Loading…
Loading…
877 results • Latest
Construction and Maintenance of Road L037-(Link Road) From Basholi Bani Road KM 37th to Kund Package No. JK07-4032, PMGSY-IV, Batch-I of 2026-27, Block-Boond, District Kathua (Using Waste Plastics Length 4.600 Kms) Length 4.600 Kms
Construction and Maintenance of Road L040-(Link Road)KM 8th Beeru Basti to Dugli road to Gulla top Package No. JK04-4053, PMGSY-IV, Batch-I of 2026-27, Block-Bhalla, District Doda (Using Gbion Wall Length-9.320 Kms) Length 9.320 Kms
Construction and Maintenance of Road from L105-(Link Road) Mansar Sourap km 5th To Upper Sourap Package No. JK14-4021, PMGSY-IV, Batch-I of 2026-27, Block-Udhampur, District Udhampur. (Using Waste Plastics 10.500 Kms) Length 10.500 Kms
Construction and Maintenance of Road from L115-(Link Road) KM 77th of KK Behinamble PMGSY Road to Kayanar Package No. JK12-4560, PMGSY-IV, Batch-I of 2026-27, Block-Khawas, District Rajouri Length 4.500 Kms
Construction and Maintenance of Road from L040-(Link Road) Ghordi Khas to manlal Km 11th to Karlah Mandal Package No. JK14-4051, PMGSY-IV, Batch-I of 2026-27, Block-Chanunta Dalsar, District Udhampur. (Using Waste Plastics 3.850 Kms) Length 3.850 Kms
Construction and Maintenance of Road L053-(Link Road) Km 3rd of Hasplote Dhok road to Naban via Doi Mohallah Package No. JK12-4593, PMGSY-IV, Batch-I of 2026-27, Block-Thanamandi, District Rajouri Length 4.000 Kms