Loading…
Loading…
28,609 results • Latest
Drilling of 03 number of new bore wells for kadadenahalli road old pump house at cmc malur limits
Supplying of spare parts like GI pipes and PVC cables to cmc malur limits
Re drilling of existing borewells pradeep reddy layout borewell mathrusree layout borewell Rajeev nagara ashraya layout KLE school back side borewell tenginatopu area and garadi mane area total 06 numbers at cmc malur limits
Drilling of 02 number of new bore wells and 01 number of re-drilling of bore for Bangalore road pump house at cmc malur limits
Ready to use application software on Cloud Enable Fund Based Online Finance Management System for Comptrollers office, University of Agriculture Sciences, Mandya.
Construction of Post Metric Boys & Girls Hostel Building Works for Minorities at 05 Locations (G plus 1 Floor) in Different Taluks of Belagavi & Bagalkote Districts. (Fixed Price No Variation) Package 3 - Mudalagi Place, Chikkodi Place, Chikkodi (Girls Hostel) Place, Ilkal Place, Jamakhandi Place GST shall be paid separately
CONSTRUCTION OF 2 CLASSROOM BUILDING FOR GOVT HIGHER PRIMERY KANNADA SCHOOL IN TAPAKARAVADI VILLAGE OF CHIKKODI TALUKA (DAIS NO-29300512601)
Providing DEO and Driver on outsource basis to Office of the Deputy Commissioner of Excise, Belagavi North District, Chikkodi
Construction of Minority Welfare Department, Morarji Desai Residential School at Hirekodi Village, Chikkodi Taluk in Belagavi District
Improvement of the road State Highway-12 to Kerur- Kadapur to join State Highway-12 from km no. 0.00 to 3.00 in Chikkodi-Sadalga assembly constituency of Chikkodi taluk (From Bijapur Sankeshwar Road to Kerur) under 4059 CMIDP for 2025-26.
Construction of drain at Vittal damodar nagar Kore nagar gate to garabude advocate under TMC chikkodi
CONSTRUCTION OF ATAL BIHARI VAJAPAYI RESIDENTIAL SCHOOL COMPLEX (BC) AT KHADKALAT, CHIKKODI TALUK, BELAGAVI DISTRICT
BUILDING CIVIL WORK
TO PROCURE ELECTRICAL ITEMS TO HIMS HAVERI ON ANNUAL RATE CONTRACT BASIS
RFP FOR RENEWAL OF AMC FOR HPE IT DEVICES OF KSDC WITH THREE YEARS SUPPORT
Maintenance of Pathapalya to Andrapradesh Border via Naremadepalli - Ramanupadi - Chakavelu - Kottampalli road at Ch 0.00 to 22.00 and 24.00 to 25.00 km for the year 2026-27 in Bagepalli Taluk, Chickballapur District.(Reserved for Cat-2A)
Annual Maintenance of Road from NH 173 Kamsagara gate to join Keresanthe road via Pattangere, Ballekere, R.G.Kopplu, NH 206 Bylubasappana Temple Madalu, Huligundi at ch 4.00 to 5.00 km 5.75 to 10.57 km 11.44 to 22.00 km in kadur taluk(ST)
TENDER FOR SUPPLAY FOR Varies Equipments to Anneshwara Grama Panchayathi
Repairs works to Store room, Admin guest house and compound Grill works at Bhadra CADA Campus Malavagoppa Shimoga (Reserved for SC)
Replace and repair to Internal Electrical wiring to Admin office block in Bhadra CADA campus
Disposal of Scrap Materials at Kolar Dairy Premises
Maintenance of Palyakere to Andrapradesh Border via Nallagutlapalli - Mugireddypalli - Pulagal - Odavaripalli Road at Ch 0.00 to 5.70 and 11.30 to 16.00 km for the year 2026-27 in Chelur Taluk, Chickballapur District. (Road Ch 0.00 to 16.00 km)(RESERVED FOR SC category)
Maintenance of BGT road to Maraganakunte via Mullangichetlapalli - Devikunte Road at Ch 0.00 to 6.53 and 15.53 to 16.00 km for the year 2026-27 in Bagepalli Taluk, Chickballapur District. (Road Ch 0.00 to 16.00 km) (Reserved for CAT-2A category)
Annual maintenance of Road From 62/5th mile of M.G.Road to Join Chikkaballapur - Melekote Road via Poshettihalli From ch-4.20 to 15.70km(ch-0.00 to 16.10km)(others category)
Maintenance of Somanathapura to Chilakalanerpu via Yagavanettaguntapalli - Palyakere - Machanapalli Road at Ch 0.00 to 13.65 and 15.90 to 16.80 km for the year 2026-27 in Chelur Taluk, Chickballapur District. (RESERVED FOR SC CATEGORY)
Annual Pump and Motor Maintainance Work
Procurement of Computer and other Electronic Materials
Annual RO Plant Maintainance,Supply and Service
Providing Irrigation Facility by Digging Borewell in the lands of (1) Shri Shaila Rudrappa Govindagol of Shiragaon Village & (2) Shri Vinayak Parappa Shiragaonkar of Shiragaon Village, in Hukkeri Taluka Dist-Belagavi (SCP/2025-26)
Drilling of borewell And installation of motor pump Near RO Plant in Khandasari Tanda at Ward No. 33.
