Loading…
Loading…
24,014 results • Latest
RD road road to Kulthipali_Road_Pothole repair with PMC and SC, Bush Cutting0.000 to 1.598
INSTALLATION AND ENGERGISATION OF TAMPALDA-I AND MAHANAPARI-II TW LI PROJECTS
Improvement to Bhaliadala-II Check Dam in Telkoi Block of Keonjhar District under Improvement to Check Dam Scheme for the year 2026-2027
Supply and Installation of Fire and life safety equipment such as SITC of lightening protection system of different buildings New IPD Building G plush 5, New OPD G plush 2, Pathology G plush 1, DDC, Admn Building G plush 1, IPHL G plush 1, Kitche
Construction of Dhakdhaki Nala Check Dam near village Dhundigora of Bilaspur GP in Kantamal Block of Boudh District for the year 2026-27
Construction of 4 nos Flat Type F type Quarter Building at Dhama PHC for the year 2023-24
Construction of Dispensary Building of GAD Berhampura
Improvement to Padampur Check Dam in Keonjhar Block of Keonjhar District under Improvement to Check Dam Scheme for the year 2026-2027
Uperbahal to Kudadera road_Road_SDBC0.000 to 1.070
Estimate for LT line extension, Shifting of LT line Networks, Renovation of Existing 11/4KV, 100KVA Sub Station for LT 3 Phase 3 Phase Power Supply to 15 KW/16.66KVA CD for construction of 100 Seated Boys Hostel Odisha Adarsha Vidyalaya OAV KOTPAD
Improvement such as widening and strengthening of Chhepilipali corridor road to Panchamahala (NH-49) road from 18/000 km to 26/793 km in the district of Deogarh under State Plan
R.I Office Cum-Residence at Gallery_building
Maidalpur to Gadabakotra-Road-A-__ SDBC, Fixing of Road furniture 0.000 to 0.400
Improvement such as widening and strengthening of road from NH-53 to Deojharan via Surungipal from 0/000 km to 4/804 km in the district of Deogarh under State Plan
Construction of Goudtola Nimurla RD road to Gendupada road in the district of Bolangir under MMSY for the year 2026-27
Construction of Sisakani to Pipaldani road in the district of Bolangir under MMSY for the year 2026-27
Improvement such as widening and strengthening of Parubhadi chowk Brahmanidhi road to Kusmi road from 18/670 km to 31/384 km in the district of Sambalpur under State Plan
Operation and Maintenance of existing Sewerage System of different areas under WATCO Section, H.L. Tank, Bhubaneswar City
Talakot to Sindursil_Road_WBM Gr-III, PMC and Seal Coat_ 0.700 to 1.750
Construction of road from Sai International school (Trisulia-Banki PWD road) to Bhalunka Mundasahi via Industrial area road under MMSY-TRIP in the District of Cuttack for the year 2025-26
Improvement to Mundapadar to Jharial Road in the district of Bolangir under Imp. To Existing RD Road for the year 2026-27
PS Road to Sonversa_Road_Berm dressing, Bush Cutting and PMC Seal Coat_ 0.000 to 2.775
Construction of H.L. Bridge over Kaiana Nallah on Bilipada to to Mukundapur Road road under SBY in the District of Cuttack for the year 2025-26.
Infrastructure Development of Kusumi PTRCS in Mayurbhanj district
Rajamunda to Gharadhara_Road_PMC and Seal Coat_ 0.800 to 1.300
Construction of H.L. Bridge over Sunakhai Nallah on Naranpur to Kamalpur road under SBY in the District of Cuttack for the year 2025-26
Protection to scoured bank on Mahanadi left from Odasingha to Chakragada
Construction of toilet block including internal and external P.H work, E.I work at Govt UG High School, Rengali in Bargarh District
Construction of Panimetla to Ambaguda road in the District of Malkangiri under MMSY-Transferred Road Improvement Programme (MMSY-TRIP) for the year 2025-26.
Construction of Belpada to Malijhar Road in the district of Bolangir under MMSY -TRIP for the year 2025-26
Construction of H.L. Bridge over Dhania Nallah on PWD road Nakhapada Chhaka to Balisahi PS road under SBY in the District of Cuttack for the year 2025-26
Supply and Installation of DG sets with ancillary arrangement at different Pump houses under WATCO Division, Puri
Restoration to RFB of river Rushikulya near village Kanhirapalli for the year 2026-27.
Request for Proposal for Engagement of Statutory Auditors for Comprehensive Region Urban Transport for a period of 5 years
Construction of road from RAN PWD road to Tinigharia via Krushnachandrapur , Khairapanga in the District of Cuttack for the year 2025-26
Restoration to RFB of river Badanadi near village K.Nuagaon for the year 2026-27.
Improvement of EI to ARCS office building at Boudh
Shifting of electrical infrastructure for widening work of Tilakmal Semilijora Naranprasad Dedhelmal Ambagaon road
Shifting of 11 Kv HT and LT lines and substation for construction of hl bridge over kutukeswar nallah at ch.8/130 km on purunakatak-dhalpur road in the district of Boudh
Up gradation and installation of panel board at different buildings such as Academic block workshop and Hostel at Government Polytechnic in the district of Boudh Buildings.
Shifting of electrical infrastructure 11 kv Ambagaon Nallah at Ch 48/900 km on Manamunda Kantamal Ghantapada Sindhiguda Road SH 41
Shifting of electric utility LT lines for improvement of road from PWD road at Palasa chhak to NH-57 via Rajanpalli and Panuasahi from 0/000 Km to 1/810 Km in the District of Boudh
Shifting of electrical infrastructure for the work Improvement such as widening and strengthening of Rakdol Phased Barapadar Keutipali road 11/000 km to 17/000 km in the district of Boudh
L023-RD road to Kamanasahi_Road_Renewal coat of SDBC with WMM profile correction and shoulder moorum_0.500 to 1.500
L021-RD road to Saranuapalli_Road_Renewal coat of SDBC with WMM profile correction and shoulder moorum_0.420 to 1.720