Loading…
Loading…
28,610 results • Latest
Advance work to be taken for CA planting 2027 rains including raising of Nursery work 25 Ha at Kotebhavi Fs. 41 of Ankola Range (03-CA-CAMPA)
Advance work to be taken for CA planting 2027 rains including raising of Nursery work 25 Ha at Kawalalli Bl-XXIV-28 Fs. 3 P-II of Mastikatta Range (03-CA-CAMPA)
Advance work to be taken for CA planting 2027 rains including raising of Nursery work 25 Ha at Kawalalli Bl-XXIV-28 Fs. 3 P-I of Mastikatta Range (03-CA-CAMPA)
Advance work to be taken for CA planting 2027 rains including raising of Nursery work 25 Ha at Dongri Fs. 48 P-II of Mastikatta Range (03-CA-CAMPA)
Providing irrigation facilities through borewell to the land of Vasudeva Ranya bin Koraga Baira Kullaje house in Amaramudnuru village of Sullia taluk in Dakshina Kannada district.
Providing irrigation facilities through borewell to the land of Peraje Prakasha P bin Appunga Naika in Mandekolu village of Sullia taluk in Dakshina Kannada district.
Providing Irrigation facilities to Scheduled Tribe Beneficiaries in Sullia constituency of Dakshina Kannada district- TSP Package-01
Providing irrigation facilities through borewell to the land of Sampaje Aladka Vijayakumar A R bin Ramu in Sullia taluk of Dakshina Kannada district.
Construction of retaining wall on both sides of thodu near Yermal Junior College of Sri Rama mandira in 6th Ward of Bada Village in Kapu taluk of Udupi District.
River bank protection work to the right bank of Phalguni river near Angarakariya Sooryanarayana temple in Hosangady village of Belthangady taluk in Dakshina Kannada district
Construction of retaining wall on the west side of Ucchila Sri Mahalingeshwara Mahaganapathi temple in Kapu taluk of Udupi District
Advance work to be taken for planting 2027 rains including raising of Nursery work 25 Ha at Devkar Fsy No. 87&59 of Kadra range (06-CAMPA)
Advance work to be taken for planting 2027 rains including raising of Nursery work 25 Ha at Mudgeri Fsy No. 609&612 of Gopshitta range (06-CAMPA)
Construction of a footbridge across the kanasoorbail stream in sadashivalli gram panchayat, sirsi taluk. Uttara kannada district
Construction of footbridge across stream connecting Alagod village to Honnavar Menasi State highway of halageri Gram panchayth in siddapur taluk of uttarkannda district
Construction of footbridge across kallare stream near mulagunda village of Nilkunda Panchayat in siddapur taluk of uttarkannada district
Construction of Foot Bridge at Bedasgaon Gram Panchayati Near Tenkal Umachagi Parmeshwar kere goudas field side Nalla in Mundgod Taluka UttaraKannada Dist. (RESERVED FOR SC CONTRACTORS ONLY)
Construction of Foot Bridge at Bedasgaon Gram Panchayati near Ballekoppa Veerajgouda VenkanaGoudas field Devar Jaddi Nalla in Mundgod Taluka UttaraKannada Dist. (RESERVED FOR ST CONTRACTORS ONLY)
Construction of Foot Bridge at Kodambi Gram Panchayati near Sulleman Alad Kattes Field, Veerapur road side Nalla in Mundgod Taluka, UttaraKannada Dist. (RESERVED FOR SC CONTRACTORS ONLY)
CONSTRUCTION OF FOOT BRIDGE NEAR HOUSE OF KUMBATTI RAMACHANDRA V BHAT IN NANDOLLI GRAM PANCHAYAT YELLAPUR TALUK UTTARA KANNADA DISTRICT (CAT-I)
Construction of Foot Bridge at Bedasgaon Gram Panchayati near Shyanavalli Kalkoppa Chandrus Field side Nalla in Mundgod Taluka UttaraKannada District. (RESERVED FOR CATAGORY-2A CONTRACTORS ONLY)
Construction of Foot Bridge at Bedasgaon Gram Panchayati Near Tenkal Umachagi Gannapati Krishna Bhatts field side Nalla in Mundgod Taluka UttaraKannada Dist. (RESERVED FOR CATAGORY-2A CONTRACTORS ONLY)
CONSTRUCTION OF A FOOTBRIDGE AT THE AMBADIKODLU NALA IN UMMACHAGI GRAM PANCHAYAT, YELLAPUR TALUK. UTTARA KANNADA DISTRICT
Construction of a footbridge at the Hasekallu ST Colony in Hasanagi Gram Panchayat, Yellapur Taluk Uttara kannada District
CONSTRUCTION OF FOOT BRIDGE NEAR TEMPLE OF DEHALLI GRAMA PANCHAYAT IN YELLAPUR TALUK UTTARA KANNADA DISTRICT
Manufacture and supply of 8/9 mtr RCC/PSCC Poles to City & Rural Sub-Division of Gadag Division on Rate Contract basis for a period of Two years & extendable for another one year.
