Proposed HL Bridge over Local Nallah at Ch 96.400 Km over Gadgadi River at Ch. 105.550 Km and Widening and Strengthening from Ch 91.720 to 91.920 Km on NH-153 (B) in the State of Odisha on EPC Mode
Construction of H.L. Major Bridge across River Songarh at Km. 97.958 and Minor Bridge at Singkhaman Km. 87.790 on Balangir-Bhawanipatana Road (NH-26) in the State of Odisha on EPC mode
Cartg. SA 7.62X39 MM Ball for AK-47 Rifle, Qty-6,81,203 Rds.
Consultancy Services for AE for Supervision of Construction of a Sixlane external port connectivity road from the junction of NH65 and NH216 to Machilipatnam Port via Machilipatnam bypass section of NH216 in the state of Andhra Pradesh
Construction of Road Protection measures from km.110-000 to km.176-000 (Section between Mokhada to Jawhar) on NH-160A in the State of Maharashtra. on EPC mode.
CONSTRUCTION OF NEW MAJOR H.L. BRIDGE LANTH-I AT CH 113/960 Km AND LANTH -II AT CH 114/446 Km OF NH 26 IN THE STATE OF ODISHA IN EPC MODE
SPN/B957-300-GN-MR-4020/151 FILTER-CARTRIDGE/CANDLE FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)
Landslide treatment work from Ch. 269.900 km to Ch. 270.214 km (Crown portion at Totaghati) on NH-07 (old NH-58) in the State of Uttarakhand under Annual Plan 2025-26 - under EPC mode
Strengthening of Medpalli to Laheri section from Km 18.600 to Km 82.00 Excluding Major and Minor Bridges Of NH130D in the State of Maharashtra On EPC Mode Total Length 63.40 Km
Fully Automatic Urine Chemistry and Sediment Analyzer
Suppl of Ultrafast Tissue Processor
One Time Improvement Work of Shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on Katni Shahdol road Section of NH-43 in the State of Madhya Pradesh.
Treatment of 16 no of landslide location on NH-134 under EPC mode in the state of Uttarakhand under Annual Plan 2025-26
Construction of a new 2LPS ROB alongside the existing 2 lane ROB at km 128.400 including construction of a Vehicular Underpass at km 129/200 and flyover at km 130.220 on NH61 in the State of Maharashtra on EPC mode
Treatment of 11 No. of landslide location on (Kotdwar to Dugadda) of NH-534(old NH-119) in the State of Uttarakhand under Annual Plan 2025-26
Authority Engineer for supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 km 160.750 to km 209.9 49.15 km on EPC mode
Authority Engineer for supervision of Construction of road from Bile Migging section of Frontier Highway NH 913 km 0.00 from Migging end to 17.812, km 17.812 to 55.377 Migging end km 0.000 at Bile end to km 27.430 on EPC mode
Authority Engineer for supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 Huri Parsi Palo km 0.00 to 55.725 55.725 km on EPC mode
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of road from Bomdilla 9th Mile Nafra Lada section of Frontier Highway NH913 9th mile Nafra 19.554 to 70.00 50.446 km ON EPC
Authority Engineer for supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 from km 113.25 to 160.75 47.500 km on EPC mode
Authority Engineer for supervision of Construction of road from Bomdilla 9th Mile Nafra Lada section of Frontier Highway NH 913 Dishum Sachung Lada 70.00 to 167.75 97.75km on EPC mode