Loading…
Loading…
28,523 results • Latest
Construction of Administrative Block for CAR at APMC Kangrali in Belagavi
Selection of Consultant for Preparation of Detailed Project Report (DPR) for Development of Suspended String Rail Transport System at Gokak Falls, Belagavi
Carrying of detailed topographic land plan survey of Mudhol Nippani (SH-18) Road in Chikodi Division Belagavi dist under 3054-SH-Maint for the year 2025-26
RCC AND FINISHING WORKS
Road asphalting in Kadoli village of Belgaum taluk
Improvement of Approach Road at Muchandi for MDR Road Hallur-Karavi-Budryanur-Muchandi to SH-54 Road at Km 8.20 Under HoA 3054 MDR Maintenance for the year 2025-26 (Reserved for Cat-I)
Reconstruction of the bridge at chainage 1.80 km on the Annuru Gaddige road, H.D. Kote Taluk
Creation of electrical network by creating infrastructure by extending 11kV HT lines, erection of 25KVA, enhancement of 25KVA by 63KVA 1-Star Rated Distribution Transformers and extension of 3 phase 4 wire LT line for energisation of 202 nos. of Irrigation Pump Sets below 500 mtrs from existing electrical network registered and regularized by paying Registration Charge of Rs. 50/- and RR. No. issued in O&M Sub Division, RSD,Navalgund,Kundagol & CSD4 of O&M Urban and Rural Division, HESCOM,Hubli on Total Turn Key and Lump Sum Basis.
Creation of electrical network by creating infrastructure by extending 11kV HT lines, erection of 25KVA, enhancement of 25KVA by 63KVA 1-Star Rated Distribution Transformers and extension of 3 phase 4 wire LT line for energisation of 400 nos. of Irrigation Pump Sets below 500 mtrs from existing electrical network registered and regularized by paying Registration Charge of Rs. 50/- and RR. No. issued in O&M Sub Division, Rannebennur-1 & Byadagi of O&M Division, HESCOM, Rannebennur on Total Turn Key and Lump Sum Basis.
Advertisements on Hording at Sulepet bustand
Construction of New Anganwadi Building No10 at Bastwad village in Belagavi taluka (Convergency work MGNREGA)
Creation Of Electrical Network By Creating Infrastructure By Extending 11kv Ht Lines, Erection Of 25kva, Enhancement Of 25kva By 63kva 1-star Rated Distribution Transformers And Extension Of 3 Phase 4 Wire Lt Line For Energisation Of 103 Nos. Of Irrigation Pump Sets Below 500 Mtrs From Existing Electrical Network Registered And Regularized By Paying Registration Charge Of Rs. 50/- And Rr. No. Issued In O&m Sub Division, Ron Of O&m Division, Hescom, Ron In Hescom On Total Turn Key And Lump Sum Basis.
PROVIDING ESSENTIAL SERVICES OF MAIN STAGE, GREEN ROOM, BARRICADING, CHAIRS, LIGHT TRUSS, LATTICE PENDAL, PIPE PENDAL, SHAMIYANAS, OCTAGONAL STALLS, BARRICADING, INSTALLATION, AND OPERATION OF LIGHT AND SOUND SYSTEM, D & B SOUND, DRUM KIT, PERCUSSIONS GUITAR, BASS, KEYBOARD AMP AND STAGE LIGHTING WITH TRUSS, VIDEO DISPLAY, VIDEO CAPTURE AND HIGH DEFINITION VIDEO MULTI CAM LIVE FEED AND TRUSSING WITH SPECIAL EFFECTS AND DIESEL GENERATOR BACKUP ETC FOR MADIKERE DASARA UTSAVA 2026
Design, Supply, Erection, Testing and commissioning of 500MTPD Cattle Feed Manufacturing Plant at Bengaluru Dairy Milk Catchment area Benglauru on Turnkey basis.
Annual Maintanence of Udyavara Ambagilu road from KM 0.00 to KM 5.90 & KM 6.18 to KM 9.25 in Udupi Taluk.
Construction of Checkdam cum causeway across halla near sy no 169/1 in Habakanahalli Village, Dabbeghatta hobli, Turuvekere taluk, Tumkur district.
