Loading…
Loading…
19,635 results • Latest
Spare parts required for maintenance of fork lift truck, Capacity 03,05 & 10-Ton
A) DR-PR-MTN-SION-GTBN - Rendering service for maintenance work including supply of materials for colonies under SSE(W)DR for 24 Months. B) CLA-VVH-TMBY - Rendering service for maintenance work including supply of materials for colonies under SSE(W)CLA for 24 Months
Aluminum Impeller for centrifugal type oil cooling blower as per RDSO Specification No. RDSO/ 2016/EL/SPEC/0123, Rev.-0 or latest and RDSO Drg. No. RDSO/2016/SK6/EL/SPEC/0123 for 3- Phase Locomotives.
Spare parts required for maintenance of Ace fork lift trucks Capacity 03 & 05-Ton.
CLOTRIMAZOLE + CHLORAMPHENICOL + BECLAMETHASONE + LIDOCAINE EAR DROPS
Rate Contract for Manufacture and supply of Improved Switch Expansion Joint for Long Welded Rail (with 65 mm Max. Gap) for B.G. 60KG Drg: (RDSO) RDSO/T-8926, Alt.02.
Spare parts suitable for Josts make battery-operated platform trucks, capacity 02 ton, model FWHFB 20 DC Type (fixed), Mfg. year 2022 as per attached item list (Annexure-I). Make: Josts or equivalent reputed brand. (01 set consisting of 10 items, total 94 Nos.)
ELGI make Annual Overhaul Spares for Auxiliary Compressor
Spare parts required for maintenance of godrej fork lift truck Capacity 03 & 05 Ton.
F-1 SELECTOR VALVE ASSLY. TO WABCO PT.NO. 557995. EACH UNIT SHOULD
SAFETY WIRE ROPE FOR BRAKE BEAM (MODIFIED) TO ICF DRG. NO. T-3-2-651 ALT k/2, ITEM- 1, 2 & 3 IN ASSEMBLED CONDITION. MATERIAL AND SPECIFICATION AS PER DRAWING
Acrylic cover for ACP Handle With 3 inch Hinges (AISI-304) in LHB Coaches.
Procurement of SITC of inflatable Tent with accessories as per attached detailed Specification of Malda Depot. Make- Garware/Lanco/Maan/Sethiya or Similar.
Comprehensive Annual Maintenance Contract of 500 Ton Hydraulic Wheel Press (Make: BBM) at Carriage Repair Shop, Tirupati for a period of Five years
DAPAGLIFLOZIN 10MG + SITAGLIPTIN 100MG T [DAPAGLIFLOZIN 10MG + SITAGLIPTIN 100MG TAB IN STRIP]
Fuse HRC Porcelain Complete assly.With fuse base for front connection,Fuse link 35 Amps. 500V AC for CCBA.
CONSTRUCTION OF THE POP MASONRY BUILIDING AT BANDARIABAG IN LUCKNOW TERRITORY
Dewatering of water logged RUB No-[NN-171, NN-173, NN-184, NN-187, NN- 188,NN-192, NN-194, NN-209, NN-211,NN-219,NN-223, NN-236, NN-237, NN-239, NN-241, NN-246, NN-258, NN-259, NN-260, NN-261 , NN-266 NN-153, NN-155, NN- 157, NN-159, NN-166 (In BG/II section) and 200, 265, 311(In BG/IV section ) [Total RUB 29 No's] for 365 days for each RUB in BG-II & BG-IV section.
SUPPLY OF A SET OF ADJUSTING GAUGE JG321 [SUPPLY OF A SET OF ADJUSTING GAUGE JG3213 AND ADJUSTING GAUGE 3115A FOR GALLAND MAKE- SHORT NEUTRAL SECTION ASSEMBLY(PHASE BREAKE PTFE TYPE) MAKE : GALLAND OR SIMILAR]
ADHESIVE PLASTER NON EXTENSILE TAPE [ ADHESIVE PLASTER NON EXTENSILE TAPE WOVEN 10 X 5 MTRS. PER NO]