Loading…
Loading…
25,966 results • Latest
DEVELOPMENT WORKS Const of shamshan ghat rasta ( P/S badhnara )
Completion of Library Above Ambedkar bhawan Hal Construction of CC street from Dhand road to plot of Arvind ( fatehpur P.S) beautification of kua in chamar mohalla( P/S fatehpur) Construction of iron shed in Bairagi s/ghat (fatehpur P/S) CONST.
Supply, Installation, Testing and Commissioning of Fire-Fighting and Fire Alarm of Multistoried Flats at KUK.
Completion of Sain Choupal 1 const of monty in walia choupal near santoshi mata mandir 2.const of IPB 1.Const of IPB street from H/o of billu 2.Laying of granite stone in Jaat d
Estimate for provision of 1No.Mini tube well bore near Sai mandir, BPL Colony of village Tilpat ward 28 (Recall)
COMP.OF CHAMAR HALL NEAR RAMLELA GROUNG (PAI) COMP.OF BADGUJAR DARWAJA (PAI) CONST.OF TOILET BATHROOM IN CHAMAR CHOUPAL NEAR SISMORE ROAD (PAI)
Creation of 4 nos. line bays at 66 kV AIS S/Stn. Escort-II , Faridabad to accommodate LILO of 66 kV double circuit
PAINT WORK CONST OF STREET CONST OF STREET CC STREET /PVC PIPE
In reference to ibid work, a letter was issued from the O/o Chief Engineer/TS, HVPNL, Hisar vide his Memo. No. 209/CCG-96/Vol-IV dated 11.09.2025 addressed to SE/CCMC, HVPNL, Hisar wherein a list of substations wise has been mentioned for action to b
Cleaning of site by removing wild Growth and Surface Levelling cleaance of Grass shrubs and Surface dressing of the ground including removing vegetation in in Ashiana flats Sec-47, Gurugram
TOILET BATHROOM B/WORK PLASTER PLASTER B/WORK
SERVICING OVERHAULING OIL DEHYDRATION OF TRANSFORMER
Estimate for providing and laying cat eye, Solar RPM/ Stud and Thermoplastic other road furniture required as per IRC code in vill Mavai ward no 28 Faridabad (Recall)
Const. ofstore room REPAIR CONST STREET CONST OF STREET Const of IPB from kua to Barsana road ( p/s kheri sikander )
CONSTRUCTION OF GATE REPAIR OF IPB STREET
Repair of Choudhary choupal ( P/S FATEHPUR) Repair and Paint Work of Kashyap Choupal Const of cc street from h/o of Anil to surjeet in yash colony strret no 1( completion of ambedkar bhawan ( p/s fatehpur) Const of B/wall of shamshan ghat ar bai
Providing and Fixing of National Flag including Flag Mast at Community Centre, Sector-55, Ward No. 02, Division-1, NIT, Faridabad.(Recall)
Providing and Laying of pipeline from Rajiv Colony Disposal to IPS Krishna Colony to resolve NGT complaint, in Rajiv Colony Ward No. 1, NIT Faridabad.
Providing and laying Sewer line and water supply line and IPB in various streets in rajiv colony ward no 01 NIT Faridabad.(Recall)
Renovation of Dharamshalla in village Jharshntli in ward no 01 NIT Faridabad.
