Loading…
Loading…
8,781 results • Latest
CONSTRUCTION OF SHG TRAINING CENTRE AT VILL-DOMANGARIA GP- DOMANGARIA UNDER PAKURIA BLOCK DIST-PAKUR
Annual Operation maintenance work of Saraikela Urban Water Supply Scheme consisting of main feature such as operation and maintenance of 5 MLD WTP Daily Average supply 2 7 MLD near Saraikela Division Office and Intake well situated at Kharkai
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Kukru Block of D W S Sub Division Chandil
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Ichagarh Block of D W S Sub Division Chandil
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Nimdih Block of D W S Sub Division Chandil
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Chandil Block of D W S Sub Division Chandil
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Kuchai Block of D W S Sub Division kharswan
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Kharswan Block of D W S Sub Division Kharswan
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Gamhariya Block of D W S Sub Division Saraikela
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Rajnager Block of D W S Sub Division Saraikela
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Saraikela Block of D W S Sub Division Saraikela
Strengthening of Road from (i) SH Basia to Kulusera (Part- A) (L-6.150 Km.), (ii) SH Basia to Kulusera (Part- B) (L-6.500 Km.), (iii) Karamtoli to Majhkera (L-2.250 Km.), (iv) Tiral to Bombiyari (L-4.000 Km.) (v) Kinirkela to Turbunga (L-4.600 Km.
Construction of Road from Bajranbali Mandir to Jarga (L-1.600Km.)
Construction of 9 seater Public Toiled in ward no 10 within mela premises under nagar panchayat basukinath(PT No 1)
Carrying out Preventive / Schedule and breakdown maintenance of 132/33 kV, 2x50 MVA Grid Sub-Station, Chandankyari, Bokaro for the period from 01.06.2026 to 31.03.2027 (i.e., 10 Months).
Carrying out Patrolling, routine /breakdown etc. maintenance of 132 KV D/C Chandankyari - Govindpur Transmission Line (67.8 Km) under Transmission Subdivision Chandankyari, Bokaro for the period from 01.06.2026 to 31.03.2027 (i.e., 10 Months).
Proposed Block Public Health Unit At gram Hochar, Panchayat Tarup Under Block- Ratu
Work on developing the identified Aganbari centers Block Masaliya under Dumka District as Model Aganbari Centers. 15 Nos
Construction of Road from RCD Road to Chawalchhalla Village (L-0.810Km.)
Construction of Road from Lalvan to Salbandra (L-2.000 Km.)
Construction of four rooms at High School, Tara, under Jamua Block
Construction of Series of Check Dam at Pandey Dumariya Joriya under Block - Palojori, District - Deoghar
Construction of Check Dam at Baski Joriya under Block - Sarath, District - Deoghar
Widening and Strengthening - Re-Construction of Barwadih - Mandal - Bhandariya (Part-1, Ch.-0.00 Km. to Ch.-25.00 Km.) (Total Length-25.00 Km.) Road.
Widening and Strengthening/Reconstruction of Srikund (on RCD Road) to Bindupara (on RCD Road) via Kankjol Road (Length-6.750 Km) under Road Division, Sahibganj for the year 2024-25
Improvement of Riding Quality Programme (IRQP) work of Jorm(NH-143) to Sarangbera upto Orissa Border Road (Total length 8.1KM) under Road Division Simdega.
Providing water supply in Central School Sugasar with 1 No 2HP Submersible MOTOR pump set Rising Pipe line and 1 No HYDT Etc complete job under Drinking Water and Sanitation Division-02 Giridih
Construction of Road from Gram Barwadih Ahirpurwa Tola Samshan Ghat to Electric Pole via Masjid (L-0.350 Km.)
Relocation of Defunct Tube Well 125 x 115 mm dia and 90 mtr deep Drilled Tube well with installation of IM-II Hand pump PCC Platform and 3.0 mtr long drain on turnkey basis (1st Call) Group No-02 (55 Nos)
Repair and maintenance, Painting (inside and outside area) Sanitary work, septic tank and other Misc work of E1 and E4 quarter at colony campus of 132/33 KV GSS Garhwa road
Construction of Anganwadi center Jiyajor in Panchayat Kushyari of Block Saraiyahat under Dumka District.
Construction of PCC road at Village Baddabdal Tola (Land of Budhnath Marandi to REO Road) Panchayat-Baskidih, Block- Masaliya Distt-Dumka.
Construction of rural water supply Scheme with 2.0 HP DC Solar motor pump complete set for at the land of Faiyaj Aalam in Madhwapada GP , Block - Barharwa dist - SBG
Construction of P.C.C. ROAD with Culvert From Fatehpur to Pathariya BalaPokhar Village Fatehpur in Masaklaiya GP PART - A , Block - Taljhari Dist.- Sahibganj
Construction of P.C.C. ROAD From Fatehpur to Pathariya BalaPokhar Village Fatehpur in Masaklaiya GP PART - C , Block - Taljhari Dist.- Sahibganj
Construction of PCC Road from Sujit Kund house towards Brajesh Ji house and R.C.C. culvert near Sujit Kund house Ward No. 07
Construction of P.C.C. ROAD From House of Motka Hembrom to football Ground in Bakudi Manjhi tola Village , Bakudi GP , Block - Taljhari Dist.- Sahibganj
Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark- II with 32 mm dia medium class riser pipe and 1/3 Cylinder including supplying of materials labours On Turn Key basis at Block Sonaraitharhi under DWS DivDeogharforFY 26-27
Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark- II with 32 mm dia medium class riser pipe and 1/3 Cylinder including supplying of materials labours On Turn Key basis at Block Sarwan under DWS Div Deoghar for FY 2026-27
Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark- II with 32 mm dia medium class riser pipe and 1/3 Cylinder including supplying of materials labours On Turn Key basis at Block Mohanpur under DWS Div Deoghar for FY 2026-27
Construction of Drain from Rambaran Choudhary and sourav Jha house towards Main Drain in front of Bharti Computers
Construction of R.C.C. drain from Md. Gani house towards Allauddin house W-17
Construction of R.C.C. drain from Md. Talat Mahmud house towards Md. Sajjad House W-17
Repairing of drain from Kuldip Singh road bajrangbali Mandir towards Puliya Ward No. 13
Construction of R.C.C. drain from Commissioner Staff Quarter towards main drain via Karan Shop Ward No. 21
Construction of RCC drain in telephonic exchange Road near Vinayaka netralaya corner point to the direction of Hari Gopal Majumdar cross near transformer to Satya micro capital limited Dhanbad office building bike side and different location and ward
Construction of Primary Health Centre at Maheshmunda under Block Gandey District Giridih Gr_04
Construction of 04 (Four) Classroom at Upgraded Middle School Bazar Tola Bagbera Under Jamsehdpur Block
Carrying out routine patrolling Preventive Breakdown Maintenance of Jamtara Maithon (DVC) TL LILO of Jamtara Madhupur TL at GSS Kundhit from LILO point to GSS Kundhit under TD Deoghar 2 for the period from 01.05.2026 to 31.03.2027
Construction of PCC Road (Approach Road) at Nirmal Awas under Ward No-38