Construction of New Impounding Reservoir at Government Land Survey No. 115 of Turukanadona village for Drinking water for Turukanadona and Hirapur villages in Raichur taluk of Raichur District
For The Year 2025-26 Annual Mentainance to (1) Gajendragad-Shorabha Sh-136 Road from Km 155.97 to 169.10 & 169.533 to 181.87 (Km 25.19) (2) Kalmala-Shiggaon SH-23 Road from Km 203.75 to 207.58 & 209.46 to 229.28 (Km 23.65) & (3) Chikkahesarur-Mudagal Mundargi SH-129 Road from Km 183.42 to 193.19 (9.77) in Mundargi Taluka of Gadag Dist.(Reserved for Catogery-I)
Raising of Monsoon Plantation (Including Purchase of Seedlings) at Chettinad Factory area-3Ha in Chincholi wildlife range during-2026-27
Providing catering services for U.G. & P.G Students Hostel mess at VTU Regional Centre Mysuru
Combined Package for, Work-A) Replacement of 1x8MVA, 66/11kV Power Transformer-1 by 1x20MVA, 66/11kV Power Transformer at 66/11 kV Attigulipura Sub-station in Chamarajanagara Taluk and District. Work-B) Replacement of 1x8MVA, 66/11kV Power Transformer-2 by 1x20MVA, 66/11kV Power Transformer at 66/11 kV Attigulipura Sub-station in Chamarajanagara Taluk and District. Work-C)Replacement of 2x8MVA, 66/11kV Power Transformer by 2x20MVA, 66/11kV Power Transformer at 66/11kV Ramapura Sub-Station in Hanur Taluk, Chamarajanagara District. Work-D) Replacing 1x6.3MVA, 66/11kV Power Transformer by 1x20MVA, 66/11kV Power Transformer at 66/11kV Bommalapura Sub-station in Gundlupete Taluk, Chamarajanagara District. Work-E) Replacing 1x8MVA, 66/11kV Power Transformer by 1x20MVA, 66/11kV Power Transformer at 66/11kV Sathegala Sub-station in Kollegala Taluk, Chamarajanagara District on Partial Turnkey Basis, including Supply of all Materials/Equipments(Excluding supply of 11kV Switchgear) and Erection (including dismantling & Civil Works) of all Materials/Equipments, Testing and Commissioning.
Providing Data entry operator, Driver and D Group through outsource Gadag Forest Division
Construction of concrete road and CD from Malathesha Hallera house to Bevinahalli road in Sunakallabidari village
Disposal of Scrap Materials at Hassan Dairy Premises
Disposal of Scrap Agriculture Machinery belongs to SKDRDP Panemangaluru Village, Bantwal Taluk
Improvements to Road at Kachanayakanahalli Village, Hennagara Grama Panchayath Limits, Jigani Hobli, Anekal Taluk. Under MLA Grants
PROVIDING MANPOWER SERVICES TO WORK UNDER QUALITY ASSURANCE SUB DIVISION KUSHALANAGARA, COORG DISTRICT FOR THE YEAR 2026-27
Construction of CC road and other allied works from Ch. 14.350 km of RBC to Ch. 15.000km of RBC via Haroshivanahalli grave yard, Uyyamballi G.P. under Atchkat of RBC in Kanakapura taluk
Maintenance for Road Furnitures 2025-26 in Channarayapatna Taluk (1)Holenarasipura-Didaga-Dabbegatta Road (2)Melukote-Shravanabelagola (3)Nuggehalli-Mattanavile-K.R.Pete (4)Bettadahalli-Mattanavile (5)B.M.Road to Parama Road (6)Sharavanabelagola-K.R.Pete road to Hirisave-Belagola (7)Hirisave Chattahalli from SH-8 to Shravaneri Road via GSN Road (8)G.S.N. road to Yaliyuru-Annanahalli Road
Procurement of Pump Motor Items for Chunchanakuppe Gp for the year 2026-27
Purchase of pumping machinery to bore well various places in Bidar City
YEARLY MAINTAINANCE OF REWINDING OF 2 HP TO 20 HP MOTOR AND PUMPS IN WATER SUPPLY CMC JAMKHANDI
Providing Manpower Services to DD KVI ZP Gadag
IN HAVERI CITY TALUK HEALTH OFFICE GROUND CONSTRUCTION OF STAIR TO RESIDENCE, INSTALL 2NO AC AND 1 K V UPS AND SOLAR TO RESIDENCE, CONSTRUCTION OF 2 WHEELER SHED At HAVERI Taluk office in Haveri Taluk of Haveri District.
