Loading…
Loading…
1,144 results • Latest
Restoration of rian damages on Bhager Panol Sunhani road in km 0/00 to 3/300 SH C/o Cement Concrete road to village Kangar in km 0/00 to 0/350, R/wall at RD 0/150 to 0/190, B/wall at RD 0/310 to 0/340 and U-shape drain at RD 0/050 to 0/350 under PD
Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rocks, chiseling/wedging out of rocks (where blasting is prohibited) as per drawings and MORD technical specification 2014 clause 305 (Three zero five) and as per direction of the Engineer-in-Charge. The rate includes, octroi, royality Malkhana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
SH C/O B/wall 3/500 to 3/530, 3/915 to 3/935 and R/wall at RD 5/500 to 5/551 and Removal of slips on various Rds KM 0/000 to 5/500 Under PDNA
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a any lead and lift , dressing of sides and bottom and backfilling in trenches with excavated suitable material.useful material available from excavation to be properly stacked and handed over to the department free of cost including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
SH C/O Hume Pipe Culvert 900mm Dia. At RD 0/290 and 0/320 and B/wall in PCC at RD 0/325 to 0/405
Excavation in soil in Hilly Area in all kind of sand by mechanical/manual means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and lead upto 20 m as per Technical Specification Clause 1603.1 and as per HPPWD, specification of 1990 Volume-I, or as directed by the Engineer-In-Charge.
(Sub Head -Construction of retaining wall Near Toilet Block between RD. 0/015 to 0/055) under Edu. Deposit SID- SDF-2025/1119)
Earth work in excavation for structures in all depths as per drawing and M.O.R.D.technical specification section 300 & 1600 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all lead and lift including dressing of sides and bottom and back filling in trenches with excavated Suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge, hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner, filling of unevenness and finishing the road to specified dimension or as directed by the Enginer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage, rain and other causes it shall be removed by suitable diversion, bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the whole responsibility of the contractor which shall have to be duly compensated by him at his own cost .The rate is inclusive all taxes levy by the government time to time including GST.
Dismantling Porch, window, wall and P/L slab in 1 2 4
Dismantling C.G.I. Sheet roofing including ridges, hips, valleys, gutters etc. stacking the serviceable materials and disposal of un-serviceable materials within 20 metres lead.The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge. "The rate quoted shall be deemed to include all taxes, duties, levies, and charges including GST, octroi, royalty, toll tax, sales tax, or any other tax as applicable and imposed by the Government from time to time." .
Deployment of man power of various skilled and un skilled category for one year annual running and operation of the scheme
Deployement of manpower of various Category for Annual Running and Operation of water supply Scheme including watch and ward of various gravity mains,storage tanks, Nallah source and distibution system of GI pipes various diameter as well as offical work of class 4 category etc. for 10 months complete in all respect and entire satisfaction of the Engineer-in-Charge. ( Repair of major civil and other works will be measured and paid for separately.)