Providing and laying sewer line, water line and construction of rmc and ipb roads from Mahjid wali gali, Kailash wali gali, Anish wali gali, Jakir wali gali, Jahid House to Jakir in Gaunchi village near Bud wali Masjid in w.no.01 NIT Farid (Recall)
provision of new LED lights with poles from Durga mandir road to disposal (60 ft road) and tricolor decorative pole 8 mtr long at nain chowk and air force chowk ward no 8 NIT Constituency
Development of park Decorative Architecture Ornament, Open Gym, FRP garden sitting bench and dustbin etc. in Ward No.08 Aggrawal Boosting Division-1, NIT, Faridabad. Recall
ESTIMATE FOR SHIFTING OF MUNAK DRAIN FROM INNER PORTION TO OUTER SIDE OF BOUNDRY WALL IOCL FROM RD 13700 TO 20370
Renovation of Moksh-dham village Tikri ward no 11,division 1B under MCG jurisdiction.(Re-Call)
Providing and Fixing 80 mm thick Interlocking Tiles at Revenue Rasta near Panchvati Vatika in village Noorpur Ward No.18 Div-1B under MCG.(Re-Call)
RE- CONSTRUCTION OF CREMATION SHED, WAITING HALL, STORE ROOM, PUJARI ROOM, TOILET, GUARD ROOM AND BOUNDARY WALL ( CIVIL WORK , PLUMBING WORK AND ELECTRICAL WORK ) IN SAMSHAN GHAT IN VILLAGE MEDAWAS , GURUGRAM, UNDER MCG.(Re-Call)
Construction of Road with Beautification Works including Footpath, Street Lighting, and Storm Water Drain from Badshahpur Pond to Kabaddi Stadium, Ward No. 18, Division-1B, Zone-1, under Municipal Corporation Gurugram.(Re-Call)
Providing , Fixing and Installation of Welcome Gate Signage board, Direction Unipole Signage board at various locations under MCG Jurisdiction (EE-HQ)
Estimate for Construction of Tin Shed for Halwai in Sector 10 A Community Center Ward 10, Division 1A, under MCG.
Construction of street and laying of sewer line in Puran wali Dhani gali, Master ki gali in Jogi Mohalla and near Samay Singh farmhouse in Ward, 17, Darbaripur Village under MC Gurugram.(Re-Call)
Providing and laying of water supply pipeline and sewerage pipeline from Shiv Mandir to SPR and UGT for drinking water in Village Ghasola, ward 15 div 1B under MCG.(Re-Call)
Construction of Boundary wall and Laying of interlocking tile and repair and renovation of community center in Darbaripur Community center in ward 17 under MC Gurugram.
Work of Supply Installing Commissioning and Testing of Control Panel for 50 HP pump 10 Sqmm Single core copper cable 16 Sqmm 2 core Aluminum Cable 3 Nos 63 Amp MCCB 2 Nos Air coolers and 1 No RO water purifier at Boosting station
Work of Supply Installing Commissioning and Testing of Control Panel for 50 HP pump 3 core 6 Sqmm copper cable 3 5 core 95 Sqmm Armored aluminum cable 250 Amp MCCB 400 Amp MCCB 1200mm Ceiling Fan at Sewerage disposal in Sector13 Bahadurgarh
Work of Supply Installing commissioning and testing of Star Delta Starter Panel for 100 HP Motor fixing of pump including DI specials and Providing and fixing of 25 Sqmm 3 Core copper cable at Water Treatment Plant in Sector 7 Bahadurgarh and a
Bhiwani Ist Block Bio drainage Project Ridge and Pits Plantation
Mundhal Block New Plantation and Maintenance Works from 2026-27 to 2028-29
Bhiwani IInd Block Bio drainage Project Ridge and Pits Plantation
Mundhal Block Bio drainage Project Ridge and Pits Plantation
Siwani Block Maintenance Works Campa Scheme from 2026-27 to 2027-28
Miran Block Maintenance Works Campa Scheme from 2026-27 to 2027-28
Loharu Block New Plantation and Maintenance Works Campa Scheme from 2026-27 to 2028-29
Estimate for tapping of untreated sewage points at various locations under Yamuna Action Plan at Buriya nallah under Municipal Corporation Faridabad. (Recall)
Obra Block Maintenance Works Campa Scheme from 2026-27 to 2030-31
Supply of Potable water tanker of 5000 Litre Capacity for Summer season in Ward No. 03, Ballabgarh.
Estimate for Construction of Room and Varnda in Deen dayal Park in Ward No. 04 Ballabgarh.(Recall)
Estimate for Civil Maintenance Work in Ward No. 43, Ballabhgarh.
ANNUAL MAINTENANCE ESTIMATE FOR SEWERAGE SCHEME REWARI TOWN
Supply of potable Drinking Water tanker 5000 litre capacity for summer season in Ward No. 45, Ballabgarh.