Loading…
Loading…
3,607 live2,003 closing this weekmost from Department of Local Government and Department of Water Resources
Published at eproc.punjab.gov.in, Punjab's official e-procurement portal.
3,607 results • Latest
Const. of Footpath Opp. Sat Guru Bhagat Kabir Mandhir Bhagro Camp
Const. of CC Streets in Kanshi Nagar, Kot Sadiq and Adjoining Area.
Construction of ITI at Tripari, Block Kharar District SAS Nagar, Punjab (Balance Work)
Supply of refreshment Diet for players in Day Scalar Sports Wings at Sri Muktsar Sahib From Session 2026-27 Distt Sri Muktsar Sahib
HIRING OF INSULATED ROAD MILK TANKERS
P/F Water Cooler with RO (Bus Stand and Main Bazaar)
Construction of Public Toilets and Urinal Blocks
Supply Of skilled and Unskilled Labour
Repair of Ramdasia sikh dharmshala
Construction of CC Road from Sher-e-Punjab Market to Sukhdaspura Mohalla Ward no 47 Est Cost Rs 40.34 lacs dt 19/21.10.2026
Restoration of Roads excavated by L and T for pipeline work in Alipur and aman nagar Est Cost Rs 41.61 lacs dt 19/21.10.2026
S/E of Poles and Lights for Jhill Park in W.No.13 of MC Patiala Est Cost Rs 6.83 lacs dt 19/21.10.2026
Reconstruction of Desraj Street, Bhindian wali gali and Jand Gali ward no. 42 Est Cost Rs 30.78 lacs dt 19/21.10.2026
Maintenance and Upgradation of Nehru Park Est Cost Rs 21.04 lacs dt 19/21.10.2026
P/L CC and tiles in WARD NO 31 VARIOUS STREETS (Ram Gali, Dhobi mohalla, Ravidas mohalla (Landi Kotal Gurudvara Backside), Adj. Landi Kotal Gurudvara, Streets adj. and opp. crackers market, Dera baba shrdagir bodi, Satyanarayan Mandir. 22.18 lacs
Laying of CC in various streets (Karimulla mohalla) of ward no 34 Est Cost Rs 15.82 lacs dt 19/21.10.2026
Renovation of municipal park, green park G block model town ward no. 58 Est Cost Rs 15.68 lacs dt 19/21.10.2026
RENOVATION/REPAIR OF PUBLIC CORRIDOR AT TP SCHEME,CHOTTI BARADARI, PATIALA Est Cost Rs 8.79 lacs dt 19/21.10.2026
Construction of CC Parking near Capital Car Bazar Choti Baradari Ward no 46. Est Cost Rs 73.27 lacs dt 19/21.10.2026
Construction of Clock Tower on Fire Brigade Chowk
Estimate for internal clearance of weed jalla deela sarkanda jungle booti dhora silt etc manually from inner section of concrete Lined Sheron disty RD 89500 to 98175 Concrete lined Minor Number 6 RD 0 to 21850 Brick lined minor number 7 RD 0 to 17735
Estimate for internal clearance of weed jalla deela sarkanda jungle booti dhora silt etc manually from inner section of Kotla Branch RD 60200 to 86000
Estimate for internal clearance of weed mjalla deela sarkanda jungle booti dhora silt etc manually from inner section of lined Longowal disty RD 12500 to 39840 Bahadarpur minor RD 0 to 3182 of Longowal Disty
Estimate for internal clearance of weed jalla deela sarkanda jungle booti dhora silt etc manually from inner section of Concrete lined Sheron disty from RD 98175 to 110289 Brick lined Minor number 9 RD 0 to 8330 Brick lined Minor number 10 RD 0 to 10
Estimate for internal clearance of weed jalla deela sarkanda jungle booti dhora silt etc manually from inner section of lined Longowal Minor RD 0 to18424 Batuha Minor RD 0 to 22470 of Longowal Disty
Replacement of 66 KV HRP Line from 66 KV S/S Pakhoke to Cheema with SC on DC Tower Line ACSR 0.2 sq Conductor (Planning No. 245/SZ/2025-26/Annexure-E) RDSS Work
