Loading…
Loading…
24,180 results • Latest
Bed clearance and Piping closing to Bhogapateli Distributary, Sampur Minor and Kasarda Sub-Minor.
Drain work
SH 50 to Sanjharan_Road_Renewal coat with PMC and Sealcoat ,Retaining Wall,_0.000 to 2.700 0.500 to 0.700
Construction of 11 KV line LT line and Substation in favour of Principal Govt. ITI Parjang towards power supply to 9 nos Govt. Quarters 3 KW each and 2 nos Hostel 18 KW each in electrification scheme under RW Electrical section Dhenkanal
COMPREHENSIVE FACILITY MANAGEMENT SERVICES (CFMS) AT NIRMAN SOUDHA (OLD AND NEW BUILDING), BHUBANESWAR.
Construction of shed and steps at premises of Bhatarika Temple on Mahanadi left.
12554-ConstructionPaddy Procurement Center Building at Kumbhariput in the District of Koraput during the year 2025-26
AC in Newly Constructed Bar Association Hall Building for J.M.F.C. Court Building at Biramitrapur Buildings.
Infrastructure Development of Ranipur Jharial at Bangomunda Block in Bolangir District Part 1
NH-6 to Parabhadi road_Road_Renewal coat SDBC and Side shoulder_0.000 to 0.835 1.232 to 2.375
Provision of 100KVA, 11/0.4KV Substation for Power Supply to Hostel of Odisha Adarsha Vidyalaya, Lathikata for the year 2026-27.
12556-Construction Paddy Procurement Center Building at Almonda under Bandhugaon in the District of Koraput during the year 2025-26
Extension of Mini Park near Balugaon College in Ward No.02
12566-building-Repair to Revenue Staff Qtrs at Koraput during the year 2026-27
Constructions of Road from House of Bhaskar Chandra Naik Srikrushna Vihar Ranki (Bhalukipatla Lane-3) to Jena Sahi Ranki, Sirispal GP
Building Works
NH-6 to Tamhajhari Road_Road_Renewal coat SDBC and Side shoulder_0.021 to 0.530 0.967 to 1.510 1.649 to 1.800 2.074 to 3.006
12563-Construction of KGVB Hostel building at Sanganna High School at Laxmipur Block in the district of Koraput for the year 2026-27
Building Works
Improvement to Tentulia Badakhandeita Road in the District of Jagatsinghpur under MMSY-Improvement to Existing RD Road for the year 2026-27
S/R to Chandol Danpur road such as cleaning and raising of depressions and pot hole repair from Ch- 0/000km to 2/500km in the district of Kendrapara for the year 2026-27.
Improvement to Uttarsasan Tentulia Road in the District of Jagatsinghpur under MMSY-Improvement to Existing RD Road for the year 2026-27
Improvement such as widening and strengthening of Gosala to Chipilima road from 0/000 km to 11/998 km in the district of Sambalpur under State Plan
Immediate Repair and Restoration for Birupa Right Embankment Benipur to Ghantapada upto Indupur road (Such as filling potholes with GSB grade-IV and flank dressing ) in the district of Kendrapara from 0/000km to 9/210km
Building Works
S/R to Angulai Orta road from Ch- 0/00km to 9/00km such as filling patch repair in GSB Gr-IV material for the year 2026-27
S.R to Orta Badhi via Bijayanagar road from 0/100km to 1/255km, 2/500km to 7/500km and 8/500km to 13/200km such as filling patch repair in GSB grade IV material for the year 2026- 27
Improvement such as widening and strengthening of the road from Dalgaon to Tilia from 0/000 km to 11/800 km and Charpali to Dangaghat road from 3/500 km to 5/000 km with Rampella bridge approaches (1.500 km) in the district of Jharsuguda under CRIF
Three times grass cutting of Right spillway and Power Dam area for the year 2026-27
Improvement such as widening and strengthening of Bundkamal to Chinimahul via Sagra and Mundalasa road from 0/000 km to 8/895 km ( except from 3/089 km to 5/600 km) in the district of Sambalpur under State Plan
S/R to Patkura Garadpur road from Ch- 1/00km to 5/000km such as filling patch repair in GSB Gr-IV material for the year 2026-27.
BARD road to Jamkhol_Road_Providing depression filling with WMM, SDBC and Berm dressing_0.000 to 2.460
Design, Drawing, Const. Testing and Comm. of S/S, 120 KLD Sewage Treatment Plant (STP) and 30 KLD Effluent Treatment Plant (ETP) for Sub-division Head Quarter Hospital in Champua, Keonjhar including Operation and Maint.for a period of Five Years
BALIABEDA TO JARKANI_Road_Renewal coat SDBC and Side shoulder_0.000 to 0.200 0.356 to 0.412 0.419 to 0.918 1.181 to 1.412 1.532 to 1.686 1.842 to 2.282 2.552 to 3.866
42/6673-S/R to Chakradharpur to Krushnadaspur_Road_SDBC and overlaying damaged CC _1.000 to 3.500 for 2026-27
Supplying and Installation of Testing and commissioning Water Purifier Cooler SS UV Model at Sishubawan PG Hostel, Kataka
Improvement of water supply system at Chahata Lane-02 and lane-03 under Rent Section CDA Kataka
Construction and Maintenance of RD road to Taramanguda under MMSY Scheme in the district of Gajapati for the year 2026 2027
Building Work
Building Work
42/6667-S/R to Nuagabada to Tilada_Road_BT repair with PMC and SC_1.400 to 2.880 for 2026-27
Building Work
Building Work
Building Work
Repair to Bridge overLocal nalah at 3.1km on Mruganayani to Singiti_Road_Wearing coat ,approch road -CC- , colouring,Retaining wall-80mtr-,stone packing_3.200 to 3.240-LA- , 3.310 to 3.450-RA-
T2 to Farsibandha_Road_WBM Gr-III,PMC ,SC_0.000 to 0.400
Kopara to Ambligaon_Road_SDBC_1.500 to 3.271
Domundi Chhaka to Bhoragal _Road_SDBC and CC_0.200 to 2.800 2.800 to 3.000
P.K Road to Patelia Road _Road_SDBC_3.000 to 6.000
R.D road to Sankhatira via- Davar_Road_SDBC and C.C_0.000 to 1.300 and 1.300 to 2.000