CONSTRUCTION OF 30 NOS (24 PC & 6 PSI) QUARTERS AT VARIOUS LOCATIONS IN RAICHUR DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE NO.79 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS -CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
CONSTRUCTION OF 2 PSI QUARTERS AT RAICHUR DISTRICT ON LUMP SUM TURNKEY BASIS USING - CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE)(SC Category work)
Improvements To State Highway Madhugiri -Hindupura at Andra Border In Madhugiri taluk
Annual Maintanance of road year of 2026-27 Highway connecting Kengal (on NH-275) to Alur (on SH-110L) via Kanva, Dasawara, Makali, Ujjani, Hithalapura, Huliyurdurga, K Honnamachanahalli, Keelara, Hanchipura, Paduvagere, Hanumapura Gate (on SH-84) Kodavatti, Yadiyur,(on NH-75), Bilagunda, Mayasandra,/Soravanahalli (on NH150A) Bochihalli, Talkere, Aralikerepalya, Vishwanathapura, (on NH-150A), Turuvekere, Nonavinakere, Hedgarahalli, (on SH-47) Hunaseghatta, Sasalahalli, Dasarighatta cross, Kenkere (on SH-71) Edigarahatti, Gandasi (on SH7) Mahadevrahalli, Bageshpura, (on SH-102) Neeragunda, Nittur, Rayapura, (on SH-21) Kadadaravalli (on NH-373), Chikkagadduvalli, Kalatammanahalli, Doddakanagal (SH-275) road from ch 134.57 to 136.67 km and 137.07 to 137.27km and 138.27 to 140.47 km ( 133.36 to 147.59 km and 154.82 to 160.93km)
Establishment of Knowledge, Wellbeing and Innovation City (KWIN City) of Sector-2 of Phase-2, Doddaballapura & Nelamangala Taluk, Bengaluru Rural District
Providing additional 1X10 MVA, 110/11 kV Transformer at 110kV Navalagi sub-station in Jamakhandi taluk, Bagalkot district., including supply of equipments / materials, erection, civil works, testing and commissioning on Partial Turn Key Basis.
Establishing 2x12.5 MVA, 66/11kV Sub-Station at Hanike(Channapura) and Construction of 66kV LILO line from existing 66kV Chikkamagalur - Kalasapura SC line to the proposed 66/11kV Hanike sub-station using Coyote conductor for a distance of 0.313 kms in Belur taluk, Hassan district excluding 12.5MVA Power transformer and 11kV switchgear on PTK basis.
SUPPLY AND INSTALLATION OF TWO TIER COTS AT VARIOUS HOSTELS FUNCTIONING UNDER THE BACKWARD CLASS WELFARE DEPARTMENT ACROSS KARNATAKA
Road Safety Works on Highway connecting Hoskote with Gownipalli via Chintamani (SH 82) from KM 3.90 to 4.20 KM (Near ECom Express Company, Chokkahalli Gate and Chokkahalli Factory Gate) in Hosakote Taluk Bangalore District
Improvement to service road, restoration of banking in selected reaches & repairs to canal lining portion including raincuts of Sonthi Main canal from Ch Km 0.00 to 10.00 in selected reaches.
General Shop no-09 at Sedam Bus stand (SHOP NO 09) Vacant Going on 09.12.2026
Suppliers/Manufacturers/Dealers/contractors for the rated supply and installation of equipment on Civil, Mechanical, Electrical, for the preparation of estimates in Ramanagara Channapatna Hi-Tech Cocoon Market Phase-1 in Channapatna Taluk.
Repair of AEE office in Main Market yard, APMC, Hubli under AAP 2025-26 (CAT-IIA)
Detailed Survey drawing, Plan and Structural Drawing, Detailed Estimate with furnish in all respect and successful completion of project
Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning of MS Pipe Rising Main from IPS-03 to Malur and Other Industrial Areas, Land Acquisition, 5 years of O&M for Providing & supplying fresh water to the industrial areas in districts around Bengaluru on EPC Basis. (Package-4) 2nd call.
Selection of Consultant for Preparation of Detailed Project Report for Destination Development of World Heritage site Hampi Arts, crafts and Cultural village, Restoration, Last mile connectivity, Interpretation and other Tourism Infrastructure Facilities at Kamalapura, Hosapete, Hampi, Vijayanagara District under CEPMIZ Scheme.