Estimate for internal clearance of weed jalla deela sarkanda jungle booti dhora silt etc manually from inner section of Kotla Branch RD 122000 to 129450 Sheron Disty 0 to 10425 Longowal Disty 0 to 12500 Pedhni Disty 0 to 10380
Estimate for Clearance of weed Jalla Deela Sarkanda Jungle etc manually from inner section of Lined Channel Light growth of Barnala Disty 40000to93850
Estimate for internal clearance of weed jalla deela sarkanda jungle booti dhora silt etc manually from inner section of concrete Lined Sheron disty RD 63000 to 89500 Concrete Lined Minor Number 3 of Sheron Disty RD 0to 17450 Brick lined Minor Number
Estimate for internal clearance of weed jalla della sarkanda jungle booti dhora silt etc manually from inner section of brick lined sangrur disty RD 68660 to 95190 Minor 1 RD 0 to 6290 Minor 3 RD 0 to 23808 Minor 7 RD 0 to 11450
S/E of Street Light Pole YPS Chownk To Thikriwala Chownk Est Cost Rs 13.14 lacs dt 19/21.10.2026
Estimate for internal clearance of weed jalla della sarkanda jungle booti dhora silt etc manually from inner section of brick lined sangrur disty RD 33215 to 68660
Estimate for internal clearance of weed jalla deela sarkanda jungle booti dhora silt etc manually from inner section of lined Longowal disty RD 39840 to 79590 Bhaini Mehraj minor RD 0 to 29900 of Longowal Disty
Estimate for internal clearance of weed jalla della sarkanda jungle booti dhora silt etc manually from inner section of concrete lined sangrur disty RD 22000 to 33215 Minor 2 RD 0 to 9590 sub minor RD 0 to 10488 Minor 4 RD 0 to 14250 Minor 6 RD 0 to
Estimate for internal clearance of weed jalla deela sarkanda jungle booti dhora silt etc manually from inner section of unlined Sheron disty RD 34010 to 49500 concrete Lined Sheron disty RD 49500 to 63000 Brick lined Badrukhan minor RD 0 to 23997 Bri
Estimate for internal clearance of weed jalla deela sarkanda jungle booti dhora silt etc manually from inner section of Concrete lined Sheron disty from RD 110289 to 173804 and Brick lined Minor number 8 RD 0 to 14560
Estimate for internal clearance of weed jalla deela sarkanda jungle booti dhora silt etc manually from inner section of Kotla Branch RD 86000 to 122000
Estimate for Lining /Relining of watercourses of outlet RD 22275-R of Low Level Machaki Mr. of village Daggo Romana and Dana Romana District Faridkot Br. E E4 Length 1290 m by Laying Brick Masonry.
Upgradation of4 inch id DIK 7 water supply line and 10 inch id UPVC sewer line at Pritam Colony 33 feet road (Ward no.33) GQ (South Constituency)
Prov/laying/upgradation of 4 inch dia DIK7 water supply line at Grewal Colony, Simarjit Nagar, Raju Colony at East Cosntituency.
Upgradation of sewer line Payal Studio, Patwari wali gali to Ganpati Chowk and Dashmesh Dyeing Opp. Pawan Dhaba main line in W. No. 25.
Upgradation of 24x36 inch old dart Sewer line replace by 800 MM RCC NP3 HDPE lining at Dhandari Bridge to Disposal Phase 5
Annual rate contract regarding installation of 40 HP, 25 HP and 12.5 HP tubewell against failed tubewell in Zone A,B,C and D.
Providing Laying Upgradation of 10 inch dia and 12 inch dia UPVC SN 8 Supply line vishal colony and 4 inch dia DIK7 water supply at Grewal colony and amrit vihar at East Constituency.
Construction of Mahila Hut/Kiosks under Ramp Scheme, Sri Muktsar Sahib
Construction of Mandir Vaman Avtaar at old Mirch Mandi Sanouri Adda Patiala