Loading…
Loading…
877 results • Latest
Construction and Maintenance of Road from L133-(Link Road) Bagta to Upper Dadura Package No. JK20-4037, PMGSY-IV, Batch-I of 2026-27, Block-Panthal, District Reasi. (Using Waste Plastics 3.500 Kms) Length 3.500 Kms
Construction and Maintenance of Road from L071-(Link Road) Chenani to Pattangarh Km 9th to Charka Package No. JK14-4059, PMGSY-IV, Batch-I of 2026-27, Block-Chenani, District Udhampur (Using Waste Plastics 4.200 Kms) Length 4.200 Kms
Construction and Maintenance of Road from L113-(Link Road) KM 3rd RD 200 of Kotecharwal Road to Reeti Package No. JK12-4521, PMGSY-IV, Batch-I of 2026-27, Block-Khawas, District Rajouri Length 10.000 Kms
Construction and Maintenance of Road from L026-(Link Road) Nadi Talab to Khandra Package No. JK14-4031, PMGSY-IV, Batch-I of 2026-27, Block-Tikri, District Udhampur. (Using Waste Plastics 5.200 Kms) Length 5.200 Kms
Constt. and Maintt. of Road L054-(Link Road) Kk road Km 14th to Nagarna Pkg No. JK17-4217, PMGSY-IV, Batch-I of 2026-27, Block-Thakraie, District Kishtwar (Using Waste Plastics -2.600) Length 2.600 Kms Adv. Cost excl. maintt. but incl. of GST
Construction and Maintenance of Road L036-(Link Road) PMGSY road to Ludder Package No. JK17-4210, PMGSY-IV, Batch-I of 2026-27, Block-Paddar, District Kishtwar 2.400 Kms Adv. Cost excluding maintenance but inclusive of GST-Rs. 564.85 Lacs