Loading
Loading…
Loading…
4,074 results • Latest
Please refer to Boq
Rebuilding of damaged DTs through Divisional Workshop for ED Awantipora for the year 2026-27 or till next rate contract.
Air Conditioning, High Mast Lighting and Installation of CCTV Cameras at 132/33 KV Grid Station Bari-Brahmana-II and installation of High Mast lights 1x50 MVA Grid Station Mahanpur.
Replacement of damaged poles Outside Central office SMC_9mtr long ST poles by 11mtr long ST poles and Installation of 11KV Isolator
Construction of DFO Office at Ramnagar (Ongoing) under CAPEX 2026-27
PROVIDING OF PROTECTION WORK TO THE TOWER FOUNDATION BY WAY OF CONSTRUCTION OF RCC PROTECTION WALLS AT TOWER LOCATION NO. 14,15 and ,30 OF 132kV BARN-CANAL TRANSMISSION LINE