Loading…
Loading…
2,923 live1,184 closing this weekmost from Karnataka Forest Department and Rural Development and Panchayat Raj Department
Published at kppp.karnataka.gov.in, Karnataka's official e-procurement portal.
2,923 results • Latest
Supply, Installation, Testing and Commissioning of Portable Electro Fusion Welding Machines suitable for HDPE/MDP Pipe jointing works to 36 GP in Chikodi Taluka under Chikodi Division of Belagavi District
THE SUPPLY OF AUTOMATIC CRYOSTAT AND AUTOMATIC MICROTOME EQUIPMENTS TO THE DEPARTMENT OF PATHOLOGY OF MANDYA INSTITUTE OF MEDICAL SCIENCES, MANDYA
THE SUPPLY OF BATTERY OPERATED DRILL SYSTEM TO THE DEPARTMENT OF ORTHOPEDICS OF MANDYA INSTITUTE OF MEDICAL SCIENCES, MANDYA
SUPPLY OF EQUIPMENTS REQUIRED FOR THE ESTABLISHMENT OF ANIMAL CELL CULTURE FACILITY AT THE MULTI DISCIPLINARY RESEARCH UNIT MRU OF THE MANDYA INSTITUTE OF MEDICAL SCIENCES MANDYA
Supply, Installation, Testing and Commissioning of Portable Electro Fusion Welding Machines suitable for HDPE/MDP Pipe jointing works to 46 GP in Athani Taluka under Chikodi Division of Belagavi District
construction of RCC Multi Cell Box Culvert on Madanamatti Side and Maheshwadgi side Along with service road/Ramp for the approaches of the on going Maheshwadgi Bridge (Bridge Code N-BGK-JAM-27) takenup by KRDCL Across Krishna river in Bagalkot District.
RFP for providing Annual Maintenance Contract (AMC) for All HT(High Tension) & LT(Low Tension) Control Panels, Transformers, Earth Pits, Substation Equipments, Electrical Fittings and Diesel Generator at IT Park Hubli
SUPLLY OF MATIRIALS FORCONSTRUCTION OF BOX DRAINAGE FROM MANJU HOUSE TO LAXMI HOUSE
Replacement of damaged electricity meter switch boxes in Blocks A, B, C, D, and E, and the installation of new streetlights in Blocks C, D, and E in related to handover of streetlights and electricity meters installed in the Atal Bihari Vajpayee Layout (Malligenahalli) developed by the Shivamogga-Bhadravathi Urban Development Authority
Providing pavement concrete at stock pile-1 (Area-1 of CCY-2 from 350.00 mts to 800.00 mts) in CHP area at RTPS
Supply, Installation, Testing and Commissioning of Portable Electro Fusion Welding Machines suitable for HDPE/MDP Pipe jointing works to 08 GP in Kagawad Taluka under Chikodi Division of Belagavi District
Selection of a Concessionaire for Development, Operation and Maintenance of Premium Wellness Resort at Kodikal on Design, Build, Finance, Operate and Transfer (DBFOT) Basis (PPP Mode)
Selection of a Concessionaire for Development, Operation and Maintenance of Tourism Facilities at Trasi Maravanthe Beach on Design, Build, Finance, Operate and Transfer (DBFOT) Basis (PPP Mode)
Construction Of Gram Panchayat Office Building At Kulagod Village In Mudalagi Taluka
Giving Fundamental Facilities Near Shri Durgadevi temple at kopadatti village In Mudalagi Taluka
Construction of CC Road and Drain in SC Colony At Benachinamaradi K Village In Gokak Taluka
Consrtuction of CC road from Mr Yallappa Nayak house to Mr Siddappa Ugalat house in ST Kalony Bisanal Village in Bilagi Taluk(0.00to 0.120 km)
Providing Basic Facilities Near Shri Basaveshwar Temple at Bassapur village and Near Shri Basaveshwar Temple at Mallapur K.A village in Kittur Constituency
Construction of CC Road and Drain in SC Colony at Shingalapur Village Of Gokak Taluka
Construction of community Hall near sunkalamma devi temple in Raibag village in Raibag taluka
FOR SUPPLY OF TWO TIER COTS TO VARIOUS PRE-METRIC AND POST METRIC HOSTELS FUNCTIONING UNDER THE SOCIAL WELFARE DEPARTMENT ACROSS THE KARNATAKA
Giving Fundamental Facilities Near Shri Revanasiddeshwar Temple At Laxmeshwar Cross In Mudalagi Taluka
