Loading…
Loading…
19,489 results • Latest
Suspension Dicyclomine HCl 10 mg with Activated Dimethicone (Simethicone) 40 mg per ml, 10 mg per 5ml; 30 ml phial
Supply Installation and Commissioning of Fog Pilot assistance System."As per attached RDSO Specification".
DBU-OHE modifications in connection with Provision of Emergency Dispatch cross over at YNK end for providing Universal R&D facility to all running lines and connectivity from Tower car Shed to existing shunting Neck including extension of existing neck from 440 to 600m.
(i) Pardhade: Provision of High-level platform at Pardhade station of length (375x3.75mx2) (PF 1&2) (PID: 01.01.53.25.3.50.026), (ii)Sirsoli- Raising of platform from rail level to high level at Sirsoli railway station, DN RL PF: 360 m X 4m) & UP RL PF : (360m X 4m) (PID : 01.01.53.25.3.50.027), (iii)Mahaswad- Raising of platform from rail level/medium level (220mx 9.10m) & (144mx9.10m) to high level DN Loop PF (240mX7m). (PID : 01.01.53.25.3.50.028), (iv)Waghoda : Raising and extension of platforms from Rail level to High-level platform (555mm x6mm,) including toilet, sitting arrangement, drinking water and drainage arrangement etc. at waghoda railway station. (PID: 01.01.53.25.3.50.030), (v)Dongargaon : Raising and extension of platform from rail level to High level UP (360m X 8m) & DN (380m X 8m), including toilet, sitting arrangement, drinking water and drainage arrangement etc at Dongargaon station. (PID : 01.01.53.25.3.50.031), (vi)Provision for divyangjan amenities at Asirgarh, Bagmar, Mandwa & Duskheda on Railway stations.(NSG-6) (PID : 01.01.53.25.3.50.029).
Provision of Automatic signalling between WFD-JTJ section-TRD works.
[i] SBC-JTJ Section: Proposed construction of RUB at trespassing location at km 339/300-400 between HDIH-KJM stations in ADEN/SBC sub-division- TRD works[ii] SBC-JTJ Section: Proposed construction of Pedestrian subway at Km.230/000-100 between PU-MAR stations in ADEN/BWT Sub-division [iii]Recoupment of ballast at TSS,SP/SSP and provision of cable trench covers in SBC-JTJ Section.[iv]Bifurcation of elementary section at SKPT station and modification of umbrella structures at YPR station. [v]Provision of earthing and bonds at SSP/SP,FOB and Platform shelters in SBC-JTJ Section.[vi] KJM-Augmentation of KJM shed for increasing homing capacity from 175 to 300 Electric Locomotives-Detailed Estimate. [vii]OHE modifications in connection with Construction of new AC loco trip shed at YPR. [viii] YNK-BWT Section: Proposed an approach road on LH side in RUB 85A at Km 96/200-300 between CMY-SVS stations [ix] OHE modifications in connection with construction of AC Loco trip shed at SMVB.
CORRUGATED HOSE COFLEX FOR 3 PHASE TRACTION MOTOR.
AXLE END CAP (WITHOUT SCREWS) FOR UPGRADED CTRB CLASS "E" (6"x11").
Supply of Wi-Fi ADSL Modem with DSL connectivity for ADSL2+/ADSL2/ADSL standard
Hand driven Centrifugal Pump/ Drum on fixed stand/Oil measuring cane/HDPE container (Oil can)
Thin walled single core cable 4GKW-AX 1.5sq.mm, 1800V, BK, AS PER CLW SPEC No. CLW/ES/0458/E or latest.
Repair kit of wiper servomotor as per M/s Electromech or M/s Knorr-Bremse part No. Each set consisting of 20 items as per annexure enclosed.
Comprehensive Annual Maintenance Contract of 2 Nos Electromagnetic Crack Detectors for Coil Spring of ICF and LHB Coaches Make: K-Electronics for 2 years at DBWS.
Body side window assembly with fixed Louver Shutter bottom shutter assembly
SUPPLY, INSTALLATION AND COMMISSIONING OF VACUUM PUMP 300 LPM, 0.75 HP, 3 PHASE FOR 1000 LPH TRANSFORMER OIL CIRCULATION PLANT (SHAFT DRIVE ONLY ALLOWED)
Poly Carbonate sheet for window as per drg. no. EMU/M2/SK-157/2019