Loading…
Loading…
23,850 results • Latest
Construction of DUMERGHAT in Stream Storage Check Dam (Low Height Check Dam) Over Local Nalla Nalla, Near Village Kamalpadar in Gaisilet Block of Bargarh District under MATY-3 Scheme for the year 2026-27
Construction of road from Singhdeo tent house to Surendra Bag House at Sakhipada in ward no-29
Construction of Road at Krupasindhu Bihar in Ward No. 09
Construction of Drain near Parmanik House Haragouri Vihar ward no-28 under SMC Sambalpur
Bileigarh to Jogimal Road_Road_Pot hole repair and and SDBC_0.000 to 0.990
Building Work
Gurabasa to kinjirma upto safei Bridge_Road_Renewal coat of SDBC with Potholes and Shoulder Repair _7.860 to 9.160
Construction of Drain at Anguliapda, Ainthapali from Main Road Via Rajendra Mishra House, ward no-28 under SMC Sambalpur
Construction of BANDA- 2 in-stream storage structure (Low height check Dam) over Landijori nalla near village Banda in BARGARH Block of Bargarh District under MATY-3 Scheme for the year 2026-27
Panchayat to Guruduar_Road_Pot hole repair and and SDBC_0.000 to 1.326
Construction of Road at Laxmi Bihar, Sankarma ward no-28 under SMC Sambalpur.
Guthiapada to Geleibabal_Road_Pot hole repair and and SDBC_0.000 to 3.420
Construction of bridge over Dumermunda Nallah at 1.200Km on Rouldega PWD Road to Kelokhandi via Kurmidihi road
Improvement of road from Mahuldiha to Kumudi road under improvement to existing RD road for the year 2024-25 in the district of Sundargarh.
RD road to Bhulikucha Road
RD road to Dukantola Road
RD road to Khandamuni Road
NH-143 to Dharanidharpali Road
Bhatli Sohela PWD Road to Balijori Road
Construction of Samserpadar Road to Rautapada Road in the district of Nuapada under Scheme Mukhya Mantri Sadak Yojana (MMSY) for the year 2026-27
Construction of RD Road to Bandhapada in the district of Nuapada under Scheme Mukhya Mantri Sadak Yojana (MMSY) for the year 2026-27
Construction of NH-353 to Jharlarpada Road under Scheme Mukhya Mantri Sadak Yojana (MMSY) for the year 2026-27 in the district of Nuapada.
Construction of TENTALA in-stream storage structure (Low height check Dam) over Local nalla near village Tentala in BARGARH Block of Bargarh District under MATY-3 Scheme for the year 2026-27
Pre-khariff of Sukapaika North Channel from RD 11.470km to 17.617km, and Brahmankhanada Minor and Radhanagar Minor
Pre-khariff maintenance Disty. No. 5 (0.5) and Thoriapada Minor Disty. No 5(A), Disty No. 5(B) of T. Canal
Pre-khariff maintenance Disty. No. 6 (A), Disty No. 6 (C), 6(C1) of Disty No 6
Pre-khariff maintenance of Disty. No. 6, from RD 0 mtr to 6150mtr, Disty. No 6D and Disty No 6 (D1), Sibapur Mahara and Disty No 6(E) Taladanda Canal
Pre-khariff maintenance of Disty. No. 9, 9A of Taladanda Main Canal
Pre-khariff maintenance of Disty. No. 8D of Taladanda Main Canal
Weed clearance to Taladanda Main Canal from RD 8.750 km to 11.750km
Construction of PS Road to Colonypada via Birimuhan Road in the district of Kalahandi under Scheme Mukhya Mantri Sadak Yojana (MMSY) for the year 2026-27
Weed clearance to Taladanda Main Canal from RD 11.800km to 24.460km
Construction of Wall Lining in Bhejipadar Minor from RD 123m to 323m under Left Main Canal of Ret Irrigation Project
Construction of Wall Lining in Nisanpur Minor from RD 4195m to RD 4245m and Dongagundri Sub Minor from RD 60m to RD 144m under RMC of RIP
Construction of Wall Lining in Dhamankhunta Minor from RD 6190m to RD 6320m under RMC of RIP
Construction of Wall Lining in Tentulikhunti Minor under Left Disty System of LMC of RIP (From RD 680m to 880m)
Cement Concrete Lining and guard wall to Dukermal disty from RD 6140m to 6210.30m under UIP
RD road _Dudi Hatibada_ to Kindopada via Saptopi Road
Cement Concrete Lining and Guard wall to Abujabahal Sub Minor from RD 725m to 1191.50m under UIP
Pre-khariff maintenance to disty 13C from RD 5890m to 10761m(Bed Cutting and Jungle Clearance)
Turiposh Basti to Phulbari Road
Pre-khariff maintenance to disty 13 and Disty No. 13A from RD 00m to 3700m (Bed Cutting and Jungle Clearance)
RD road _Rajgangpur to Malidihi_ to Chhaparpada Road
Cement Concrete Lining and Guard wall to Risida Disty from RD 9760m to 9887.50m under UIP
Pre-khariff maintenance to disty 13 main from RD 3700m to tail end (Bed Cutting and Jungle Clearance)
Construction and Maintenance of PWD road to Dumbaguda under MMSY Scheme in the district of Rayagada for the 2026 2027
Protection to Right Bank of River Uttei near Uttei Diversion Wire from RD 0m to 150m
Talimunda khamarpada to Manoharpur Road
Pre-khariff maintenance to disty 13C from RD 00m to 5885m (Bed Cutting and Jungle Clearance)
S/R to Deng Tikirapada PWD road to Jharbahali via Surda road for the year 2026-27