A)- 1)Construction of CC road (165m) and CC Drain (330m) from Bale Veeresh House To H.Renukappa House, 2)Construction of CC road (185m) and CC Drain (360m), from Jadebageramma House To Dalavayi Seenu House,3)Construction of CC drain (100m) from H.Renukappa House to Halle Ramappa House, in yallamma camp.B)- 1)construction Of CC road and drain (210m) from devasamudra village Main Road To Hightech Toilet,2)construction CC road and drain (100m) Ganigara Pramilamma HouseTo Kabbara Bheemanna House, 3)construction CC road (160m) from Metri Kenchamma House To Main Road (Ambedkar Statue),in Devasamudra Village.C)- 1)Construction Of CC road (240m )and drain (140m) from Harijana Suresh House To LLC Canal, 2)construction of CC road (60m) from Harijana Thayamma House To Harijana Durgamma House ,3)Construction Of CC road from Harijana Pampapathi House To Harijana Rajanna House (90 m), 4)construction CC road (100 m) from Cheluvadi Manappa House To Dr. Shekappa House, in ramsagar village.D)- 1)constuction of CC Road (80 m) from Naidu House to Kaddipudi Basava House, 2)Construction of CC road (140 m) from VeerabadraSwamy House to Kaddi Basavaraj House,3)constuction of CC Road (75m)from Ramanna House to Nagaraj House, 4)constuction of CC Road(105 m) from Beerappa House to Veeresh House ,5)constuction of CC Road (65m) from Prabhu House to Eshwara House, in aralihalli village kampli taluk in Kampli Constituency Ballari District, under 2515 KKRDB (Macro projects) for the year 2025-26
PROVIDING MANPOWER SERVICES (DATA ENTRY OPERATORS AND JUNIOR EXECUTIVE ASSISTANTS) ON OUTSOURCE BASIS TO KUIDFC FOR A PERIOD OF TWO YEARS
Maintenance Buildings at White field Depot of line -1
Raising of Monsoon Plantation seedlings 14x20 at Lion Safari in 1.71 Ha during -2026-27 (Unit No.6)
Procurement of Matti Wooden Planks for BM-2 of RTPS
a) Providing Interlock to Ward 11 from Naganna House to Madappa Store in Kadur Town in Kadur Taluk, b) Construction of CC Drain beside Saptakoti lodge in Ward no 11 in Kadur Town in Kadur Taluk, c) Providing Interlock to Ward 11 from Rajanna House to Ravi Bar Right side road in Kadur Town in Kadur Taluk d) Improvements to road from KG Srinivas House to Bhavi Sidappa house in Ward no 12 in Kadur Town in Kadur Taluk e) Improvements to various roads in Ward No 13 of Kadur Town in Kadur Taluk, f) Construction of CC drain in ward no 14 Ashwath Nagara from BEO Manjanna House to Mani House in Kadur Town in Kadur Taluk, g) Improvements to road Post office to Shuddaganga unit in Ward No 14 in Kadur Town in Kadur Taluk, h) Providing Interlock in Ward 15 from Manjanna House to Gare kanappa house i)Providing Interlock in Ward 15 from Driver Bashaa House to Angur House j)Providing Interlock in Ward 15 from Vishwanna house to Tiles Dadu House k)Providing Interlock in Ward 15 from Usha House to Yalamma house in Kadur Town in Kadur Taluk l) Construction of CC drain in ward no 16 Kuvempu Nagra (Seleceted reaches) in Kadur Town in Kadur Taluk, m) Construction