Drilling of borewell And installation of motor pump Near Maradi Basaveshwar Temple at Ward No. 34.
Filling Potholes to Highway Connecting Hampi, Kamalapura, Hagarebomnahalli via Papnayakanahalli, Joga, Tolur, Lingadahalli, Rajapura, Bilgatte, Chick Joganahalli, MB Aaikanahalli, Banavikal, Kottur, Dopadahalli, Benalkal road from km 160.00 to 182.35 in selected reachas Kotturu taluku Vijayanagara District.(HOA 3054 SH MAINTENANCE)(Reserve for SC Catogery
Filling Potholes to MDR-31103 Road from Kotturu (on SH131) connecting Banavikallu (on SH131) via Kodihalli, Rampura, Sunkadakallu, Palayyanakota, Suladahalli road from km 0.00 to 24.34 in selected reachas Kudligi taluku Vijayanagara District.(HOA 3054 MDR MAINTENANCE)(Reserve for SC Catogery)
Filling Potholes to MDR-31097 Road from Hulikere (on NH50) connecting Hudem (on SH225) via Sakalapuradahatti, Yambale, Vaddarahatti, Piccharahatti, Kallahalli, Malehalli, Tahippehalli, Katrikehatti, Hosuru road from km km 0.00 to 21.28 in selected reachas Kudligi taluku Vijayanagara District.(HOA 3054 MDR MAINTENANCE)(Reserve for Catogery-2A)
Filling Potholes to MDR-31102 Road from Hurlihalu (on SH223) connecting Katrikehatti via Chikkajogihalli, Jummobanahalli, Poojarahalli road from km km 0.00 to 17.66 in selected reachas Kudligi taluku Vijayanagara District.(HOA 3054 MDR MAINTENANCE)(Reserve for Catogery-1 )
Filling Potholes to Highway connecting Arabhavi with Challakere via Gokak, Naragund, Shalavadi, Sirahatti, Mandaragi, Hadagali, Itagi, Ujjani and Jagalur road in selected reachas from km 245.00 to 260.61 in selected reachas Kudligi taluku Vijayanagara District.(HOA 3054 SH MAINTENANCE)
Annual maintenance of the road from Singanathanahalli to Kaddiramapura Road (Hampi Road), from Km 0.00 to Km 2.71, in Hosapete Taluk, Vijayanagara District.(HOA 3054 MDR MAINTENANCE)
Annual maintenance of the road from Hosapete to Amaravathi Road (Sai Baba Circle), from Km 0.00 to Km 1.81, in Hosapete Taluk, Vijayanagara District.(HOA 3054 MDR MAINTENANCE)
Annual Maintenance of MDR-31084 Road from Gudekote (on SH131) connecting Chirathagundu Cross (on SH223) via Gandabommanahalli, Thimmanahalli, Chirathagundu road from km km 0.00 to 17.29 in selected reachas Kudligi taluku Vijayanagara District.(HOA 3054 MDR MAINTENANCE)
Filling Potholes to MDR-31087 Road from Moraba Cross (on NH50) connecting Chikkakumbalagunte via Moraba, Chowdapura, Gunasagara, Suladahalli, Harakabhavi, Bellikatti, Byluthumbaragudd, Ranganathanahalli road from km km 0.00 to 30.14 in selected reachas Kudligi taluku Vijayanagara District.(HOA 3054 MDR MAINTENANCE)(Reserve for Catogery-2A)
Filling Potholes to SH40 Highway connecting Mylara with Thoranagallu via Hadagali, Hagaribommanahalli and Kudlagi road from km 97.19 to 112.16. in selected reachas Kudligi taluku Vijayanagara District.(HOA 3054 SH MAINTENANCE)
Construction of Remaining Stormwater Drain from Rahim Nagar Main Road to the CD near Guddodagi Thota in Ward No 34 of Vijayapura City.
Shifting of electrical line for road widening purpose in ward no 24 and 25 under the jurisdiction of Vijayapura City Corporation.
CONSTRUCTION OF BRIDGE ON GUDGUR BEVINAHALLI ROAD AT KM 0.40 IN RANEBENNUR TALUK, HAVERI DISTRICT
Construction of FootBridge Across Stream On Rayapatna-Gouliwada In Haliyal Tq UttaraKannada District.
Earth Work Excavation For Foundation PCC 148 For Foundation RCC m25 Concrete For Raft Abutment Girder And Deck Slab TMT FE 550 Steel RCC Hand Rails
CONSTRUCTION OF FOOT BRIDGE AT NEAR MAJALAKUPPE HADI VILLAGE IN H.D.KOTE TALUK, MYSURU DISTRICT
Advance work to be taken for CA planting 2027 rains including raising of Nursery work 25 Ha at Hebbul Fs. 72 of Mastikatta Range (03-CA-CAMPA)
Advance work to be taken for CA planting 2027 rains including raising of Nursery work 25 Ha at Vaidyheggar Fs. 52 P-I of Ramanguli Range (03-CA-CAMPA)
Advance work to be taken for CA planting 2027 rains including raising of Nursery work 25 Ha at Vaidyheggar Fs. 52 P-II of Ramanguli Range (03-CA-CAMPA)