Tender Value
₹34.4 L
EMD Value
₹35,000
Closing Date
3 Sept 2026, 5:00 pm6d left
Executive Engineer
RURAL WORKS DIVISION, NUAPADA
Renovation and periphery development RW Division Nuapada_building
2026_CERWI_139608_1
RWNPD/Online-09/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
90 days
Nuapada
2 documents required · 2 mandatory
₹6,000
₹35,000
Yes
25 Aug 2026
25 Aug 2026
5 Sept 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
25 Aug 2026 - 2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalling & Removing old Damage R.C.C Chajja,Shelves, Fins & Parapet,Tiles etc. | 217.39 | sqm | 206.32 | ₹44,851.9 |
| 2 | Earth work excavation in foundation hard soil including moorum, stoney earth mixed with boulders with all leads and lifts including dressing and levelling the bed and depositing the excavated earth away from the work site with all leads and lifts including cost of all labour and T&P and cess required for the work and etc. complete in all respect and as per the direction by the Engineer-in-charge. | 152.65 | cum | 282.9 | ₹43,184.69 |
| 3 | Supplying, filling in foundation and plinth with sand in layers well watered and rammed including cost, conveyance, royalty of all the materials required for the work labour with T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. | 25.19 | cum | 633.5 | ₹15,957.87 |
| 4 | Providing cement concrete (1:3:6) in foundation and plinth using 4cm size clean hard black granite crusher broken metal of approved quality from approved quarry including hoisting, lowering and laying in layers not exceeding 15cm thick to the required level, ramming watering and curing etc.complete including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge | 101 | cum | 5,741.9 | ₹5,79,931.9 |
| 5 | Flyash brick masonry in cement mortar (1:6) in super structure using Flyash bricks of 23x11x8cm size having a crushing strength of not less than 75 kg./sq.cm including splays cutting, circular moulding, chamfering and cur belling, watering and curing etc. complete including cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. | 5.29 | cum | 5,564.8 | ₹29,437.79 |
| 6 | Cement concrete of proportion (1:2:4) using 12mm size hard granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete and compacting in layers not exceeding 15cm thick with proper packing and ramming each layer of concrete by means of vibrator including watering and curing etc.complete including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. | 6.58 | cum | 7,409.8 | ₹48,756.48 |
| 7 | Providing R.C.C work of M-25 grade with 20mm and down graded clean hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and smoothness to receive tar felting or terracing, watering and curing for four weeks,including centring, shuttering and finishing the exposed surface and ceiling smooth to receive white washing or painting providing grooves or beads and fan hooks as per requirement in ceiling where necessary, cost of water, including cost, conveyance, royalty taxes of all the materials and labour, T&P and cess etc. complete in all respect but excluding cost of M.S rods or Tor steel and binding wire 18 to 20 gauge and labour charges for straightening, cutting, bending and binding and tying the grills and placing in proper position as per specification and direction of the Engineer-in-charge. | 25.19 | cum | 12,323.2 | ₹3,10,421.41 |
| 8 | Cutting, bending, binding and tying the grills and placing in proper position as per drawing and design including cost, conveyance and taxes of M.S rods and binding wire with all labour T&P and cess required for the work etc. complete in all respect in all floors(weight of binding wires will not be considered as measurement of M.S rods) as per specification and direction of the Engineer-in-charge. | 12.59 | qtl | 8,917.2 | ₹1,12,267.55 |
| 9 | 16mm th Cement plaster in C.M (1:6) to brick work finished smooth including watering curing and scaffolding with cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. | 17.28 | sqm | 276.1 | ₹4,771.01 |
| 10 | Providing fitting and fixing of false ceiling with aluminium anodised T section no. 3215 with 2' - 0" center to center, L section no. 1705 upto 15 micron on 4 walls to be fixed by means of steel screw and PVC plug and the aluminium grid 2'- 0" x 2' - 0" suspended from ceiling using 12.5 mm th Gypsum board size 6' x 4' including cost, coveyance of all materials, taxes, labour, T&P, cess, and hire charges of drilling machine, labour charges etc. complete in all respect as per specification and direction of the Engineer-in-charge. | 109.9 | sqm | 1,280.4 | ₹1,40,715.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 4.39 MB
Tendernotice_1.pdf
PDF • 2.92 MB
BOQ_607252.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].