of CC Drain and Road in various streches in ward no 16 of Kadur Town in Kadur Taluk, n) Construction of CC drain in ward no 17 from Sunnadagagodu Somanna house to Honama House in Kadur Town in Kadur Taluk, o) Improvements to road from Umesha House to vibhuti Chnadrappa House in ward No 17 in Kadur Town in Kadur Taluk, p) Construction of CC Road from shetru house to Kumar house in ward no 17 of Kadur Town in Kadur Taluk, q) Improvements to road from Rudregowda House to Dakhinamurthy House in Ward no 18 in Kadur Town in Kadur Taluk, r). Construction of CC drain in ward no 18 upto K. Hosahalli Kalyani in Kadur Town in Kadur Taluk
Repairs of Bridge of Pattan cross to Narayanpur dam of SH 155 at Km 133.20 in Hunasigi Taluka. (Under 5054-80-190-0-01-132 for the year 2025-26)
Appointment of Structural Consultant for Construction of International Cricket Stadium and Sports Complex at Suryanagara 4th Phase, Jigni Hobli, Anekal Taluk, Bengaluru
DISTRIBUTION AND CAR VEHICLE TENDER
Construction welcome arch near chittavwadagi in Hosapete city and installation of name boards in various roads of various wards and other development works
Design Supply Installation Testing And Commissioning Of Plastic Blown Pouch Film Plant at Bengaluru Dairy.
EV BATTERY SWAPPING STATION AT YELAHANKA NEW TOWN, 120sqft, Rs.16,926/- per Month (including GST), EMD Rs. 11,284/-, License period 36 Months.
Construction of 125 Bed Multi specialty Hospital at Hebbal Constituency, GKVK Premises Bengaluru North Taluk, Bengaluru
Supply, Installation and Commissioning of Medical Equipments, Instruments and Hospital Furnitures to Primary Health Centre, Ramdurga and Ganadal
Supply of FOUR WHEELER LIGHT VEHICAL BASEDE ON RENT to DEPARTMENT FOR THE EXECUTIVE OFFICER TALUK PANCHAYAT, SINDAGI for the year of 2025-26
SH-90, Hunasuru-Talakaveri Road (via Virajpet-Napoklu- Nalaknadu-Bhagamandal) Drain construction work in selected reaches of the road (Panchavalli village limit) in Periyapatna Taluk, Mysore Dist
Selection of Licencee for Two Wheeler/Car Parking at Udupi V.S.Acharya Bus Stand
Construction of bridge at km 1.00 in Kavaluru-Bannikoppa MDR road in Koppal District Koppal Constituency
Construction of Paver Road at Hari nagar near gajanan maharaj mandir under TMC chikkodi
Construction of Arts & Crafts room and Library Building in the premises of Deputy director of preuniversity (DDPU) office at Chikkodi town of Chikkodi Taluka and Belagavi District.Under the head of 8443 Deposit Contribution (DMF)
Providing and fixing of Street light at ward no 21 Under TMC Chikkodi
Development of road at ward no 20 Kamakar plot under TMC Chikkodi
Construction of New Building
Providing Consultancy Services for preparation of Detailed Project Report (DPR) for Economic Analysis, Survey, Plan, Design, Preparation of Estimates, Cost Structure etc., for Establishment of Knowledge, Wellbeing and Innovative City (KWIN City) at Phase-4 & Phase-5, Doddaballapura and Nelamangala Taluk, Bengaluru Rural District