Loading…
Loading…
24,014 results • Latest
42/6714-S/R to NH-5 to Mulisingh Road_Road_BT surface repair with BUSG and WBM SDBC over laying wearing coat of damaged CC and Retaining wall_4.000 to 6.380 for 2026-27
Construction of Nathama Check Dam (RG110083) in Rayagada Block of Rayagada District under MATY 3.0 for the Year 2026-27
Construction of Tayangiri Check Dam (RG110084) in Rayagada Block of Rayagada District under MATY 3.0 for the Year 2026-27
Construction of Garada Ambagachha Check Dam (RG110085) in Rayagada Block of Rayagada District under MATY 3.0 for the Year 2026-27
Construction of Goudakhilimi Check Dam (RG110086) in Rayagada Block of Rayagada District under MATY 3.0 for the Year 2026-27
Construction of Bedu Check Dam (RG110087) in Rayagada Block of Rayagada District under MATY 3.0 for the Year 2026-27
42/6670-S/R to Bartana to Garadi road_Road_BT Repair with PMC and SC_0.200 to 2.070 for 2026-27
CONSTRUCTION OF ADDITIONAL CLASSROOM AT INDRAPRASTHA PRIMARY SCHOOL, SUNAPOSI GP
CONSTRUCTION OF ADDITIONAL CLASSROOM AT BASUDEVPUR GOVT. UP SCHOOL, BHANDA GP
CONSTRUCTION OF ADDITIONAL CLASSROOM AT BNK HIGH SCHOOL, PURUSOTTAMPUR, KUTARIPOSI GP
Repair to Bridge over Kokoloba on PWD road to Baradanda_Road_CC Approach ,Renewal coat of BT and WMM for Left and Right approach damaged_1.120 to 1.420
L026-PWD Road to Kumbhipalli Via Kathachira_Road_Renewal coat of SDBC with WMM profile correction and shoulder moorum_0.850 to 2.150
L024-RD road to Raigochha_Road_Renewal coat of SDBC with WMM profile correction and shoulder moorum_0.200 to 2.020
PWD Road to Khariguda_Road_Renewal coat of SDBC with WMM profile correction and shoulder moorum_0.250 to 1.700
L045-PWD road to Madhabarida Via Benikpalli_Road_ BoxCell Culvert -3x6x3 -_At 0.600 km
Construction of NH-326 to Salbagan in the District of Malkangiri under Mukhya Mantri Sadak Yojana (MMSY) for the year 2026-27.
Bhatli chowk(Ashakiran Square) to Khaliapali road
INSTALLATION AND ENGERGISATION OF DARADAPATNA-II TW LI PROJECT
Construction of H.L. bridge over Dharakata Nallah on Birjupali to Madhudhipa Road
INSTALLATION AND ENGERGISATION OF ASARANA TW LI PROJECT
Construction of RD road to Purunakodeng in the District of Malkangiri under Mukhya Mantri Sadak Yojana (MMSY) for the year 2026-27.
Construction of Road from Kahapani to Orampada under MMSY-CMRL Scheme in the District of Sambalpur for the year 2025-26.
RD Road to Khamarbahal Via Taranga Road
Construction of RD Road to Nuaguda in the District of Malkangiri under Mukhya Mantri Sadak Yojana (MMSY) for the year 2026-27.
K.Barpur Ustia Road_Road_Renewal coat of SDBC with WMM profile correction and shoulder moorum_0.580 to 1.580
RD Road to Dhobakata Via Ardabahal Road
L049-RD road to Patulisahi_Road_Paver Block on damaged CC road_0.400 to 0.661
L043-PWD road to Meripeta Via Basudevpur Road_Road_Renewal coat of SDBC with WMM profile correction_0.500 to 1.500
L045-PWD road to Madhabarida Via Benikpalli_Road_Renewal coat of SDBC with WMM profile correction and RCC Retaining wall_0.780 to 2.780 1.400 to 1.500
Golabandh to Katei sahi Road
L030-PWD Road to Indanapur_Road_ RCC Retaining wall and Boxcell culvert -2x6x3 -_0.060 to 0.160and At 0.950 km
Construction of a dumping yard (Wastage)
Construction of Changing Room and Bathing Ghat and both side wall of Erasama Jagulai Pokhari
PWD Road to Juradanga Road
Lining work, Concrete work
Repair to Bridge over Boda Nadi on Chamunda RD Road to Nada via Chopra village Road_Road_Renewal coat of BT and WMM for Left and Right approach damaged_ 0.250 to 0.500
L035-SH 7 to Ambadoli_Road_RCC Protection work_0.060 to 0.160
Fire Fighting System
L027_PWD Road to Tantipadar_Road_Pot hole repair,Bush cutting,flank dressing_0.000 to 1.880
Repair to Bridge over Giringia Nallah on Jadadhar - Masabadi Road_Road_CC Approach ,Renewal coat of BT and WMM for Left and Right approach damaged_1.300 to 1.650
Fire fighting system
L051-Jagnathprasad Block Agyanprasad Chhak_Road_Renewal coat of SDBC with WMM profile correction and shoulder moorum_0.100 to 1.800
Aerosol based Fire supression system
Construction of Boundary Wall, Approach Road of R.I. Office cum Residence building at Chudamani in Dist of Bhadrak for the year 2025-26
Construction of Boundary Wall and Gate of RI Office, Karanjamal in Dist of Bhadrak for the year 2025-26.