Reconstruction of bridge on the road connecting from kaalenahalli to hoskotekopplu via hosuru at ch 14.20km in k r nagara taluk
Selection of a Concessionaire for Development, Operation and Maintenance of Tourism Facilities at Thannirbhavi Beach on Design, Build, Finance, Operate and Transfer (DBFOT) Basis (PPP Mode)
FOR SUPPLY OF COIR MATTRESS WITH POLYESTER PILLOWS TO VARIOUS HOSTELS FUNCTIONING UNDER THE SOCIAL WELFARE DEPARTMENT ACROSS THE STATE OF KARNATAKA
Design,Supply, Installation & Commissioning of 20 KLPH Milk Processing Line which includes 20 KLPH dual duty pasteurizer and 20 KLPH Homogenizer along with autoplant components at CHIMUL, Chikkaballapura
Providing service for Exposure Visit / Study Tour proposed under the Swachh Bharat Mission 2.0 (SBM 2.0) as part of the capacity-building programme 2026-27 for officials working at Bangalore South DUDC
Providing Basic Facilities Near Shri. Banashankari Temple at Turmari village, Near Shri. Madiwaleshwar Temple at Turamari village and Near Shri. Hanamant Devar Temple at Savatagi village in Kittur Constituency
Supply of Rotogravure Printing Inks
Reconditioning of Clinker Grinder assemblies by replacing the shafts and then balancing the assemblies
Providing Basic Facilities to PKPS Society at Veerapur village in Kittur Constituency of Kittur Taluka
Procurement of Reverse Osmosis Demineralization Chemicals
KBS, Stall No-17, (Built up) GENERAL STALL, Reserved for SC, 179 sqft, 5 years ELF Rs 73,185/-, EMD Rs 2,19,055/-
KBS, Stall No-18, (Built up), T-1, GENERAL STALL, Reserved for general, 179 sqft, 5 years ELF Rs 73,185/-, EMD Rs 2,19,055/-
KBS, Stall No-27, (Built up) T-1, GENERAL STALL, Reserved for general, 70 sqft, 5 years ELF Rs 1,36,501/-, EMD Rs 3,71,776/-
KBS, Stall No-44 (Built up), T-1, General Stall (Reserved for General), 104.02 sqft 5 years ELF RS 24,454/-, EMD RS 72,862/-
KBS, Stall No-46 (Built up), T-1, General stall (Reserved for ST), 103.82 sqft 5 years ELF RS 16,940/-, EMD RS 50,320/-
KBS, Stall No-48 (Built up), T-1, General Stall (Reserved for SC), 105.18 sqft 5 years ELF RS 20,560/-, EMD RS 61,180/-
KBS, Stall No-59 (Built up), T-1, General Stall (Reserved for General), 107 sqft, 5 years, ELF RS 4,538/-, EMD RS 13,114/-
KBS, Stall No-78 (Open Space),T-1, General Stall (Reserved for General), 157.82 sqft 3 years ELF RS 1,63,350/-, EMD RS 4,89,550/-
KBS, Stall No-118 (Open Space),T-1, General Stall (Reserved for General), 100 sqft 3 years ELF RS 3,11,625/-, EMD RS 9,34,375/-
KBS, Stall No-125 (Open Space), Veg Hotel, T-1, (Reserved for General), 348.75 sqft , 3 years ELF RS 3,53,581/-, EMD RS 10,60,243/-
KBS, Stall No-03 (Built up), Terminal-2A General Stall (Reserved for General), 110.58 sqft , 5 years ELF RS 1,09,808/-, EMD RS 3,28,924/-
KBS, Stall No-07 (Built up) Terminal-2A General Stall (Reserved for General), 108.05 sqft 5 years ELF RS 1,58,511/-, EMD RS 4,75,033/-
KBS, Stall No-08 (Built up) Terminal-2A Cloak Room(Reserved for General), 554 sqft 5 years ELF RS 1,25,913/-, EMD RS 3,77,293/-
KBS, Stall No-12 (Built up) Terminal-2A Cloth and Bag Stall (Reserved for SC), 350.49 sqft 5 years ELF RS 3,50,000/-, EMD RS 10,49,500/-
KBS, Stall No-02 (Open Space) Terminal-3, General Stall (Reserved for General), 90 sqft 3 years ELF RS 3,22,940/-, EMD RS 9,68,320/-
Advance work at Govindapura Sy.No. 8 Block I -25 ha Block II -25 ha & Block III -10 ha - -in Shankar Range during 2026-27 under DDF - 60 HA
Electrification and repair of the Trommel shed at the SWM unit of TMC Hungund
KBS, Stall No-03 (Open Space) Terminal-3, General Stall (Reserved for General), 90 sqft 3 years ELF RS 3,32,750/-, EMD RS 9,97,750/-